NPDES IDR10C1R2 · Clean Water Act
DORADO STATION, Boise, ID: NPDES IDR10C1R2 discharge permit, effluent exceedances, inspections, penalties
DORADO STATION, Boise, Idaho: General permit coverage IDR10C1R2, held by J Fisher Construction; Construction stormwater; Effective; issued January 10, 2022, term to February 9, 2027; discharges to Storm drain connected to North Slough located 1/2.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 576 were issued before IDR10C1R2.
Coverages issued nearest IDR10C1R2
- 2022-01-10: DAWSON TRAILS (OPERATOR), Mccall: IDR10C1QT, held by Nick Louie
- 2022-01-10: BADGER RESIDENCE, Ketchum: IDR10C1QX, held by Conrad Brothers Construction
- 2022-01-10: 8603 N PARKS RD HOUSE, Pocatello: IDR10C1QY, held by Bob Elzner
- 2022-01-10: DAWSON TRAILS (OWNER), Mccall: IDR10C1QZ, held by Shane Mace
- 2022-01-10: WATERS EDGE SUBDIVISION, Fruitland: IDR10C1R0, held by Solid Frame
- 2022-01-10: 35TH STREET WATER MAIN REPLACEMENT, Garden City: IDR10C1R3, held by Western Refinery Services
- 2022-01-10: MEMORY RANCH SUBDIVISION NO. 8, Meridian: IDR10C1R4, held by Trilogy Development, Inc.
- 2022-01-10: FREEZE EXPLORATION, Council: IDR10C1R5, held by Silver Rock Resources
- 2022-01-10: CONSTRUCT AIRPORT DRAINAGE EROSION CONTROL, Nampa: IDR10C1R6, held by LaRiviere Inc
- 2022-01-10: BRUNDAGE FLATS, Mccall: IDR10C1R7, held by CM Company
DORADO STATION among its neighbors
141 discharge permits are in the South Slough-Boise River subwatershed (HUC 170501140405); IDR10C1R2 is one. Its county: 668, 5 major; IDR10C1R2 is minor permit.
Other permits in the South Slough-Boise River subwatershed (HUC 170501140405)
- 2ND SPACE STORAGE, Meridian: IDR10C1G9, minor, term to 2027-02-09
- 4120 N. LINDER RD. COMMERCIAL, Meridian: IDR10035O, minor, term to 2022-02-15
- 55 RESORT AT VERANO PLACE, Meridian: IDR10C06V, minor, term to 2022-02-16
- ACHD CT226-07: LIBERTY ST: DOUGLAS ST. TO DENTON ST., Boise: IDR10C1VT, minor, term to 2027-02-09
- ADDISON CIRCLE SUBDIVSION, Meridian: IDR10C1R9, minor, term to 2027-02-09
- ADERO PARK SUBDIVISION NO 2, Meridian: IDR10C1UM, minor, term to 2027-02-09
- ADERO PARK SUBDIVISION NO 2, Meridian: IDR10C1UN, minor, term to 2027-02-09
- ALICIA COURT SUBDIVISION, Meridian: IDR10024C
- ALPINE ST, ORCHARD ST TO RANDALL ST, Boise: IDR100071
- AMBLESIDE SUBDIVISION NO 1, Boise: IDR100376
What stands out
- Its term runs 5 years and 30 days, January 10, 2022 to February 9, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | DORADO STATION |
|---|---|
| Permittee | J Fisher Construction |
| NPDES ID | IDR10C1R2 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 10, 2022 |
| Expires | February 9, 2027 |
| Address | Boise, ID 83704 |
| Receiving water | Storm drain connected to North Slough located 1/2 |
| Subwatershed | South Slough-Boise River (HUC 170501140405) |
NPDES IDR10C1R2: effluent limits and exceedances
DORADO STATION (NPDES IDR10C1R2): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10C1R2: no pollutant row on file.
NPDES IDR10C1R2: inspections, violations and enforcement
NPDES IDR10C1R2 (DORADO STATION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10C1R2
NPDES IDR10C1R2: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10C1R2
NPDES IDR10C1R2: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.