NPDES IDR10C1RS · Clean Water Act

IDAHO BOTANICAL GARDEN PHASE 1, Boise, ID: NPDES IDR10C1RS discharge permit, effluent exceedances, inspections, penalties

IDAHO BOTANICAL GARDEN PHASE 1, Boise, Idaho: General permit coverage IDR10C1RS, held by Jordan-Wilcomb Construction, Inc.; Construction stormwater; Effective; issued January 10, 2022, term to February 9, 2027; discharges to Boise River; Commercial and Institutional Building Construction.

  • February 9, 2026: Management Practice Violations - Improper Chemical Handling (ST6).
  • February 9, 2026: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).
  • February 9, 2026: WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
  • February 9, 2026: Evaluation (S).

Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 576 were issued before IDR10C1RS. Jordan-Wilcomb Construction, Inc. holds 12 permits in Idaho.

Other permits held by Jordan-Wilcomb Construction, Inc.

Coverages issued nearest IDR10C1RS

IDAHO BOTANICAL GARDEN PHASE 1 among its neighbors

132 discharge permits are in the Crane Creek-Boise River subwatershed (HUC 170501140403); IDR10C1RS is one. Its county: 668, 5 major; IDR10C1RS is minor permit.

Other permits in the Crane Creek-Boise River subwatershed (HUC 170501140403)

What stands out

  • Its term runs 5 years and 30 days, January 10, 2022 to February 9, 2027.
  • Its newest dated event on file is single-event violation and inspection on February 9, 2026, 247 days before EPA's file was loaded.
  • In the 365 days to October 14, 2026, it was dated 3 single-event violations, 1 inspection.
  • EPA's file dates 4 events for it, all in 2026.
  • It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityIDAHO BOTANICAL GARDEN PHASE 1
PermitteeJordan-Wilcomb Construction, Inc.
NPDES IDIDR10C1RS
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedJanuary 10, 2022
ExpiresFebruary 9, 2027
AddressBoise, ID 83712
Receiving waterBoise River
Receiving water impaired303(D) Listed
SubwatershedCrane Creek-Boise River (HUC 170501140403)
NAICS236220 – Commercial and Institutional Building Construction
SIC1542 – Nonresidential Construction

NPDES IDR10C1RS: effluent limits and exceedances

IDAHO BOTANICAL GARDEN PHASE 1 (NPDES IDR10C1RS): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES IDR10C1RS: no pollutant row on file.

NPDES IDR10C1RS: inspections, violations and enforcement

NPDES IDR10C1RS: 3 single-event violations

DateWhat EPA recordedAgency
February 9, 2026Management Practice Violations - Improper Chemical HandlingST6
February 9, 2026WW Storm Water Construction - Failure to properly operate and maintain BMPsST6
February 9, 2026WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMPST6

NPDES IDR10C1RS: 1 inspection

DateWhat EPA recordedAgency
February 9, 2026EvaluationS

NPDES IDR10C1RS (IDAHO BOTANICAL GARDEN PHASE 1): no formal enforcement action and informal enforcement action on file.

Watch NPDES IDR10C1RS

NPDES IDR10C1RS: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES IDR10C1RS

NPDES IDR10C1RS: 0 pollutant rows, 4 dated events; ICIS-NPDES download, loaded October 14, 2026.