Clean Water Act discharge permit · NPDES IDR1001BD
BARBER VALLEY SEWER EXTENSION, Boise, ID: NPDES IDR1001BD discharge permit, effluent exceedances, inspections, penalties
- Not neededPermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
BARBER VALLEY SEWER EXTENSION, held by Brighton Development Inc., holds NPDES permit IDR1001BD. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for BARBER VALLEY SEWER EXTENSION: its NPDES ID, its permit type and status, its its address in Boise, Idaho. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES IDR1001BD.
What stands out
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.
Identity
| Facility as filed | BARBER VALLEY SEWER EXTENSION |
|---|---|
| Permittee as filed | Brighton Development Inc. |
| NPDES ID | IDR1001BD |
| Permit status | Not needed |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Address | Boise, ID 83716 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Crane Creek-Boise River (HUC 170501140403) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES IDR1001BD.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES IDR1001BD.
Inspections
EPA’s inspection file holds no inspection for NPDES IDR1001BD.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES IDR1001BD.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, IDR1001BD.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID IDR1001BD there.
BARBER VALLEY SEWER EXTENSION, Boise, Idaho: Coverage under a general permit IDR1001BD, held by Brighton Development Inc.; Construction stormwater; Not needed.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file. Brighton Development Inc. holds 10 permits in Idaho.
Other permits held by Brighton Development Inc.
- CENTURY FARM COMMERCIAL/OFFSITE, Meridian: IDR10007U, issued 2017-05-15
- BAINBRIDGE 11, Meridian: IDR1002BP, issued 2020-03-04
- NEVILLE RANCH SUBDIVISION PHASE 4, Boise: IDR1002I8, issued 2020-06-02
- PARAMOUNT URGENT CARE, Meridian: IDR1002ML
- HILL'S CENTURY FARM NORTH NO. 1, Meridian: IDR1002N9, issued 2020-08-21
- ARBOR SUBDIVISION NO. 2, Caldwell: IDR1002S7, issued 2020-11-04
- NEVILLE HIGHLANDS, Boise: IDR10033T, issued 2021-04-28
- TM CREEK 4 ADJUSTED, Meridian: IDR10C039, issued 2021-11-09
- NEVILLE RANCH EAST, Boise: IDR10C0AE, issued 2022-04-11
BARBER VALLEY SEWER EXTENSION among its neighbors
132 discharge permits are in the Crane Creek-Boise River subwatershed (HUC 170501140403); IDR1001BD is one.
Other permits in the Crane Creek-Boise River subwatershed (HUC 170501140403)
- 11TH ST MTCE & BIKEWAY PROJECT PHASE 2, Boise: IDR10L08C
- 11TH STREET MAINTENANCE & BIKEWAY - PHASE 2, Boise: IDR10L08B
- 1250 S. DIVISION AVE., Boise: IDR1002V8, minor, term to 2022-02-15
- 2018 DOWNTOWN BOISE IMPLEMENTATION, Boise: IDR10017Z
- 2018 DOWNTOWN BOISE IMPLEMENTATION, Boise: IDR10019G
- 2018 RESIDENTIAL CAPITAL MAINTENANCE, Boise: IDR100138
- 2020 DOWNTOWN BOISE IMPLEMENTATION PLAN: 9TH ST, UNIVERSITY DRIVE TO FRONT ST, Boise: IDR10034X
- 24TH & MAIN STREET DEMOLITION - BOISE MARINE, Boise: IDR1000NX
- 5 CR IMPROVEMENT, Nampa: IDR1001TB
- 5TH AND MYRTLE TEMP PARKING LOT, Boise: IDR1000ZX
Nearby on the register
- Discharge permits in Boise
- Every permit record in Boise, A to Z
- Discharge permits in Idaho
- Every permit record in Idaho, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
Of the 314 storm water construction permits in Boise, 0.0% carry a violation on file. BARBER VALLEY SEWER EXTENSION sits in the Crane Creek-Boise River subwatershed, which holds 132 NPDES permits including this permit. The Idaho permit reports 0 pollutants under a numeric limit and 0 pollutants with an effluent exceedance.