NPDES AZR10I18Q · Clean Water Act
NA-23-G52: SHIPROCK EAST SCATTERED HOUSING 2023, Shiprock, NM: NPDES AZR10I18Q discharge permit, effluent exceedances, inspections, penalties
NA-23-G52: SHIPROCK EAST SCATTERED HOUSING 2023, Shiprock, New Mexico: General permit coverage AZR10I18Q, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY; Construction stormwater; Effective; issued November 12, 2024, term to February 16, 2027, by U.S. EPA.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 2,157 were issued before AZR10I18Q. NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY holds 131 permits in New Mexico.
Other permits held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- NA-13-Z89/Z90 NAVAJO GALLUP WATER SUPPLY PROJECT REACH 14.1 AND 14.2, Churchrock: AZR10I01Y, issued 2017-05-17
- NA-17-F58 FFO HOUSING SCATTERED XI, Nageezi: AZR10I0A3, issued 2018-07-02
- NA-17-W20 SHIPROCK NORTH LIFT STATION REPLACEMENT, Shiprock: AZR10I0KC, issued 2020-04-08
- NA-18-U67 RAMAH WHITEROCK UNIT ONE CISTERNS, Mountain View: AZR10I0LE, issued 2020-08-25
- NA-18-W59 WHITEROCK SOUTH WATERLINE EXTENSION, Whiterock: AZR10I0LF, issued 2020-08-25
- NA-17-U21/X09: BURNHAM HUNTER WASH WATERLINE EXTENSION, Burnham: AZR10I0M5, issued 2020-10-29
- NA-19-F96 FFO HOUSING SCATTERED XIII, Nageezi: AZR10I0O9, issued 2021-04-28
- C014524 PROJECT # N11 (1A) 1,2&4 MARIANO LAKE, NEW MEXICO: NECA 1416, Mariano Lake: AZR10I0OA, issued 2021-04-28
- THOREAU WELL CONNECTION PROJECT: NECA 1413, Thoreau: AZR10I0OM, issued 2021-05-26
- NA-19-F94 SHIPROCK EAST SCATTERED XVII, Shiprock: AZR10I0OR, issued 2021-06-01
Coverages issued nearest AZR10I18Q
- 2024-11-08: POWER SOURCES CAPABILITIES FACILITY, Albuquerque: NMR1006T7, held by Hensel Phelps Construction Company
- 2024-11-11: LAS CRUCES FIRE STATION 9, Las Cruces: NMR1006T9, held by CITY OF LAS CRUCES
- 2024-11-11: 15575 SPACE MURALS LANE DRIVEWAY AND BUILDING, Las Cruces: NMR1006TB, held by Arthur Weber
- 2024-11-12: NA-23-G51: GALLUP SATELLITE SCATTERED 2023, Tohajiilee: AZR10I18M, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2024-11-12: NA-22-LR4: CHICHILTAH PIGEON SPRINGS WATERLINE EXTENSIONS, Chichiltah: AZR10I18P, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2024-11-12: NA-22-LR1: NASCHITTI CHAPTER-WILSON CISTERNS, Naschitti: AZR10I18S, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2024-11-12: NA-21-W57 SIHASIN SHEEPSPRINGS WATERLINE EXTENSION AND BOOSTER, Sheepsprings: AZR10I18T, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2024-11-12: ALAMO-TOHATCHI-TWIN LAKES- MEXICAN SPRINGS SCATTERED: NA-15-F16, Alamo: AZR10I18W, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2024-11-12: NA-19-U98 ALAMO PHASE 1 CISTERNS, Alamo: AZR10I194, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2024-11-12: NA-23-G48 GALLUP SCATTERED HOUSING 2023, Breadspring: AZR10I196, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
NA-23-G52: SHIPROCK EAST SCATTERED HOUSING 2023 among its neighbors
87 discharge permits are in the Rattlesnake Wash-San Juan River subwatershed (HUC 140801050704); AZR10I18Q is one.
Other permits in the Rattlesnake Wash-San Juan River subwatershed (HUC 140801050704)
- (F79) SHIPROCK MEDICAL REFERRAL XVI, Shiprock: AZR10I0PK, minor, term to 2022-02-15
- (F94) SHIPROCK EAST SCATTERED XVII, Shiprock: AZR10I0OH, minor, term to 2022-02-15
- (G23) SHIPROCK EAST SCATTERED XVIII, Shiprock: AZR10I0VI, minor, term to 2027-02-16
- (G38) SHIPROCK MEDICAL REFERRALS, Shiprock: AZR10I160, minor, term to 2027-02-16
- (G40) SHIPROCK EAST SCATTERED XIX, Shiprock: AZR10I12H, minor, term to 2027-02-16
- (G52) SHIPROCK EAST SCATTERED HOUSING 2023, Shiprock: AZR10I17P, minor, term to 2027-02-16
- (LI7) SHIPROCK SU FAILED DRAINFIELDS, Shiprock: AZR10I0VH, minor, term to 2027-02-16
- (LJ6) SHIPROCK FARM AREA CISTERN, Shiprock: AZR10I0ZH
- (LM6) SHIPROCK FAILED DRAINFIELD SYSTEMS, Shiprock: AZR10I10G, minor, term to 2027-02-16
- (LM9) SHIPROCK SU FAILED SEPTIC SYSTEM DL2 DL3, Shiprock: AZR10I12I, minor, term to 2027-02-16
What stands out
- Its term runs 2 years and 96 days, November 12, 2024 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NA-23-G52: SHIPROCK EAST SCATTERED HOUSING 2023 |
|---|---|
| Permittee | NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY |
| NPDES ID | AZR10I18Q |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 12, 2024 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Shiprock, NM 87420 |
| Subwatershed | Rattlesnake Wash-San Juan River (HUC 140801050704) |
NPDES AZR10I18Q: effluent limits and exceedances
NA-23-G52: SHIPROCK EAST SCATTERED HOUSING 2023 (NPDES AZR10I18Q): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZR10I18Q: no pollutant row on file.
NPDES AZR10I18Q: inspections, violations and enforcement
NPDES AZR10I18Q (NA-23-G52: SHIPROCK EAST SCATTERED HOUSING 2023): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZR10I18Q
NPDES AZR10I18Q: one email when its EPA record changes — $99/month.
Permits near NPDES AZR10I18Q
NPDES AZR10I18Q: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.