NPDES AZR10I19V · Clean Water Act
NA-22-LP6: COUSINS RADIO TOWER LOOP PHASE 3 EXTENSION, Chichiltah, NM: NPDES AZR10I19V discharge permit, effluent exceedances, inspections, penalties
NA-22-LP6: COUSINS RADIO TOWER LOOP PHASE 3 EXTENSION, Chichiltah, New Mexico: General permit coverage AZR10I19V, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY; Construction stormwater; Effective; issued December 30, 2024, term to February 16, 2027, by U.S. EPA.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 2,242 were issued before AZR10I19V. NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY holds 131 permits in New Mexico.
Other permits held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- NA-13-Z89/Z90 NAVAJO GALLUP WATER SUPPLY PROJECT REACH 14.1 AND 14.2, Churchrock: AZR10I01Y, issued 2017-05-17
- NA-17-F58 FFO HOUSING SCATTERED XI, Nageezi: AZR10I0A3, issued 2018-07-02
- NA-17-W20 SHIPROCK NORTH LIFT STATION REPLACEMENT, Shiprock: AZR10I0KC, issued 2020-04-08
- NA-18-U67 RAMAH WHITEROCK UNIT ONE CISTERNS, Mountain View: AZR10I0LE, issued 2020-08-25
- NA-18-W59 WHITEROCK SOUTH WATERLINE EXTENSION, Whiterock: AZR10I0LF, issued 2020-08-25
- NA-17-U21/X09: BURNHAM HUNTER WASH WATERLINE EXTENSION, Burnham: AZR10I0M5, issued 2020-10-29
- NA-19-F96 FFO HOUSING SCATTERED XIII, Nageezi: AZR10I0O9, issued 2021-04-28
- C014524 PROJECT # N11 (1A) 1,2&4 MARIANO LAKE, NEW MEXICO: NECA 1416, Mariano Lake: AZR10I0OA, issued 2021-04-28
- THOREAU WELL CONNECTION PROJECT: NECA 1413, Thoreau: AZR10I0OM, issued 2021-05-26
- NA-19-F94 SHIPROCK EAST SCATTERED XVII, Shiprock: AZR10I0OR, issued 2021-06-01
Coverages issued nearest AZR10I19V
- 2024-12-26: RED HAWK GOLF COURSE CLUBHOUSE - OWNER, Las Cruces: NMR1006WQ, held by SIerra Norte Development, Inc.
- 2024-12-26: PNM SANDIA ENERGY CENTER, Albuquerque: NMR1006WR, held by Depcom Power
- 2024-12-27: 7 BREW DRIVED-THRU COFFEE, Albuquerque: NMR1006WT, held by 7B NEW MEXICO, LLC
- 2024-12-30: COUSINS RADIOTOWER LOOP PHASE 4 EXTENSION (LP7), Gallup: AZR10I19S, held by Navajo Area Indian Health Service
- 2024-12-30: COUSINS RADIOTOWER LOOP PHASE 3 EXTENSION (LP6), Gallup: AZR10I19T, held by Navajo Area Indian Health Service
- 2024-12-30: NA-22-LP7: COUSINS RADIO LOOP PHASE 4 EXTENSION, Chilchiltah: AZR10I19W, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2024-12-30: HARRISON MIDDLE SCHOOL, Albuquerque: NMR1006WW, held by Albuquerque Public Schools
- 2024-12-31: I25 AND NM6 OPERATIONAL IMPROVEMENTS, Los Lunas: NMR1006X0, held by Desert Fox Paving
- 2024-12-31: LOS DIAMANTES PHASE 3, Rio Rancho: NMR1006X2, held by LD DEVELOPMENT, LLC
- 2025-01-02: CARSON-BURNHAM REGIONAL WATER SUPPLY, Bloomfield: AZR10I19Z, held by Canyon Construction CO
NA-22-LP6: COUSINS RADIO TOWER LOOP PHASE 3 EXTENSION among its neighbors
31 discharge permits are in the Defiance Draw-Puerco River subwatershed (HUC 150200060407); AZR10I19V is one.
Other permits in the Defiance Draw-Puerco River subwatershed (HUC 150200060407)
- BNSF PURTY ROCK STABILIZATION MP167.5, Gallup: NMR10082Q
- CITY OF GALLUP WWTP, Gallup: NMR05H789
- GALLUP, CITY OF, Mckinley: NML020672, minor, term to 2025-12-31
- NA-15-T57/XH3 COALMINE/TSE BONITO W/L EXTENSION, Coal Mine: AZR10I124, minor, term to 2027-02-16
- NA-18-U40/XR3 - RED ROCK-EAST REMNANT MESA SCATTERED, Bread Springs: AZR10I1HM, minor, term to 2027-02-16
- NA-18-U40/XR3 RED ROCK-EAST REMNANT MESA SCATTERED PHASE 2, Breadsprings: AZR10I1IC, minor, term to 2027-02-16
- NA-19-F97 CHICHILTAH-HOUCK SCATTERED HOUSING 2019, Chichiltah: AZR10I123, minor, term to 2027-02-16
- NA-19-U95 MANUELITO CHAPTER HOUSE CISTERNS, Manuelito: AZR10I15L, minor, term to 2027-02-16
- NA-20-G15 - GALLUP SOUTH SCATTERED, Gallup: AZR10I0YQ, minor, term to 2027-02-16
- NA-20-G17, GALLUP EAST SCATTERED, Church Rock: AZR10I12Y, minor, term to 2027-02-16
Identity
| Facility | NA-22-LP6: COUSINS RADIO TOWER LOOP PHASE 3 EXTENSION |
|---|---|
| Permittee | NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY |
| NPDES ID | AZR10I19V |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 30, 2024 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Chichiltah, NM 87305 |
| Subwatershed | Defiance Draw-Puerco River (HUC 150200060407) |
NPDES AZR10I19V: effluent limits and exceedances
NA-22-LP6: COUSINS RADIO TOWER LOOP PHASE 3 EXTENSION (NPDES AZR10I19V): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZR10I19V: no pollutant row on file.
NPDES AZR10I19V: inspections, violations and enforcement
NPDES AZR10I19V (NA-22-LP6: COUSINS RADIO TOWER LOOP PHASE 3 EXTENSION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZR10I19V
NPDES AZR10I19V: one email when its EPA record changes — $99/month.
Permits near NPDES AZR10I19V
NPDES AZR10I19V: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.