CWI RIVER DISTRICT, Boise, ID: NPDES IDR10C1P1 discharge permit, effluent exceedances, inspections, penalties

CWI RIVER DISTRICT, Boise, Idaho: General permit coverage IDR10C1P1, held by Engineered Structures Inc; Construction stormwater; Effective; issued January 10, 2022, term to February 9, 2027; discharges to Boise River - Diversion Dam to River Mile 50.

  • September 10, 2026: Evaluation (S).
  • August 6, 2026: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).

Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 576 were issued before IDR10C1P1. Engineered Structures Inc holds 23 permits in Idaho.

Other permits held by Engineered Structures Inc

Coverages issued nearest IDR10C1P1

CWI RIVER DISTRICT among its neighbors

132 discharge permits are in the Crane Creek-Boise River subwatershed (HUC 170501140403); IDR10C1P1 is one.

Other permits in the Crane Creek-Boise River subwatershed (HUC 170501140403)

What stands out

  • Its term runs 5 years and 30 days, January 10, 2022 to February 9, 2027.
  • Its newest dated event on file is an inspection on September 10, 2026, 5 days before EPA's file was loaded.
  • In the 365 days to September 15, 2026, it was dated 1 single-event violation, 1 inspection.
  • EPA's file dates 2 events for it, all in 2026.
  • It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityCWI RIVER DISTRICT
PermitteeEngineered Structures Inc
NPDES IDIDR10C1P1
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedJanuary 10, 2022
ExpiresFebruary 9, 2027
AddressBoise, ID 83702
Receiving waterBoise River - Diversion Dam to River Mile 50
Receiving water impaired303(D) Listed
SubwatershedCrane Creek-Boise River (HUC 170501140403)

NPDES IDR10C1P1: effluent limits and exceedances

CWI RIVER DISTRICT (NPDES IDR10C1P1): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES IDR10C1P1: no pollutant row on file.

NPDES IDR10C1P1: inspections, violations and enforcement

NPDES IDR10C1P1: 1 single-event violation

DateWhat EPA recordedAgency
August 6, 2026WW Storm Water Construction - Failure to properly operate and maintain BMPsST6

NPDES IDR10C1P1: 1 inspection

DateWhat EPA recordedAgency
September 10, 2026EvaluationS

NPDES IDR10C1P1 (CWI RIVER DISTRICT): no formal enforcement action and informal enforcement action on file.

Watch NPDES IDR10C1P1

NPDES IDR10C1P1: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES IDR10C1P1

NPDES IDR10C1P1: 0 pollutant rows, 2 dated events; ICIS-NPDES download, loaded September 15, 2026.