NPDES AZR10I0TG · Clean Water Act
NA-17-W23 SIHASIN 2017 HAYSTACK CISTERNS, Baca, NM: NPDES AZR10I0TG discharge permit, effluent exceedances, inspections, penalties
NA-17-W23 SIHASIN 2017 HAYSTACK CISTERNS, Baca, New Mexico: General permit coverage AZR10I0TG, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY; Construction stormwater; Effective; issued April 12, 2022, term to February 16, 2027, by U.S. EPA.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 670 were issued before AZR10I0TG. NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY holds 131 permits in New Mexico.
Other permits held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- NA-13-Z89/Z90 NAVAJO GALLUP WATER SUPPLY PROJECT REACH 14.1 AND 14.2, Churchrock: AZR10I01Y, issued 2017-05-17
- NA-17-F58 FFO HOUSING SCATTERED XI, Nageezi: AZR10I0A3, issued 2018-07-02
- NA-17-W20 SHIPROCK NORTH LIFT STATION REPLACEMENT, Shiprock: AZR10I0KC, issued 2020-04-08
- NA-18-U67 RAMAH WHITEROCK UNIT ONE CISTERNS, Mountain View: AZR10I0LE, issued 2020-08-25
- NA-18-W59 WHITEROCK SOUTH WATERLINE EXTENSION, Whiterock: AZR10I0LF, issued 2020-08-25
- NA-17-U21/X09: BURNHAM HUNTER WASH WATERLINE EXTENSION, Burnham: AZR10I0M5, issued 2020-10-29
- NA-19-F96 FFO HOUSING SCATTERED XIII, Nageezi: AZR10I0O9, issued 2021-04-28
- C014524 PROJECT # N11 (1A) 1,2&4 MARIANO LAKE, NEW MEXICO: NECA 1416, Mariano Lake: AZR10I0OA, issued 2021-04-28
- THOREAU WELL CONNECTION PROJECT: NECA 1413, Thoreau: AZR10I0OM, issued 2021-05-26
- NA-19-F94 SHIPROCK EAST SCATTERED XVII, Shiprock: AZR10I0OR, issued 2021-06-01
Coverages issued nearest AZR10I0TG
- 2022-04-11: HOT SPRINGS BLVD WATER AND SEWER IMPROVEMENTS, Las Vegas: NMR1004ML, held by Hays Plumbing and Heating, Inc
- 2022-04-11: GCS FINISHED PRODUCT STORAGE YARD, Albuquerque: NMR1004MM, held by MDS Investments, LLC
- 2022-04-11: PARKHILL ESTATES SUBDIVISION PHASES 8C AND 8D OWNER, Las Cruces: NMR1004MN, held by BPS, LLC
- 2022-04-11: CHAMPION XPRESS CAR WASH - SANTA FE, Santa Fe: NMR1004MP, held by 7B Building and Development
- 2022-04-11: SARANAM 4701 MONTANO, Albuquerque: NMR1004MQ, held by Saranam LLC
- 2022-04-12: YUCCA SUBDIVISION PH 3 AND 4, Chaparral: NMR1004MT, held by Morrow Enterprises, Inc
- 2022-04-12: 6084-508 LOS LUNAS, NM WALMART DISTRIBUTION CENTER, Los Lunas: NMR1004MU, held by Rabine Paving America
- 2022-04-12: CABQ BIO PARK AUSTRALIA EXHIBIT, Albuquerque: NMR1004MY, held by CITY OF ALBUQUERQUE BIO PARK ZOO
- 2022-04-13: ENMU NEXUS PHASE 3, Ruidoso: NMR1004N1, held by EASTERN NEW MEXICO UNIVERSITY - RUIDOSO
- 2022-04-13: LIFT STATION 16 WASTEWATER SYSTEM IMPROVEMENTS - ALONG EAST ORGAN RD, Mesilla Park: NMR1004N2, held by Lower Rio Grande Public Water Works Authority
NA-17-W23 SIHASIN 2017 HAYSTACK CISTERNS among its neighbors
6 discharge permits are in the Middle Mitchell Draw subwatershed (HUC 130202070107); AZR10I0TG is one.
Other permits in the Middle Mitchell Draw subwatershed (HUC 130202070107)
- CN 6100950, Prewitt: NMR1003QZ, minor, term to 2022-02-15
- GALLUP FAILED SEPTIC SYSTEMS DL2 - EASTWARD (XW3), Prewitt: AZR10I1IL, minor, term to 2027-02-16
- GALLUP FAILED SEPTIC SYSTEMS DL3 - EASTWARD (XW2), Prewitt: AZR10I1D7, minor, term to 2027-02-16
- NA-22-XW2: GALLUP FAILED SEPTIC SYSTEMS DL3 EASTWARD PH 1, Prewitt: AZR10I1F4, minor, term to 2027-02-16
- SOCCER FIELDS DEVELOPMENT BACA / DLO’AY AZHI COMMUNITY SCHOOL, Prewitt: AZR10I0XR
What stands out
- Its term runs 4 years and 310 days, April 12, 2022 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NA-17-W23 SIHASIN 2017 HAYSTACK CISTERNS |
|---|---|
| Permittee | NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY |
| NPDES ID | AZR10I0TG |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 12, 2022 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Baca, NM 87045 |
| Subwatershed | Middle Mitchell Draw (HUC 130202070107) |
NPDES AZR10I0TG: effluent limits and exceedances
NA-17-W23 SIHASIN 2017 HAYSTACK CISTERNS (NPDES AZR10I0TG): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZR10I0TG: no pollutant row on file.
NPDES AZR10I0TG: inspections, violations and enforcement
NPDES AZR10I0TG (NA-17-W23 SIHASIN 2017 HAYSTACK CISTERNS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZR10I0TG
NPDES AZR10I0TG: one email when its EPA record changes — $99/month.
Permits near NPDES AZR10I0TG
NPDES AZR10I0TG: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.