NPDES AZR10I1GR · Clean Water Act
NA-22-G32 GALLUP EAST SCATTERED HOUSING 2022, Church Rock, NM: NPDES AZR10I1GR discharge permit, effluent exceedances, inspections, penalties
NA-22-G32 GALLUP EAST SCATTERED HOUSING 2022, Church Rock, New Mexico: General permit coverage AZR10I1GR, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY; Construction stormwater; Effective; issued March 17, 2026, term to February 16, 2027, by U.S. EPA.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 3,109 were issued before AZR10I1GR. NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY holds 131 permits in New Mexico.
Other permits held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- NA-13-Z89/Z90 NAVAJO GALLUP WATER SUPPLY PROJECT REACH 14.1 AND 14.2, Churchrock: AZR10I01Y, issued 2017-05-17
- NA-17-F58 FFO HOUSING SCATTERED XI, Nageezi: AZR10I0A3, issued 2018-07-02
- NA-17-W20 SHIPROCK NORTH LIFT STATION REPLACEMENT, Shiprock: AZR10I0KC, issued 2020-04-08
- NA-18-U67 RAMAH WHITEROCK UNIT ONE CISTERNS, Mountain View: AZR10I0LE, issued 2020-08-25
- NA-18-W59 WHITEROCK SOUTH WATERLINE EXTENSION, Whiterock: AZR10I0LF, issued 2020-08-25
- NA-17-U21/X09: BURNHAM HUNTER WASH WATERLINE EXTENSION, Burnham: AZR10I0M5, issued 2020-10-29
- NA-19-F96 FFO HOUSING SCATTERED XIII, Nageezi: AZR10I0O9, issued 2021-04-28
- C014524 PROJECT # N11 (1A) 1,2&4 MARIANO LAKE, NEW MEXICO: NECA 1416, Mariano Lake: AZR10I0OA, issued 2021-04-28
- THOREAU WELL CONNECTION PROJECT: NECA 1413, Thoreau: AZR10I0OM, issued 2021-05-26
- NA-19-F94 SHIPROCK EAST SCATTERED XVII, Shiprock: AZR10I0OR, issued 2021-06-01
Coverages issued nearest AZR10I1GR
- 2026-03-13: AGUA FRIA/COTTONWOOD INTERSECTION IMPROVEMENTS, CN: S100370, Santa Fe: NMR1007RQ, held by GM Emulsion, LLC
- 2026-03-16: AUTOZONE STORE #10875, Las Cruces: NMR1007RT, held by AutoZone Development, LLC
- 2026-03-16: DON DIEGO ROAD RECONSTRUCTION, Rio Communities: NMR1007RU, held by Desert Fox Paving
- 2026-03-16: SOUTH SAN JOSE PARK, Albuquerque: NMR1007RV, held by Accent Landscaping Contractor
- 2026-03-16: ISLETA BOULEVARD CORRIDOR PHASE 1, Albuquerque: NMR1007RW, held by Bernalillo County Public Works
- 2026-03-17: CID'S SOUTHSIDE GROCERY STORE, Taos: NMR1007RX, held by R&M Construction, LLC
- 2026-03-17: BARKER DOME ROAD UPGRADE, Kirtland: NMR1007RZ, held by SolExergy
- 2026-03-18: HERCULES INDUSTRIES WAREHOUSE, Albuquerque: NMR1007S0, held by HERCULES CAPITAL, LLC
- 2026-03-18: SOUTH SAN JOSE PARK, Albuquerque: NMR1007S1, held by City of ABQ
- 2026-03-19: NMGC COBISA 10 ML PROJECT, Albuquerque: NMR1007S2, held by New Mexico Gas Company
NA-22-G32 GALLUP EAST SCATTERED HOUSING 2022 among its neighbors
12 discharge permits are in the Upper Mitchell Draw subwatershed (HUC 130202070101); AZR10I1GR is one.
Other permits in the Upper Mitchell Draw subwatershed (HUC 130202070101)
- BACA/THOREAU WATER SYSTEM WELL PROJECT - PHASE I, Continental Divide: AZR10I0G4
- BACA/THOREAU WATER SYSTEM WELL PROJECT - PHASE II, Continental Divide: AZR10I0G5
- BREAD SPRINGS - HAYSTACK SCATTERED HOUSING 2017 (F65), Thoreau: AZR10I0S2, minor, term to 2022-02-15
- NA-17-F65 BREADSPRINGS-HAYSTACK HOUSING SUPPORT 2017, Thoreau: AZR10I0UJ, minor, term to 2027-02-16
- NA-18-F83, HAYSTACK-IYANBITO-THOREAU-BACA SCATTERED HOUSING 2018, Thoreau: AZR10I12E, minor, term to 2027-02-16
- NA-20-LB7, GALLUP FAILED SEPTIC SYSTEMS EAST, Thoreau: AZR10I167, minor, term to 2027-02-16
- NA-20-LB9, BACA I-40 CROSSING CISTERNS, Prewitt: AZR10I111, minor, term to 2027-02-16
- NA-20-LC1, BACA SOUTH CISTERNS, Prewitt: AZR10I12F, minor, term to 2027-02-16
- SIHASIN (2017) HAYSTACK CISTERNS (W23), Thoreau: AZR10I0RW, minor, term to 2022-02-15
- THOREAU SONSELA WELL, Continental Divide: AZR10I0MG
What stands out
- Its term runs 336 days, March 17, 2026 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NA-22-G32 GALLUP EAST SCATTERED HOUSING 2022 |
|---|---|
| Permittee | NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY |
| NPDES ID | AZR10I1GR |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 17, 2026 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Church Rock, NM 87311 |
| Subwatershed | Upper Mitchell Draw (HUC 130202070101) |
NPDES AZR10I1GR: effluent limits and exceedances
NA-22-G32 GALLUP EAST SCATTERED HOUSING 2022 (NPDES AZR10I1GR): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZR10I1GR: no pollutant row on file.
NPDES AZR10I1GR: inspections, violations and enforcement
NPDES AZR10I1GR (NA-22-G32 GALLUP EAST SCATTERED HOUSING 2022): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZR10I1GR
NPDES AZR10I1GR: one email when its EPA record changes — $99/month.
Permits near NPDES AZR10I1GR
NPDES AZR10I1GR: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.