NPDES GAR396C5C · Clean Water Act
4019 MORNING DOVE DRIVE, Valdosta, GA: NPDES GAR396C5C discharge permit, effluent exceedances, inspections, penalties
4019 MORNING DOVE DRIVE, Valdosta, Georgia: General permit coverage GAR396C5C, held by Jennifer Altman; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR396C5C. Jennifer Altman holds 24 permits in Georgia.
Other permits held by Jennifer Altman
- 4085 PRAIRIE TRAIL, Valdosta: GAR395A3D, issued 2018-08-01
- 4090 PRAIRIE TRAIL, Valdosta: GAR395A68, issued 2018-08-01
- 4086 PRAIRIE TRAIL, Valdosta: GAR395A6C, issued 2018-08-01
- 4082 PRAIRIE TRAIL, Valdosta: GAR395A6F, issued 2018-08-01
- 4078 PRAIRIE TRAIL, Valdosta: GAR395A70, issued 2018-08-01
- 4010 MORNING DOVE DRIVE, Valdosta: GAR396C61, issued 2023-08-01
- 4009 MORNING DOVE DRIVE, Valdosta: GAR396C64, issued 2023-08-01
- 4014 MORNING DOVE DRIVE, Valdosta: GAR396C66, issued 2023-08-01
- 4088 SETTERPOINTE DRIVE, Valdosta: GAR396E2E, issued 2023-08-01
- 4096 SETTERPOINTE DRIVE, Valdosta: GAR396E2F, issued 2023-08-01
Coverages issued nearest GAR396C5C
- 2023-08-01: NATUREWALK UNIT4 PH 1A & 1B, Dallas: GAR396C51, held by ARTISAN BUILT COMMUNITIES
- 2023-08-01: ARBOR SPRINGS 81, Newnan: GAR396C53, held by Parnell Hall Funding LLC
- 2023-08-01: EVERGREEN MEADOWS, Newnan: GAR396C59
- 2023-08-01: COLLEGE HEIGHTS, Franklin Springs: GAR396C5A, held by Butler Built Construction
- 2023-08-01: CANTON OVERLOOK, Canton: GAR396C5B, held by Eastwood Homes
- 2023-08-01: MASCARY ESTATES, Milton: GAR396C5D, held by Danie Mascary
- 2023-08-01: HERITAGE POINT PHASE 2 UNIT 3 LOTS: 73,74, Senoia: GAR396C5E, held by DR Horton Inc
- 2023-08-01: 308 PINEBROOK DRIVE, Waleska: GAR396C5F, held by Steven McKenzie
- 2023-08-01: CAMPBELL CROSSING LOT 30, Covington: GAR396C60, held by Buyside Capital Advisors
- 2023-08-01: 4010 MORNING DOVE DRIVE, Valdosta: GAR396C61, held by Jennifer Altman
4019 MORNING DOVE DRIVE among its neighbors
79 discharge permits are in the Tiger Creek-Withlacoochee River subwatershed (HUC 031102030802); GAR396C5C is one.
Other permits in the Tiger Creek-Withlacoochee River subwatershed (HUC 031102030802)
- 2101 LYNN HAVEN ROAD VALDOSTA, GA, 31601, Valdosta: GAR3963E3, minor, term to 2028-07-31
- 3575 BANKS WAY, Valdosta: GAR396DD3, minor, term to 2028-07-31
- 3584 BANKS WAY, Valdosta: GAR18B0BC, minor, term to 2028-07-31
- 3632 BEAR LAKE RD LOT 7, Hahira: GAR396D32, minor, term to 2028-07-31
- 3755 TIMBER RIDGE RD / LOT 59, Hahira: GAR3975E9, minor, term to 2028-07-31
- 3764 TIMBER RIDGE, Valdosta: GAR3970E6, minor, term to 2028-07-31
- 3773 KINDERLOU FOREST, Valdosta: GAR3969E4, minor, term to 2028-07-31
- 3785 ISLAND CREEK RD, Valdosta: GAR3975BF, minor, term to 2028-07-31
- 3790 BEAR LAKE RD, Valdosta: GAR39768E, minor, term to 2028-07-31
- 3897 BEAR HOLLOW, Valdosta: GAR39697C, minor, term to 2028-07-31
What stands out
- Its term runs 4 years and 365 days, August 1, 2023 to July 31, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | 4019 MORNING DOVE DRIVE |
|---|---|
| Permittee | Jennifer Altman |
| NPDES ID | GAR396C5C |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2023 |
| Expires | July 31, 2028 |
| Address | Valdosta, GA 31601 |
| Subwatershed | Tiger Creek-Withlacoochee River (HUC 031102030802) |
NPDES GAR396C5C: effluent limits and exceedances
4019 MORNING DOVE DRIVE (NPDES GAR396C5C): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR396C5C: no pollutant row on file.
NPDES GAR396C5C: inspections, violations and enforcement
NPDES GAR396C5C (4019 MORNING DOVE DRIVE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR396C5C
NPDES GAR396C5C: one email when its EPA record changes — $99/month.
Permits near NPDES GAR396C5C
NPDES GAR396C5C: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.