NPDES AZR10I0QE · Clean Water Act
NA-20-LB4 SHIPROCK SU FAILED DRAINFIELD SYSTEMS, Shiprock, NM: NPDES AZR10I0QE discharge permit, effluent exceedances, inspections, penalties
NA-20-LB4 SHIPROCK SU FAILED DRAINFIELD SYSTEMS, Shiprock, New Mexico: General permit coverage AZR10I0QE, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY; Construction stormwater; Administratively continued; issued September 27, 2021, term to February 15, 2022, by U.S. EPA.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 406 were issued before AZR10I0QE. NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY holds 131 permits in New Mexico.
Other permits held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- NA-13-Z89/Z90 NAVAJO GALLUP WATER SUPPLY PROJECT REACH 14.1 AND 14.2, Churchrock: AZR10I01Y, issued 2017-05-17
- NA-17-F58 FFO HOUSING SCATTERED XI, Nageezi: AZR10I0A3, issued 2018-07-02
- NA-17-W20 SHIPROCK NORTH LIFT STATION REPLACEMENT, Shiprock: AZR10I0KC, issued 2020-04-08
- NA-18-U67 RAMAH WHITEROCK UNIT ONE CISTERNS, Mountain View: AZR10I0LE, issued 2020-08-25
- NA-18-W59 WHITEROCK SOUTH WATERLINE EXTENSION, Whiterock: AZR10I0LF, issued 2020-08-25
- NA-17-U21/X09: BURNHAM HUNTER WASH WATERLINE EXTENSION, Burnham: AZR10I0M5, issued 2020-10-29
- NA-19-F96 FFO HOUSING SCATTERED XIII, Nageezi: AZR10I0O9, issued 2021-04-28
- C014524 PROJECT # N11 (1A) 1,2&4 MARIANO LAKE, NEW MEXICO: NECA 1416, Mariano Lake: AZR10I0OA, issued 2021-04-28
- THOREAU WELL CONNECTION PROJECT: NECA 1413, Thoreau: AZR10I0OM, issued 2021-05-26
- NA-19-F94 SHIPROCK EAST SCATTERED XVII, Shiprock: AZR10I0OR, issued 2021-06-01
Coverages issued nearest AZR10I0QE
- 2021-09-17: CAVEMAN SUB, Carlsbad: NMR10046S, held by Xcel Energy (SPS)
- 2021-09-17: VALLECITO AT FIESTA, Los Lunas: NMR10046Z, held by PULTE HOMES OF NEW MEXICO, INC.
- 2021-09-21: UNIVERSITY MEADOWS SUBDIVISION PHASE 3-5, CALIPER, Las Cruces: NMR100475, held by Caliper Construction
- 2021-09-22: ROADRUNNER REDI-MIX, INC., Rio Rancho: NMR100476, held by Roadrunner Redi-Mix, Inc.
- 2021-09-23: MISSION ACHIEVEMENTS & SUCCESS CHARTER SCHOOL, Albuquerque: NMR100478, held by CSP SAGE ROAD, LLC
- 2021-09-27: WESTPARK 2 - BUILDING 5, 550 INDUSTRIAL AVENUE, Santa Teresa: NMR10047C, held by Santa Teresa Land LLC
- 2021-09-28: DTRA ADMINISTRATIVE BUILDING, Kirtland Afb: NMR1003Z0, held by Hensel Phelps Construction Company
- 2021-09-29: 897 PARKING LOT ADDITION, Albuquerque: NMR10047G, held by National Technology & Engineering Solutions of Sandia, LLC
- 2021-09-29: DTRA ADMINISTRATIVE BUILDING, Kirtland Afb: NMR10047J, held by Kirtland Air Force Base
- 2021-09-30: WESTPARK 2 - BUILDING 5, 550 INDUSTRIAL AVE. MW BUILDERS, Santa Teresa: NMR10047K, held by MW Builders
NA-20-LB4 SHIPROCK SU FAILED DRAINFIELD SYSTEMS among its neighbors
87 discharge permits are in the Rattlesnake Wash-San Juan River subwatershed (HUC 140801050704); AZR10I0QE is one.
Other permits in the Rattlesnake Wash-San Juan River subwatershed (HUC 140801050704)
- (F79) SHIPROCK MEDICAL REFERRAL XVI, Shiprock: AZR10I0PK, minor, term to 2022-02-15
- (F94) SHIPROCK EAST SCATTERED XVII, Shiprock: AZR10I0OH, minor, term to 2022-02-15
- (G23) SHIPROCK EAST SCATTERED XVIII, Shiprock: AZR10I0VI, minor, term to 2027-02-16
- (G38) SHIPROCK MEDICAL REFERRALS, Shiprock: AZR10I160, minor, term to 2027-02-16
- (G40) SHIPROCK EAST SCATTERED XIX, Shiprock: AZR10I12H, minor, term to 2027-02-16
- (G52) SHIPROCK EAST SCATTERED HOUSING 2023, Shiprock: AZR10I17P, minor, term to 2027-02-16
- (LI7) SHIPROCK SU FAILED DRAINFIELDS, Shiprock: AZR10I0VH, minor, term to 2027-02-16
- (LJ6) SHIPROCK FARM AREA CISTERN, Shiprock: AZR10I0ZH
- (LM6) SHIPROCK FAILED DRAINFIELD SYSTEMS, Shiprock: AZR10I10G, minor, term to 2027-02-16
- (LM9) SHIPROCK SU FAILED SEPTIC SYSTEM DL2 DL3, Shiprock: AZR10I12I, minor, term to 2027-02-16
What stands out
- Its term runs 141 days, September 27, 2021 to February 15, 2022; the term ended 1,702 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NA-20-LB4 SHIPROCK SU FAILED DRAINFIELD SYSTEMS |
|---|---|
| Permittee | NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY |
| NPDES ID | AZR10I0QE |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 27, 2021 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Shiprock, NM 87420 |
| Subwatershed | Rattlesnake Wash-San Juan River (HUC 140801050704) |
NPDES AZR10I0QE: effluent limits and exceedances
NA-20-LB4 SHIPROCK SU FAILED DRAINFIELD SYSTEMS (NPDES AZR10I0QE): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZR10I0QE: no pollutant row on file.
NPDES AZR10I0QE: inspections, violations and enforcement
NPDES AZR10I0QE (NA-20-LB4 SHIPROCK SU FAILED DRAINFIELD SYSTEMS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZR10I0QE
NPDES AZR10I0QE: one email when its EPA record changes — $99/month.
Permits near NPDES AZR10I0QE
NPDES AZR10I0QE: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.