NPDES AZR10I127 · Clean Water Act
CHURCHROCK GLOVE FACTORY PHASE II: PROJECT 3019, Churchrock, NM: NPDES AZR10I127 discharge permit, effluent exceedances, inspections, penalties
CHURCHROCK GLOVE FACTORY PHASE II: PROJECT 3019, Churchrock, New Mexico: General permit coverage AZR10I127, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY; Construction stormwater; Effective; issued October 17, 2023, term to February 16, 2027, by U.S. EPA.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 1,487 were issued before AZR10I127. NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY holds 131 permits in New Mexico.
Other permits held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- NA-13-Z89/Z90 NAVAJO GALLUP WATER SUPPLY PROJECT REACH 14.1 AND 14.2, Churchrock: AZR10I01Y, issued 2017-05-17
- NA-17-F58 FFO HOUSING SCATTERED XI, Nageezi: AZR10I0A3, issued 2018-07-02
- NA-17-W20 SHIPROCK NORTH LIFT STATION REPLACEMENT, Shiprock: AZR10I0KC, issued 2020-04-08
- NA-18-U67 RAMAH WHITEROCK UNIT ONE CISTERNS, Mountain View: AZR10I0LE, issued 2020-08-25
- NA-18-W59 WHITEROCK SOUTH WATERLINE EXTENSION, Whiterock: AZR10I0LF, issued 2020-08-25
- NA-17-U21/X09: BURNHAM HUNTER WASH WATERLINE EXTENSION, Burnham: AZR10I0M5, issued 2020-10-29
- NA-19-F96 FFO HOUSING SCATTERED XIII, Nageezi: AZR10I0O9, issued 2021-04-28
- C014524 PROJECT # N11 (1A) 1,2&4 MARIANO LAKE, NEW MEXICO: NECA 1416, Mariano Lake: AZR10I0OA, issued 2021-04-28
- THOREAU WELL CONNECTION PROJECT: NECA 1413, Thoreau: AZR10I0OM, issued 2021-05-26
- NA-19-F94 SHIPROCK EAST SCATTERED XVII, Shiprock: AZR10I0OR, issued 2021-06-01
Coverages issued nearest AZR10I127
- 2023-10-16: SONOMA RANCH EAST 2 PHASE 11, Las Cruces: NMR1005XD, held by Inspiration Homes, LLC.
- 2023-10-16: SW WASTEWATER COLLECTION PH IV, Las Cruces: NMR1005XG, held by DAMDWCA
- 2023-10-17: NA-20-LB5 GALLUP FAILED SEPTICS, Churchrock: AZR10I11Y, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2023-10-17: NA-19-F97 CHICHILTAH-HOUCK SCATTERED HOUSING 2019, Chichiltah: AZR10I123, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2023-10-17: NA-15-T57/XH3 COALMINE/TSE BONITO W/L EXTENSION, Coal Mine: AZR10I124, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2023-10-18: ZINKHAM GUEST HOUSE, Santa Fe: NMR1005XN, held by Key Construction Services, LLC
- 2023-10-18: WAGNER RESIDENCE, Santa Fe: NMR1005XP, held by GREEN DESERT BUILDERS, LLC
- 2023-10-18: WB ALAMEDA & SAN PEDRO, Albuquerque: NMR1005XQ, held by CKP Construction
- 2023-10-18: WAGNER RESIDENCE, Santa Fe: NMR1005XR, held by RICHARD WAGNER
- 2023-10-19: 15 FLOWER GARLAND ROAD, Santa Fe: NMR1005XT, held by Rodriguez & Sons Construction, LLC
CHURCHROCK GLOVE FACTORY PHASE II: PROJECT 3019 among its neighbors
23 discharge permits are in the Church Rock-South Fork Puerco River subwatershed (HUC 150200060105); AZR10I127 is one.
Other permits in the Church Rock-South Fork Puerco River subwatershed (HUC 150200060105)
- CHURCH ROCK COAL MINE SCATTERED (U48/XS2), Church Rock: AZR10I0QZ, minor, term to 2022-02-15
- CHURCH ROCK SCATTERED HOUSING 2019, Church Rock: AZR10I0QY, minor, term to 2022-02-15
- CN 6101151, Rehoboth: NMR1007NT, minor, term to 2027-02-16
- CN6101151 MCKINLEY COUNTY, Rehoboth: NMR1007NM, minor, term to 2027-02-16
- CN6101291 MCKINLEY CTY NM118, Rehoboth: AZR10I1AG, minor, term to 2027-02-16
- CN6101291 NM 118 MP 25.811 TO 29.827, Rehoboth: AZR10I1AX, minor, term to 2027-02-16
- FIRE ROCK NAVAJO CASINO, Church Rock: NNF001002
- GALLUP EAST SCATTERED HOUSING 2022, Church Rock: AZR10I1GH, minor, term to 2027-02-16
- GALLUP FAILED SEPTICS-CENTRAL (XM3), Church Rock: NMR10I00S, minor, term to 2022-02-15
- JOSEPH ARMIJO WATERLINE EXTENSION, Sundance: AZR10I0U1
Identity
| Facility | CHURCHROCK GLOVE FACTORY PHASE II: PROJECT 3019 |
|---|---|
| Permittee | NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY |
| NPDES ID | AZR10I127 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 17, 2023 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Churchrock, NM 87311 |
| Subwatershed | Church Rock-South Fork Puerco River (HUC 150200060105) |
NPDES AZR10I127: effluent limits and exceedances
CHURCHROCK GLOVE FACTORY PHASE II: PROJECT 3019 (NPDES AZR10I127): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZR10I127: no pollutant row on file.
NPDES AZR10I127: inspections, violations and enforcement
NPDES AZR10I127 (CHURCHROCK GLOVE FACTORY PHASE II: PROJECT 3019): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZR10I127
NPDES AZR10I127: one email when its EPA record changes — $99/month.
Permits near NPDES AZR10I127
NPDES AZR10I127: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.