NPDES AZR10I14B · Clean Water Act
GALLUP SCATTERED NORTH 2020: NA-20-G16, Twin Lakes, NM: NPDES AZR10I14B discharge permit, effluent exceedances, inspections, penalties
GALLUP SCATTERED NORTH 2020: NA-20-G16, Twin Lakes, New Mexico: General permit coverage AZR10I14B, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY; Construction stormwater; Effective; issued February 21, 2024, term to February 16, 2027, by U.S. EPA.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 1,713 were issued before AZR10I14B. NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY holds 131 permits in New Mexico.
Other permits held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- NA-13-Z89/Z90 NAVAJO GALLUP WATER SUPPLY PROJECT REACH 14.1 AND 14.2, Churchrock: AZR10I01Y, issued 2017-05-17
- NA-17-F58 FFO HOUSING SCATTERED XI, Nageezi: AZR10I0A3, issued 2018-07-02
- NA-17-W20 SHIPROCK NORTH LIFT STATION REPLACEMENT, Shiprock: AZR10I0KC, issued 2020-04-08
- NA-18-U67 RAMAH WHITEROCK UNIT ONE CISTERNS, Mountain View: AZR10I0LE, issued 2020-08-25
- NA-18-W59 WHITEROCK SOUTH WATERLINE EXTENSION, Whiterock: AZR10I0LF, issued 2020-08-25
- NA-17-U21/X09: BURNHAM HUNTER WASH WATERLINE EXTENSION, Burnham: AZR10I0M5, issued 2020-10-29
- NA-19-F96 FFO HOUSING SCATTERED XIII, Nageezi: AZR10I0O9, issued 2021-04-28
- C014524 PROJECT # N11 (1A) 1,2&4 MARIANO LAKE, NEW MEXICO: NECA 1416, Mariano Lake: AZR10I0OA, issued 2021-04-28
- THOREAU WELL CONNECTION PROJECT: NECA 1413, Thoreau: AZR10I0OM, issued 2021-05-26
- NA-19-F94 SHIPROCK EAST SCATTERED XVII, Shiprock: AZR10I0OR, issued 2021-06-01
Coverages issued nearest AZR10I14B
- 2024-02-17: NORTH NM - 314 BIKE & PEDESTRIAN IMPROVEMENTS PHASE II, CN: A300894, Los Lunas: NMR10067W, held by Village of Los Lunas
- 2024-02-19: NAVAJO NATION MUNICIPAL PIPELINE (NNMP) HDD REPAIR PROJECT, Fruitland: AZR10I14A, held by United States Bureau of Reclamation
- 2024-02-20: SANDOVAL COUNTY SOLID WASTE REGIONAL CENTER, Rio Rancho: NMR100681, held by Sandoval County
- 2024-02-20: ALLSUP'S #102429 (CUBA, NM), Cuba: NMR100682, held by Snyder Construction LLC
- 2024-02-20: RIO LUCIO MDWCA WATER SYSTEM IMPROVEMENTS PROJECT, Penasco: NMR100684, held by Barraza & Sons LLC
- 2024-02-21: 1371 NNMP HDD REPAIR PROJECT 2024, Upper Fruitland: AZR10I14D, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2024-02-21: GMCS TOHATCHI HIGH SCHOOL, Tohatchi: AZR10I14E, held by BRADBURY STAMM CONSTRUCTION
- 2024-02-22: FUEL FARM LOS ALAMOS AIRPORT, Los Alamos: NMR100688, held by Los Alamos County Public Works
- 2024-02-26: JLM LIVING RR TRAILSIDE, LLC, Rio Rancho: NMR10068B
- 2024-02-26: CAMINO REAL TRAIL PROJECT, Santa Fe: NMR10068C, held by JDR & Associates LLC
GALLUP SCATTERED NORTH 2020: NA-20-G16 among its neighbors
37 discharge permits are in the Dye Brush Wash subwatershed (HUC 140801061002); AZR10I14B is one.
Other permits in the Dye Brush Wash subwatershed (HUC 140801061002)
- COYOTE CANYON WEST SCATTERED HOMES: NA-22-LL6, Coyote Canyon: AZR10I1FA, minor, term to 2027-02-16
- GALLUP NORTH SCATTERED: NA-21-G27, Twin Lakes: AZR10I1GB, minor, term to 2027-02-16
- GALLUP SOUTH SCATTERED HOUSING 2022: NA-22-G31, Bread Springs: AZR10I163, minor, term to 2027-02-16
- NA-16-T93 TWIN LAKES ROUTE 9 SCATTERED, Twin Lakes: AZR10I1F3, minor, term to 2027-02-16
- NA-18-F83 HAYSTACK-IYANBITO-THOREAU-BACA SCATTERED HOUSING 2018, Thoreau: AZR10I12R, minor, term to 2027-02-16
- NA-18-F85, GALLUP DISTRICT-WIDE SCATTERED HOUSING 2018, Gallup: AZR10I0MH, minor, term to 2022-02-15
- NA-18-U42/XR5 TWIN LAKES-MEXICAN SPRINGS-TOHATCHI SCATTERED, Tohatchi: AZR10I0U9, minor, term to 2027-02-16
- NA-19-F98 BACA-BREADSPRINGS-IYANBITO-THOREAU SCATTERED HOUSING 2019, Churchrock: AZR10I12Q, minor, term to 2027-02-16
- NA-19-U77 - TWIN LAKES BLK CRK & RTE 30 SCATTERED, Gallup: AZR10I0Z3, minor, term to 2027-02-16
- NA-19-U77 TWIN LAKES/BLACK CREEK-NAVAJO ROUTE 30 SCATTERED, Twin Lakes: AZR10I0Z9, minor, term to 2027-02-16
What stands out
- Its term runs 2 years and 360 days, February 21, 2024 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | GALLUP SCATTERED NORTH 2020: NA-20-G16 |
|---|---|
| Permittee | NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY |
| NPDES ID | AZR10I14B |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | February 21, 2024 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Twin Lakes, NM 87375 |
| Subwatershed | Dye Brush Wash (HUC 140801061002) |
NPDES AZR10I14B: effluent limits and exceedances
GALLUP SCATTERED NORTH 2020: NA-20-G16 (NPDES AZR10I14B): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZR10I14B: no pollutant row on file.
NPDES AZR10I14B: inspections, violations and enforcement
NPDES AZR10I14B (GALLUP SCATTERED NORTH 2020: NA-20-G16): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZR10I14B
NPDES AZR10I14B: one email when its EPA record changes — $99/month.
Permits near NPDES AZR10I14B
NPDES AZR10I14B: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.