NPDES AZR10I12M · Clean Water Act
NA-22-G40 SHIPROCK EAST SCATTERED XIX, Shiprock, NM: NPDES AZR10I12M discharge permit, effluent exceedances, inspections, penalties
NA-22-G40 SHIPROCK EAST SCATTERED XIX, Shiprock, New Mexico: General permit coverage AZR10I12M, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY; Construction stormwater; Effective; issued November 14, 2023, term to February 16, 2027, by U.S. EPA.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 1,535 were issued before AZR10I12M. NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY holds 131 permits in New Mexico.
Other permits held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- NA-13-Z89/Z90 NAVAJO GALLUP WATER SUPPLY PROJECT REACH 14.1 AND 14.2, Churchrock: AZR10I01Y, issued 2017-05-17
- NA-17-F58 FFO HOUSING SCATTERED XI, Nageezi: AZR10I0A3, issued 2018-07-02
- NA-17-W20 SHIPROCK NORTH LIFT STATION REPLACEMENT, Shiprock: AZR10I0KC, issued 2020-04-08
- NA-18-U67 RAMAH WHITEROCK UNIT ONE CISTERNS, Mountain View: AZR10I0LE, issued 2020-08-25
- NA-18-W59 WHITEROCK SOUTH WATERLINE EXTENSION, Whiterock: AZR10I0LF, issued 2020-08-25
- NA-17-U21/X09: BURNHAM HUNTER WASH WATERLINE EXTENSION, Burnham: AZR10I0M5, issued 2020-10-29
- NA-19-F96 FFO HOUSING SCATTERED XIII, Nageezi: AZR10I0O9, issued 2021-04-28
- C014524 PROJECT # N11 (1A) 1,2&4 MARIANO LAKE, NEW MEXICO: NECA 1416, Mariano Lake: AZR10I0OA, issued 2021-04-28
- THOREAU WELL CONNECTION PROJECT: NECA 1413, Thoreau: AZR10I0OM, issued 2021-05-26
- NA-19-F94 SHIPROCK EAST SCATTERED XVII, Shiprock: AZR10I0OR, issued 2021-06-01
Coverages issued nearest AZR10I12M
- 2023-11-10: 543 0LD COORS DRIVE SW, Albuquerque: NMR1005ZN, held by Jose Morales Jaramillo
- 2023-11-13: NA-21-G26 -- GALLUP SOUTH SCATTERED 2021, Gallup: AZR10I12K, held by Navajo Area Indian Health Service
- 2023-11-13: PAUL D. HENRY ELEMENTARY SCHOOL DEMOLITION S22-011, Las Vegas: NMR1005ZP, held by NorthEastern Construction Co.
- 2023-11-13: TA55 NON SEISIMIC WATER LINE, Los Alamos: NMR1005ZR, held by Eagle Eye, LLC
- 2023-11-13: LAS FLORES SUBDIVISION PHASE 2, Berino: NMR1005ZS, held by Renegade Construction LLC
- 2023-11-14: NA-22-LM9 SHIPROCK SU FAILED SEPTIC SYSTEMS DL2-DL3, Shiprock: AZR10I12N, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2023-11-14: NA-19-F98 BACA-BREADSPRINGS-IYANBITO-THOREAU SCATTERED HOUSING 2019, Churchrock: AZR10I12Q, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2023-11-14: NA-18-F83 HAYSTACK-IYANBITO-THOREAU-BACA SCATTERED HOUSING 2018, Thoreau: AZR10I12R, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2023-11-14: NA-20-LC1 BACA SOUTH CISTERNS, Prewitt: AZR10I12T, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2023-11-15: ALLSUP'S #102471 (LOS LUNAS, NM), Los Lunas: NMR1005ZU, held by BW Gas & Convenience Retail, LLC
NA-22-G40 SHIPROCK EAST SCATTERED XIX among its neighbors
87 discharge permits are in the Rattlesnake Wash-San Juan River subwatershed (HUC 140801050704); AZR10I12M is one.
Other permits in the Rattlesnake Wash-San Juan River subwatershed (HUC 140801050704)
- (F79) SHIPROCK MEDICAL REFERRAL XVI, Shiprock: AZR10I0PK, minor, term to 2022-02-15
- (F94) SHIPROCK EAST SCATTERED XVII, Shiprock: AZR10I0OH, minor, term to 2022-02-15
- (G23) SHIPROCK EAST SCATTERED XVIII, Shiprock: AZR10I0VI, minor, term to 2027-02-16
- (G38) SHIPROCK MEDICAL REFERRALS, Shiprock: AZR10I160, minor, term to 2027-02-16
- (G40) SHIPROCK EAST SCATTERED XIX, Shiprock: AZR10I12H, minor, term to 2027-02-16
- (G52) SHIPROCK EAST SCATTERED HOUSING 2023, Shiprock: AZR10I17P, minor, term to 2027-02-16
- (LI7) SHIPROCK SU FAILED DRAINFIELDS, Shiprock: AZR10I0VH, minor, term to 2027-02-16
- (LJ6) SHIPROCK FARM AREA CISTERN, Shiprock: AZR10I0ZH
- (LM6) SHIPROCK FAILED DRAINFIELD SYSTEMS, Shiprock: AZR10I10G, minor, term to 2027-02-16
- (LM9) SHIPROCK SU FAILED SEPTIC SYSTEM DL2 DL3, Shiprock: AZR10I12I, minor, term to 2027-02-16
What stands out
- Its term runs 3 years and 94 days, November 14, 2023 to February 16, 2027.
- No dated event in the 365 days to October 14, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NA-22-G40 SHIPROCK EAST SCATTERED XIX |
|---|---|
| Permittee | NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY |
| NPDES ID | AZR10I12M |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 14, 2023 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Shiprock, NM 87420 |
| Subwatershed | Rattlesnake Wash-San Juan River (HUC 140801050704) |
NPDES AZR10I12M: effluent limits and exceedances
NA-22-G40 SHIPROCK EAST SCATTERED XIX (NPDES AZR10I12M): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZR10I12M: no pollutant row on file.
NPDES AZR10I12M: inspections, violations and enforcement
NPDES AZR10I12M (NA-22-G40 SHIPROCK EAST SCATTERED XIX): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZR10I12M
NPDES AZR10I12M: one email when its EPA record changes — $99/month.
Permits near NPDES AZR10I12M
NPDES AZR10I12M: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.