NPDES GAR395A3D · Clean Water Act
4085 PRAIRIE TRAIL, Valdosta, GA: NPDES GAR395A3D discharge permit, effluent exceedances, inspections, penalties
4085 PRAIRIE TRAIL, Valdosta, Georgia: General permit coverage GAR395A3D, held by Jennifer Altman; Construction stormwater; Effective; issued August 1, 2018, term to January 31, 2025.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 30,681 were issued before GAR395A3D. Jennifer Altman holds 24 permits in Georgia.
Other permits held by Jennifer Altman
- 4090 PRAIRIE TRAIL, Valdosta: GAR395A68, issued 2018-08-01
- 4086 PRAIRIE TRAIL, Valdosta: GAR395A6C, issued 2018-08-01
- 4082 PRAIRIE TRAIL, Valdosta: GAR395A6F, issued 2018-08-01
- 4078 PRAIRIE TRAIL, Valdosta: GAR395A70, issued 2018-08-01
- 4019 MORNING DOVE DRIVE, Valdosta: GAR396C5C, issued 2023-08-01
- 4010 MORNING DOVE DRIVE, Valdosta: GAR396C61, issued 2023-08-01
- 4009 MORNING DOVE DRIVE, Valdosta: GAR396C64, issued 2023-08-01
- 4014 MORNING DOVE DRIVE, Valdosta: GAR396C66, issued 2023-08-01
- 4088 SETTERPOINTE DRIVE, Valdosta: GAR396E2E, issued 2023-08-01
- 4096 SETTERPOINTE DRIVE, Valdosta: GAR396E2F, issued 2023-08-01
Coverages issued nearest GAR395A3D
- 2018-08-01: HIDDEN HARBOR LOT 37, Greensboro: GAR395A30, held by Waterford Homes
- 2018-08-01: HARBOR CLUB - WATERFORD HOMES (LOT 1130) BAKER RESIDENCE, Greensboro: GAR395A31, held by Waterford Homes
- 2018-08-01: SHEFFIELD HIGHLANDS UNIT 1 PHASE 2, Dallas: GAR395A37, held by D.R. Horton
- 2018-08-01: LAKE ARROWHEAD PHASE 2 UNIT 12, Waleska: GAR395A39, held by Matthew Wilkes
- 2018-08-01: CURTIS PARKWAY TOWNHOMES, Calhoun: GAR395A3A, held by Brent Stepp
- 2018-08-01: 4090 PRAIRIE TRAIL, Valdosta: GAR395A68, held by Jennifer Altman
- 2018-08-01: 4086 PRAIRIE TRAIL, Valdosta: GAR395A6C, held by Jennifer Altman
- 2018-08-01: 4082 PRAIRIE TRAIL, Valdosta: GAR395A6F, held by Jennifer Altman
- 2018-08-01: 4078 PRAIRIE TRAIL, Valdosta: GAR395A70, held by Jennifer Altman
- 2018-08-01: DREAMBUILT / DREAMBUILT, LLC - CCC010, Greensboro: GAR395A81, held by DreamBuilt LLC / DreamBuilt
4085 PRAIRIE TRAIL among its neighbors
79 discharge permits are in the Tiger Creek-Withlacoochee River subwatershed (HUC 031102030802); GAR395A3D is one.
Other permits in the Tiger Creek-Withlacoochee River subwatershed (HUC 031102030802)
- 2101 LYNN HAVEN ROAD VALDOSTA, GA, 31601, Valdosta: GAR3963E3, minor, term to 2028-07-31
- 3575 BANKS WAY, Valdosta: GAR396DD3, minor, term to 2028-07-31
- 3584 BANKS WAY, Valdosta: GAR18B0BC, minor, term to 2028-07-31
- 3632 BEAR LAKE RD LOT 7, Hahira: GAR396D32, minor, term to 2028-07-31
- 3755 TIMBER RIDGE RD / LOT 59, Hahira: GAR3975E9, minor, term to 2028-07-31
- 3764 TIMBER RIDGE, Valdosta: GAR3970E6, minor, term to 2028-07-31
- 3773 KINDERLOU FOREST, Valdosta: GAR3969E4, minor, term to 2028-07-31
- 3785 ISLAND CREEK RD, Valdosta: GAR3975BF, minor, term to 2028-07-31
- 3790 BEAR LAKE RD, Valdosta: GAR39768E, minor, term to 2028-07-31
- 3897 BEAR HOLLOW, Valdosta: GAR39697C, minor, term to 2028-07-31
What stands out
- Its term runs 6 years and 183 days, August 1, 2018 to January 31, 2025; the term ended 592 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | 4085 PRAIRIE TRAIL |
|---|---|
| Permittee | Jennifer Altman |
| NPDES ID | GAR395A3D |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2018 |
| Expires | January 31, 2025 |
| Address | Valdosta, GA 31601 |
| Subwatershed | Tiger Creek-Withlacoochee River (HUC 031102030802) |
NPDES GAR395A3D: effluent limits and exceedances
4085 PRAIRIE TRAIL (NPDES GAR395A3D): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR395A3D: no pollutant row on file.
NPDES GAR395A3D: inspections, violations and enforcement
NPDES GAR395A3D (4085 PRAIRIE TRAIL): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR395A3D
NPDES GAR395A3D: one email when its EPA record changes — $99/month.
Permits near NPDES GAR395A3D
NPDES GAR395A3D: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.