NPDES AZR10I0RB · Clean Water Act
NA-19-G01 CHURCHROCK SCATTERED HOUSING 2019, Churchrock, NM: NPDES AZR10I0RB discharge permit, effluent exceedances, inspections, penalties
NA-19-G01 CHURCHROCK SCATTERED HOUSING 2019, Churchrock, New Mexico: General permit coverage AZR10I0RB, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY; Construction stormwater; Administratively continued; issued November 1, 2021, term to February 15, 2022, by U.S. EPA.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 443 were issued before AZR10I0RB. NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY holds 131 permits in New Mexico.
Other permits held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- NA-13-Z89/Z90 NAVAJO GALLUP WATER SUPPLY PROJECT REACH 14.1 AND 14.2, Churchrock: AZR10I01Y, issued 2017-05-17
- NA-17-F58 FFO HOUSING SCATTERED XI, Nageezi: AZR10I0A3, issued 2018-07-02
- NA-17-W20 SHIPROCK NORTH LIFT STATION REPLACEMENT, Shiprock: AZR10I0KC, issued 2020-04-08
- NA-18-U67 RAMAH WHITEROCK UNIT ONE CISTERNS, Mountain View: AZR10I0LE, issued 2020-08-25
- NA-18-W59 WHITEROCK SOUTH WATERLINE EXTENSION, Whiterock: AZR10I0LF, issued 2020-08-25
- NA-17-U21/X09: BURNHAM HUNTER WASH WATERLINE EXTENSION, Burnham: AZR10I0M5, issued 2020-10-29
- NA-19-F96 FFO HOUSING SCATTERED XIII, Nageezi: AZR10I0O9, issued 2021-04-28
- C014524 PROJECT # N11 (1A) 1,2&4 MARIANO LAKE, NEW MEXICO: NECA 1416, Mariano Lake: AZR10I0OA, issued 2021-04-28
- THOREAU WELL CONNECTION PROJECT: NECA 1413, Thoreau: AZR10I0OM, issued 2021-05-26
- NA-19-F94 SHIPROCK EAST SCATTERED XVII, Shiprock: AZR10I0OR, issued 2021-06-01
Coverages issued nearest AZR10I0RB
- 2021-10-27: SONOMA SPRINGS AVENUE EXENSION, Las Cruces: NMR1004A4, held by Morrow Enterprises, Inc
- 2021-10-27: MESITA WASTEWATER COLLECTION IMPROVEMENTS, Mesita: NMR10I065, held by AUI, Inc.
- 2021-10-28: SOUTHEAST WW COLLECTION SYSTEMS IMPROVEMENTS, LAGUNA WW COLLECTION IMPROVEMENTS, Laguna: NMR10I066, held by RMCI, Inc.
- 2021-11-01: NA-18-U47/XS1 CARSON EAST WATERLINE EXTENSION, Huerfano: AZR10I0R9, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2021-11-01: NA-18-U48/XS2 CHURCHROCK COAL MINE SCATTERED, Churchrock: AZR10I0RA, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2021-11-01: YELLOWMAN SIPHON HDPE CONSTRUCTION, Fruitland: AZR10I0RD, held by Meridian Contracting, Inc.
- 2021-11-01: SINGLE FAMILY HOME - 573 E. AFTON, La Mesa: NMR1004AD, held by JMS Construction
- 2021-11-01: SUNPORT TAXIWAY G1 RELOCATION AND TAXIWAY C FILLET REDUCTION, Albuquerque: NMR1004AF, held by TLC Plumbing and Utility
- 2021-11-01: RED HAWK ESTATES, PHASE 2, Las Cruces: NMR1004AH, held by Caliper Construction, Inc.
- 2021-11-01: RED HAWK ESTATES, PHASE 2, Las Cruces: NMR1004AI, held by SIerra Norte Development, Inc.
NA-19-G01 CHURCHROCK SCATTERED HOUSING 2019 among its neighbors
23 discharge permits are in the Church Rock-South Fork Puerco River subwatershed (HUC 150200060105); AZR10I0RB is one.
Other permits in the Church Rock-South Fork Puerco River subwatershed (HUC 150200060105)
- CHURCH ROCK COAL MINE SCATTERED (U48/XS2), Church Rock: AZR10I0QZ, minor, term to 2022-02-15
- CHURCH ROCK SCATTERED HOUSING 2019, Church Rock: AZR10I0QY, minor, term to 2022-02-15
- CHURCHROCK GLOVE FACTORY PHASE II: PROJECT 3019, Churchrock: AZR10I127, minor, term to 2027-02-16
- CN 6101151, Rehoboth: NMR1007NT, minor, term to 2027-02-16
- CN6101151 MCKINLEY COUNTY, Rehoboth: NMR1007NM, minor, term to 2027-02-16
- CN6101291 MCKINLEY CTY NM118, Rehoboth: AZR10I1AG, minor, term to 2027-02-16
- CN6101291 NM 118 MP 25.811 TO 29.827, Rehoboth: AZR10I1AX, minor, term to 2027-02-16
- FIRE ROCK NAVAJO CASINO, Church Rock: NNF001002
- GALLUP EAST SCATTERED HOUSING 2022, Church Rock: AZR10I1GH, minor, term to 2027-02-16
- GALLUP FAILED SEPTICS-CENTRAL (XM3), Church Rock: NMR10I00S, minor, term to 2022-02-15
What stands out
- Its term runs 106 days, November 1, 2021 to February 15, 2022; the term ended 1,702 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NA-19-G01 CHURCHROCK SCATTERED HOUSING 2019 |
|---|---|
| Permittee | NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY |
| NPDES ID | AZR10I0RB |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 1, 2021 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Churchrock, NM 87322 |
| Subwatershed | Church Rock-South Fork Puerco River (HUC 150200060105) |
NPDES AZR10I0RB: effluent limits and exceedances
NA-19-G01 CHURCHROCK SCATTERED HOUSING 2019 (NPDES AZR10I0RB): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZR10I0RB: no pollutant row on file.
NPDES AZR10I0RB: inspections, violations and enforcement
NPDES AZR10I0RB (NA-19-G01 CHURCHROCK SCATTERED HOUSING 2019): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZR10I0RB
NPDES AZR10I0RB: one email when its EPA record changes — $99/month.
Permits near NPDES AZR10I0RB
NPDES AZR10I0RB: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.