NPDES AZR10I1DE · Clean Water Act
NA-22-G37 BURNHAM-SANOSTEE HOUSING, Shiprock, NM: NPDES AZR10I1DE discharge permit, effluent exceedances, inspections, penalties
NA-22-G37 BURNHAM-SANOSTEE HOUSING, Shiprock, New Mexico: General permit coverage AZR10I1DE, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY; Construction stormwater; Effective; issued September 8, 2025, term to February 16, 2027, by U.S. EPA.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 2,729 were issued before AZR10I1DE. NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY holds 131 permits in New Mexico.
Other permits held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- NA-13-Z89/Z90 NAVAJO GALLUP WATER SUPPLY PROJECT REACH 14.1 AND 14.2, Churchrock: AZR10I01Y, issued 2017-05-17
- NA-17-F58 FFO HOUSING SCATTERED XI, Nageezi: AZR10I0A3, issued 2018-07-02
- NA-17-W20 SHIPROCK NORTH LIFT STATION REPLACEMENT, Shiprock: AZR10I0KC, issued 2020-04-08
- NA-18-U67 RAMAH WHITEROCK UNIT ONE CISTERNS, Mountain View: AZR10I0LE, issued 2020-08-25
- NA-18-W59 WHITEROCK SOUTH WATERLINE EXTENSION, Whiterock: AZR10I0LF, issued 2020-08-25
- NA-17-U21/X09: BURNHAM HUNTER WASH WATERLINE EXTENSION, Burnham: AZR10I0M5, issued 2020-10-29
- NA-19-F96 FFO HOUSING SCATTERED XIII, Nageezi: AZR10I0O9, issued 2021-04-28
- C014524 PROJECT # N11 (1A) 1,2&4 MARIANO LAKE, NEW MEXICO: NECA 1416, Mariano Lake: AZR10I0OA, issued 2021-04-28
- THOREAU WELL CONNECTION PROJECT: NECA 1413, Thoreau: AZR10I0OM, issued 2021-05-26
- NA-19-F94 SHIPROCK EAST SCATTERED XVII, Shiprock: AZR10I0OR, issued 2021-06-01
Coverages issued nearest AZR10I1DE
- 2025-09-04: TIERRA DEL ORO PHASE 3, Rio Rancho: NMR1007FC, held by HAKES BROTHERS ABQ, LLC
- 2025-09-04: EASTLAND HILLS, Los Lunas: NMR1007FD, held by HAKES BROTHERS ABQ, LLC
- 2025-09-05: LOBO NORTH HOLES AND ROADS PROJECT, Encino: NMR1007FE, held by Lobo Power, LLC
- 2025-09-05: GOODMAN AVENUE RECONSTRUCTION, Rio Communities: NMR1007FF, held by Albuquerque Asphalt, Inc
- 2025-09-08: CHI-CHIL-TAH / REDROCK FAILED STDF DL4: NA-24-MF6, Chichiltah: AZR10I1DD, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2025-09-08: 1484 N5001(1)1,2&4 ROAD TOADLENA/TWO GREY HILLS PROJECT, Toadlena/Two Grey Hills: AZR10I1DF, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2025-09-08: NASCHITTI-MEXICAN SPRINGS-TWIN LAKES FAILED SEPTICS: NA-23-MD6, Twin Lakes: AZR10I1DG, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2025-09-08: NASCHITTI WILDCAT SPRINGS CISTERNS: NA-22-LR2, Twin Lakes: AZR10I1DH, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2025-09-08: NEWCOMB SCATTERED: NA-22-LM5, Burnham/Newcomb: AZR10I1DI, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2025-09-08: BURNHAM BISTI CHURCH SCATTERED : NA-22-LM4, Bisti: AZR10I1DJ, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
NA-22-G37 BURNHAM-SANOSTEE HOUSING among its neighbors
87 discharge permits are in the Rattlesnake Wash-San Juan River subwatershed (HUC 140801050704); AZR10I1DE is one.
Other permits in the Rattlesnake Wash-San Juan River subwatershed (HUC 140801050704)
- (F79) SHIPROCK MEDICAL REFERRAL XVI, Shiprock: AZR10I0PK, minor, term to 2022-02-15
- (F94) SHIPROCK EAST SCATTERED XVII, Shiprock: AZR10I0OH, minor, term to 2022-02-15
- (G23) SHIPROCK EAST SCATTERED XVIII, Shiprock: AZR10I0VI, minor, term to 2027-02-16
- (G38) SHIPROCK MEDICAL REFERRALS, Shiprock: AZR10I160, minor, term to 2027-02-16
- (G40) SHIPROCK EAST SCATTERED XIX, Shiprock: AZR10I12H, minor, term to 2027-02-16
- (G52) SHIPROCK EAST SCATTERED HOUSING 2023, Shiprock: AZR10I17P, minor, term to 2027-02-16
- (LI7) SHIPROCK SU FAILED DRAINFIELDS, Shiprock: AZR10I0VH, minor, term to 2027-02-16
- (LJ6) SHIPROCK FARM AREA CISTERN, Shiprock: AZR10I0ZH
- (LM6) SHIPROCK FAILED DRAINFIELD SYSTEMS, Shiprock: AZR10I10G, minor, term to 2027-02-16
- (LM9) SHIPROCK SU FAILED SEPTIC SYSTEM DL2 DL3, Shiprock: AZR10I12I, minor, term to 2027-02-16
What stands out
- Its term runs 1 year and 161 days, September 8, 2025 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NA-22-G37 BURNHAM-SANOSTEE HOUSING |
|---|---|
| Permittee | NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY |
| NPDES ID | AZR10I1DE |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 8, 2025 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Shiprock, NM 87420 |
| Subwatershed | Rattlesnake Wash-San Juan River (HUC 140801050704) |
NPDES AZR10I1DE: effluent limits and exceedances
NA-22-G37 BURNHAM-SANOSTEE HOUSING (NPDES AZR10I1DE): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZR10I1DE: no pollutant row on file.
NPDES AZR10I1DE: inspections, violations and enforcement
NPDES AZR10I1DE (NA-22-G37 BURNHAM-SANOSTEE HOUSING): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZR10I1DE
NPDES AZR10I1DE: one email when its EPA record changes — $99/month.
Permits near NPDES AZR10I1DE
NPDES AZR10I1DE: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.