NPDES IDR1002J1 · Clean Water Act
PIERCE ST. — WASHINGTON ST. TO SHENANDOAH DR., Boise, ID: NPDES IDR1002J1 discharge permit, effluent exceedances, inspections, penalties
PIERCE ST. — WASHINGTON ST. TO SHENANDOAH DR., Boise, Idaho: General permit coverage IDR1002J1, held by Compliance Solutions & Contracting; Construction stormwater; Not needed.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file. Compliance Solutions & Contracting holds 13 permits in Idaho.
Other permits held by Compliance Solutions & Contracting
- TREATMENT PLANT SITE FLOOD MITIGATION, Eagle: IDR1002J2
- EAGLE SEWER DISTRICT TREATMENT PLANT FLOOD MITIGATION, Eagle: IDR1002JZ
- MIDWAY PARK - PHASE 2, Nampa: IDR10C0IS, issued 2022-08-30
- BRUNEAU WASTEWATER FACILITY UPGRADE 2022, Bruneau: IDR10C0P4, issued 2023-03-27
- WILD HORSE PARK, Mountain Home: IDR10C12P, issued 2022-01-10
- MIDWAY PARK PHASE 3, Nampa: IDR10C1AG, issued 2022-01-10
- BOISE PETERBILT, Boise: IDR10C1IE, issued 2022-01-10
- BOISE GATEWAY IP - BUILDING 4, Boise: IDR10C1LN, issued 2022-01-10
- ACHD CT226-07: LIBERTY ST: DOUGLAS ST. TO DENTON ST., Boise: IDR10C1VT, issued 2022-01-10
- BOI VEHICLE GATES REPLACEMENT, Boise: IDR10L0AE
PIERCE ST. — WASHINGTON ST. TO SHENANDOAH DR. among its neighbors
132 discharge permits are in the Crane Creek-Boise River subwatershed (HUC 170501140403); IDR1002J1 is one.
Other permits in the Crane Creek-Boise River subwatershed (HUC 170501140403)
- 11TH ST MTCE & BIKEWAY PROJECT PHASE 2, Boise: IDR10L08C
- 11TH STREET MAINTENANCE & BIKEWAY - PHASE 2, Boise: IDR10L08B
- 1250 S. DIVISION AVE., Boise: IDR1002V8, minor, term to 2022-02-15
- 2018 DOWNTOWN BOISE IMPLEMENTATION, Boise: IDR10017Z
- 2018 DOWNTOWN BOISE IMPLEMENTATION, Boise: IDR10019G
- 2018 RESIDENTIAL CAPITAL MAINTENANCE, Boise: IDR100138
- 2020 DOWNTOWN BOISE IMPLEMENTATION PLAN: 9TH ST, UNIVERSITY DRIVE TO FRONT ST, Boise: IDR10034X
- 24TH & MAIN STREET DEMOLITION - BOISE MARINE, Boise: IDR1000NX
- 5 CR IMPROVEMENT, Nampa: IDR1001TB
- 5TH AND MYRTLE TEMP PARKING LOT, Boise: IDR1000ZX
What stands out
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.
Identity
| Facility | PIERCE ST. — WASHINGTON ST. TO SHENANDOAH DR. |
|---|---|
| Permittee | Compliance Solutions & Contracting |
| NPDES ID | IDR1002J1 |
| Status | Not needed |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Address | Boise, ID 83712 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Crane Creek-Boise River (HUC 170501140403) |
NPDES IDR1002J1: effluent limits and exceedances
PIERCE ST. — WASHINGTON ST. TO SHENANDOAH DR. (NPDES IDR1002J1): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR1002J1: no pollutant row on file.
NPDES IDR1002J1: inspections, violations and enforcement
NPDES IDR1002J1 (PIERCE ST. — WASHINGTON ST. TO SHENANDOAH DR.): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR1002J1
NPDES IDR1002J1: one email when its EPA record changes — $99/month.
Permits near NPDES IDR1002J1
NPDES IDR1002J1: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.