NPDES SDR10P5ZY · Clean Water Act
CYCLIC PARK INFRASTRUCTURE IMPROVEMENTS 2026 VARIOUS LOCATIONS, Sioux Falls, SD: NPDES SDR10P5ZY discharge permit, effluent exceedances, inspections, penalties
CYCLIC PARK INFRASTRUCTURE IMPROVEMENTS 2026 VARIOUS LOCATIONS, Sioux Falls, South Dakota: General permit coverage SDR10P5ZY, held by City of Sioux Falls; Construction stormwater; Effective; issued September 4, 2026, term to October 31, 2028, by SDDANR.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 1,257 were issued before SDR10P5ZY. City of Sioux Falls holds 38 permits in South Dakota.
Other permits held by City of Sioux Falls
- E 57TH STREET EXPANSION PROJECT, Sioux Falls: SDR10P113, issued 2021-04-28
- JACOBSON PLAZA AT FALLS PARK, Sioux Falls: SDR10P251, issued 2022-10-19
- PARK ROADS & PARKING LOT IMPROVEMENTS, Sioux Falls: SDR10P286
- COVELL LAKE JAPANESE GARDENS SHORELINE IMPROVEMENTS, Sioux Falls: SDR10P380
- BASIN 15 SANITARY SEWER, PHASE 2A & PHASE 2B EXTENSION, Sioux Falls: SDR10P5B1, issued 2024-08-13
- BASIN 15 EQ BASIN AND LIFT STATION, PHASE 2C EXTENSTION, Sioux Falls: SDR10P5EP, issued 2025-01-03
- 12TH STREET LEWIS & CLARK CONNECTION - PHASE 1, Sioux Falls: SDR10P5EQ, issued 2025-01-03
- ARROWHEAD PARKWAY PHASE 2B @ VETERANS PARKWAY, Sioux Falls: SDR10P5ET, issued 2025-01-02
- PUMP STATION 240 PHASE 2B - ARROWHEAD, Sioux Falls: SDR10P5EU, issued 2025-01-03
- LIGHT, POWER, AND TRAFFIC FACILITY, Sioux Falls: SDR10P5GQ, issued 2025-03-12
Coverages issued nearest SDR10P5ZY
- 2026-08-21: NORTHPOINT PARKING LOT, Lake Andes: SDR10P60Y, held by Federal Highway Administration
- 2026-09-02: B-21 ADAL OPS AMU 1, Ellsworth Air Force Base: SDR10P60L, held by BRYAN CONSTRUCTION
- 2026-09-02: FIRE STATION #9 AND HOMESTEAK PARK (2858), Rapid City: SDR10P617, held by WagCo Construction
- 2026-09-04: YST VETERAN TINY HOMES, Wagner: SDR10I04I, held by Louis Golus III
- 2026-09-04: OLD DOMINION RAPID CITY, Rapid City: SDR10P5KQ, held by Furst Construction Company, Inc.
- 2026-09-04: DEUEL COUNTY RIP RAP IMPROVEMENTS (STRUCTURE NO. 20-200-071), Gary: SDR10P606, held by Deuel County
- 2026-09-04: CITY OF BROOKINGS 2026 PARKS TRAILS, Brookings: SDR10P60B, held by Timmons Construction, Inc.
- 2026-09-04: CITY OF BROOKINGS 2026 ASPHALT MAINTENANCE PROJECT, Brookings: SDR10P60C, held by Bowes Construction, Inc.
- 2026-09-04: DEUEL COUNTY PROJECT BRF 6297(00)24-2, Gary: SDR10P60K, held by Deuel County
- 2026-09-04: 85TH STREET REGIONAL POND - WEST, Sioux Falls: SDR10P61Q, held by City of Sioux Falls
Other permits in Sioux Falls
- 12TH STREET LEWIS & CLARK CONNECTION - PHASE 1, Sioux Falls: SDR10P5EQ, minor, term to 2028-10-31
- 12TH STREET WATER MAIN INSTALLATION - PHASE 2A, Sioux Falls: SDR10P5U4, minor, term to 2028-10-31
- 2025 CINDER AND LIME SLURRY PONDS CLOSURE BY REMOVAL, Sioux Falls: SDR10P5PU, minor, term to 2028-10-31
- 2025 MISCELLANEOUS DRAINAGE IMPROVEMENTS, Sioux Falls: SDR10P5MM, minor, term to 2028-10-31
- 20TH STREET RECONSTRUCTION, Sioux Falls: SDR10P5TH, minor, term to 2028-10-31
- 3500 S. CLIFF AVE GRADINGE, Sioux Falls: SDR10P5TF, minor, term to 2028-10-31
- 3604 W. HOVLAND DRIVE, Sioux Falls: SDR10P5V9, minor, term to 2028-10-31
- 3D SECURITY BUILDING, Sioux Falls: SDR10K154, minor, term to 2023-03-31
- 41 ELLIS ADDITION, Sioux Falls: SDR10K407, minor, term to 2023-03-31
- 4200 N MARION ROAD APARTMENTS, Sioux Falls: SDR10K535, minor, term to 2023-03-31
Identity
| Facility | CYCLIC PARK INFRASTRUCTURE IMPROVEMENTS 2026 VARIOUS LOCATIONS |
|---|---|
| Permittee | City of Sioux Falls |
| NPDES ID | SDR10P5ZY |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 4, 2026 |
| Expires | October 31, 2028 |
| Agency | SDDANR |
| Address | Sioux Falls, SD 57110 |
NPDES SDR10P5ZY: effluent limits and exceedances
CYCLIC PARK INFRASTRUCTURE IMPROVEMENTS 2026 VARIOUS LOCATIONS (NPDES SDR10P5ZY): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10P5ZY: no pollutant row on file.
NPDES SDR10P5ZY: inspections, violations and enforcement
NPDES SDR10P5ZY (CYCLIC PARK INFRASTRUCTURE IMPROVEMENTS 2026 VARIOUS LOCATIONS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10P5ZY
NPDES SDR10P5ZY: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10P5ZY
NPDES SDR10P5ZY: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.