NPDES IDR10C1R0 · Clean Water Act
WATERS EDGE SUBDIVISION, Fruitland, ID: NPDES IDR10C1R0 discharge permit, effluent exceedances, inspections, penalties
WATERS EDGE SUBDIVISION, Fruitland, Idaho: General permit coverage IDR10C1R0, held by Solid Frame; Construction stormwater; Effective; issued January 10, 2022, term to February 9, 2027; discharges to Snake River; New Single-Family Housing Construction [except For-Sale Builders].
- April 21, 2026: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
- April 21, 2026: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).
- February 19, 2026: Evaluation (S).
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 576 were issued before IDR10C1R0.
Coverages issued nearest IDR10C1R0
- 2022-01-10: HOWE LANDFILL, Howe: IDR10C1QS, held by Bud Johnson
- 2022-01-10: DAWSON TRAILS (OPERATOR), Mccall: IDR10C1QT, held by Nick Louie
- 2022-01-10: BADGER RESIDENCE, Ketchum: IDR10C1QX, held by Conrad Brothers Construction
- 2022-01-10: 8603 N PARKS RD HOUSE, Pocatello: IDR10C1QY, held by Bob Elzner
- 2022-01-10: DAWSON TRAILS (OWNER), Mccall: IDR10C1QZ, held by Shane Mace
- 2022-01-10: DORADO STATION, Boise: IDR10C1R2, held by J Fisher Construction
- 2022-01-10: 35TH STREET WATER MAIN REPLACEMENT, Garden City: IDR10C1R3, held by Western Refinery Services
- 2022-01-10: MEMORY RANCH SUBDIVISION NO. 8, Meridian: IDR10C1R4, held by Trilogy Development, Inc.
- 2022-01-10: FREEZE EXPLORATION, Council: IDR10C1R5, held by Silver Rock Resources
- 2022-01-10: CONSTRUCT AIRPORT DRAINAGE EROSION CONTROL, Nampa: IDR10C1R6, held by LaRiviere Inc
WATERS EDGE SUBDIVISION among its neighbors
19 discharge permits are in the Plummer Slough-Snake River subwatershed (HUC 170501150104); IDR10C1R0 is one. Its county: 26, 1 major; IDR10C1R0 is minor permit.
Other permits in the Plummer Slough-Snake River subwatershed (HUC 170501150104)
- ALAMEDA ELEMENTARY SCHOOL (ONTARIO SCHOOLYARD PROJECT), Ontario: ORR10J875, minor, term to 2030-12-14
- CITY OF FRUITLAND WATER TREATMENT PLANT, Fruitland: IDG380017, minor, term to 2027-04-30
- CKL CORPORATION / DBA C4 METAL RECYCLING, Payette: IDR05CW77
- CORPUS CHRISTI CATHOLIC CHURCH PARISH HALL EXPANSION, Fruitland: IDR100232
- FRUILTLAND CRS, Fruitland: IDR1002UO
- FRUITLAND FACILITY, Fruitland: IDR053093, minor, term to 2020-06-03
- FRUITLAND ONION STORAGE, Fruitland: IDR1000JT
- FRUITLAND, CITY OF - PAYETTE RIVER WWTP, Fruitland: ID0021199, minor, term to 2007-01-02
- IDAHO CENTRAL CREDIT UNION-FRUITLAND, Fruitland: IDR10C0EI, minor, term to 2027-02-09
- IDAHO CONCRETE, Ontario: ORR321795, minor, term to 2017-12-03
What stands out
- Its term runs 5 years and 30 days, January 10, 2022 to February 9, 2027.
- Its newest dated event on file is a single-event violation on April 21, 2026, 176 days before EPA's file was loaded.
- In the 365 days to October 14, 2026, it was dated 2 single-event violations, 1 inspection.
- EPA's file dates 3 events for it, all in 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | WATERS EDGE SUBDIVISION |
|---|---|
| Permittee | Solid Frame |
| NPDES ID | IDR10C1R0 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 10, 2022 |
| Expires | February 9, 2027 |
| Address | Fruitland, ID 83619 |
| Receiving water | Snake River |
| Subwatershed | Plummer Slough-Snake River (HUC 170501150104) |
| NAICS | 236115 – New Single-Family Housing Construction [except For-Sale Builders] |
| SIC | 1521 – Single-Family Housing Construction |
NPDES IDR10C1R0: effluent limits and exceedances
WATERS EDGE SUBDIVISION (NPDES IDR10C1R0): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10C1R0: no pollutant row on file.
NPDES IDR10C1R0: inspections, violations and enforcement
NPDES IDR10C1R0: 2 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| April 21, 2026 | WW Storm Water Construction - Failure to properly install/implement BMPs | ST6 |
| April 21, 2026 | WW Storm Water Construction - Failure to properly operate and maintain BMPs | ST6 |
NPDES IDR10C1R0: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| February 19, 2026 | Evaluation | S |
NPDES IDR10C1R0 (WATERS EDGE SUBDIVISION): no formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10C1R0
NPDES IDR10C1R0: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10C1R0
NPDES IDR10C1R0: 0 pollutant rows, 3 dated events; ICIS-NPDES download, loaded October 14, 2026.