NPDES TXR1513VU · Clean Water Act
CEDAR CREEK SECTION 2 PIPELINE REPLACEMENT PHASE 1B, Mansfield, TX: NPDES TXR1513VU discharge permit, effluent exceedances, inspections, penalties
CEDAR CREEK SECTION 2 PIPELINE REPLACEMENT PHASE 1B, Mansfield, Texas: General permit coverage TXR1513VU, held by Mckee Utility Contractors, Llc; Construction stormwater; Effective; issued September 8, 2025, term to March 4, 2028; discharges to WALNUT CREEK.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 15,682 were issued before TXR1513VU. Mckee Utility Contractors, Llc holds 14 permits in Texas.
Other permits held by Mckee Utility Contractors, Llc
- MCKINNEY EAST SIDE EXTENSION IMPROVEMENTS, Mckinney: TXR1505OQ, issued 2023-10-10
- BRUSHY CREEK WASTEWATER INTERCEPTOR PHASE 4, Hutto: TXR1506XN, issued 2026-03-04
- INTEGRATED PIPELINE PROJECT - PL19MT, Dallas: TXR1509WP, issued 2025-12-01
- LAKE NASWORTH WASTEWATER SYSTEM IMPROVEMENTS, San Angelo: TXR1518MZ, issued 2023-05-31
- PHASE 1B TREATED WATER PIPELINE SEGMENT C, Kyle: TXR1522PX, issued 2024-02-13
- WILBARGER CREEK WASTEWATER INTERCEPTOR, Pflugerville: TXR1523TE, issued 2025-01-06
- WESTSIDE IV TRANSMISSION MAIN-ALEDO RD TO WSIV EST, Fort Worth: TXR1524OA, issued 2023-08-16
- SOUTHEAST LOOP WASTEWATER INTERCEPTOR, Hutto: TXR1528TJ, issued 2025-01-23
- EDS WATERLINE RELOCATION, Point Comfort: TXR1529NE, issued 2023-06-12
- STOVER CREEK FORCE MAIN SEGMENT B, Collin County: TXR1533ZH, issued 2026-08-28
Coverages issued nearest TXR1513VU
- 2025-09-08: WILDFLOWER RANCH, Fort Worth: TXR1507VU, held by Rockwell Tx, LLC
- 2025-09-08: STRATFORD POINTE, Lubbock: TXR1508VU, held by Cwr Designs & Investments, LLC
- 2025-09-08: ENCLAVE AT VILLA ROSA, Odessa: TXR1509VU, held by Ochoa New Home Construction, LLC
- 2025-09-08: DAVID STEPHENSON SUBDIVISION, Combes: TXR1511VU, held by Rene Guerra & Son Hauling LLC
- 2025-09-08: WILLARD CROSSING INFRASTRUCTURE, Celina: TXR1512VU, held by Hba Design Build, LLC
- 2025-09-08: SONORA DESERT HOMES, Willow Park: TXR1514VU, held by Sonora Desert Homes, LLC
- 2025-09-08: NOTTINGHAM COUNTRY WATER PLANT 3, Katy: TXR1515VU, held by Macyas Construction And Utilities
- 2025-09-08: RIVERBEND WEST 2, Austin: TXR1516VU, held by Chasco Constructors, Ltd., L.L.P.
- 2025-09-08: TEMPLE-BELTON WASTEWATER TREATMENT PLANT EXPANSION PH II, Belton: TXR1517VU, held by Matous Construction II, LTD.
- 2025-09-08: GABRIELS HORN DEVELOPMENT, Leander: TXR1518VU, held by Bm22 LLC
CEDAR CREEK SECTION 2 PIPELINE REPLACEMENT PHASE 1B among its neighbors
81 discharge permits are in the Lynn Creek-Walnut Creek subwatershed (HUC 120301020605); TXR1513VU is one. Its county: 1,661, 7 major; TXR1513VU is minor permit.
Other permits in the Lynn Creek-Walnut Creek subwatershed (HUC 120301020605)
- 042-3527 MCDONALDS, Mansfield: TXR1598VV, minor, term to 2028-03-04
- AE MANSFIELD MATLOCK, Mansfield: TXR1556YU, minor, term to 2028-03-04
- AFT INDUSTRIES, Mansfield: TXRNEBW21, minor, term to 2026-08-13
- AFT INDUSTRIES, Mansfield: TXRNECP61, minor, term to 2026-08-13
- ALEXIS COURT TOWNHOMES, Mansfield: TXR1595QB, minor, term to 2028-03-04
- ARLINGTON NEW YORK PLANT, Arlington: TXG112868, minor, term to 2021-11-06
- ARLINGTON PLANT, Arlington: TXG110465, minor, term to 2011-11-07
- ARLINGTON PLANT, Arlington: TXG111826, minor, term to 2016-11-07
- ARLINGTON TRUCK, Arlington: TXR1576QT, minor, term to 2028-03-04
- BEN BARBER INNOVATION - ACADEMY ADDITIONS & RENOVATIONS, Mansfield: TXR1547VK, minor, term to 2028-03-04
What stands out
- Its term runs 2 years and 178 days, September 8, 2025 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | CEDAR CREEK SECTION 2 PIPELINE REPLACEMENT PHASE 1B |
|---|---|
| Permittee | Mckee Utility Contractors, Llc |
| NPDES ID | TXR1513VU |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 8, 2025 |
| Expires | March 4, 2028 |
| Address | Mansfield, TX 76063 |
| Receiving water | WALNUT CREEK |
| Subwatershed | Lynn Creek-Walnut Creek (HUC 120301020605) |
NPDES TXR1513VU: effluent limits and exceedances
CEDAR CREEK SECTION 2 PIPELINE REPLACEMENT PHASE 1B (NPDES TXR1513VU): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1513VU: no pollutant row on file.
NPDES TXR1513VU: inspections, violations and enforcement
NPDES TXR1513VU (CEDAR CREEK SECTION 2 PIPELINE REPLACEMENT PHASE 1B): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1513VU
NPDES TXR1513VU: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1513VU
NPDES TXR1513VU: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.