NPDES TXR1516VU · Clean Water Act
RIVERBEND WEST 2, Austin, TX: NPDES TXR1516VU discharge permit, effluent exceedances, inspections, penalties
RIVERBEND WEST 2, Austin, Texas: General permit coverage TXR1516VU, held by Chasco Constructors, Ltd., L.L.P.; Construction stormwater; Effective; issued September 8, 2025, term to March 4, 2028; discharges to COLORADO RIVER BELOW LADY BIRD LAKE.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 15,682 were issued before TXR1516VU. Chasco Constructors, Ltd., L.L.P. holds 23 permits in Texas.
Other permits held by Chasco Constructors, Ltd., L.L.P.
- MILLION AIR AUSTIN PHASE 2, Austin: TXR1506TO, issued 2025-02-07
- SALERNO PHASE 13, Round Rock: TXR1517TK, issued 2025-01-27
- INTERPORT SECTION 2, Austin: TXR1522QI, issued 2024-03-22
- CALVARY CHURCH, Round Rock: TXR1523MC, issued 2023-03-10
- CR 404 IMPROVEMENTS - FM 3349 TO SAMSUNG HWY, Taylor: TXR1523RA, issued 2024-05-30
- ECXAUS - TUCKER HILL LANE & SPINE RD, Cedar Creek: TXR1527ZE, issued 2026-08-18
- HARRELL PARKWAY PHASE A3, Round Rock: TXR1533XJ, issued 2026-02-18
- HARRELL PARKWAY PHASE A1, Round Rock: TXR1544SM, issued 2024-10-18
- RONALD REAGAN BLVD WIDENING, Georgetown: TXR1546RU, issued 2024-08-14
- LIBERTY HILL PLANT 7, Liberty Hill: TXR1554VY, issued 2025-09-24
Coverages issued nearest TXR1516VU
- 2025-09-08: DAVID STEPHENSON SUBDIVISION, Combes: TXR1511VU, held by Rene Guerra & Son Hauling LLC
- 2025-09-08: WILLARD CROSSING INFRASTRUCTURE, Celina: TXR1512VU, held by Hba Design Build, LLC
- 2025-09-08: CEDAR CREEK SECTION 2 PIPELINE REPLACEMENT PHASE 1B, Mansfield: TXR1513VU, held by Mckee Utility Contractors, Llc
- 2025-09-08: SONORA DESERT HOMES, Willow Park: TXR1514VU, held by Sonora Desert Homes, LLC
- 2025-09-08: NOTTINGHAM COUNTRY WATER PLANT 3, Katy: TXR1515VU, held by Macyas Construction And Utilities
- 2025-09-08: TEMPLE-BELTON WASTEWATER TREATMENT PLANT EXPANSION PH II, Belton: TXR1517VU, held by Matous Construction II, LTD.
- 2025-09-08: GABRIELS HORN DEVELOPMENT, Leander: TXR1518VU, held by Bm22 LLC
- 2025-09-08: RABBS BAYOU DETENTION POND FOR CITY OF ROSENBERG, Rosenberg: TXR1519VU, held by SERCO Construction Group, Ltd.
- 2025-09-08: 150 RESIDENCE HALL - NORTH CENTRAL TEXAS COLLEGE, Gainesville: TXR1520VU, held by Key Construction Texas, LLC
- 2025-09-08: WILSON CREEK PARK, Celina: TXR1524VU, held by Dean Electric, Inc.
RIVERBEND WEST 2 among its neighbors
123 discharge permits are in the Carson Creek-Colorado River subwatershed (HUC 120902050409); TXR1516VU is one. Its county: 1,099, 15 major; TXR1516VU is minor permit.
Other permits in the Carson Creek-Colorado River subwatershed (HUC 120902050409)
- 183 RV PARK, Austin: TXR1501NW, minor, term to 2028-03-04
- 5900 BEN WHITE, Austin: TXR1531KZ, minor, term to 2023-03-05
- ABIA - WEST PARKING GARAGE, Austin: TXR1524TX, minor, term to 2028-03-04
- AEDP AIRFIELD INFRASTRUCTURE - MIDFIELD TAXIWAYS, Austin: TXR1534XK, minor, term to 2028-03-04
- AEDP AIRFIELD INFRASTRUCTURE - MIDFIELD TAXIWAYS, Austin: TXR1538SQ, minor, term to 2028-03-04
- AEDP BUILDING DEMOLITION, Austin: TXR1571NK, minor, term to 2028-03-04
- AFCO GSE TRITURATOR - WASHBAY, Austin: TXR1584WM, minor, term to 2028-03-04
- ALASKA AIRLINES - AUSTIN, Austin: TXRNEBR96, minor, term to 2026-08-13
- ALL AMERICAN RECYCLING, Austin: TXR05FH68, minor, term to 2026-08-13
- ALLEGIANT AIR AT AUS, Austin: TXR05GF69, minor, term to 2026-08-13
What stands out
- Its term runs 2 years and 178 days, September 8, 2025 to March 4, 2028.
- No dated event in the 365 days to October 14, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | RIVERBEND WEST 2 |
|---|---|
| Permittee | Chasco Constructors, Ltd., L.L.P. |
| NPDES ID | TXR1516VU |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 8, 2025 |
| Expires | March 4, 2028 |
| Address | Austin, TX 78617 |
| Receiving water | COLORADO RIVER BELOW LADY BIRD LAKE |
| Subwatershed | Carson Creek-Colorado River (HUC 120902050409) |
| SIC | 1611 – Highway And Street Construction |
NPDES TXR1516VU: effluent limits and exceedances
RIVERBEND WEST 2 (NPDES TXR1516VU): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1516VU: no pollutant row on file.
NPDES TXR1516VU: inspections, violations and enforcement
NPDES TXR1516VU (RIVERBEND WEST 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1516VU
NPDES TXR1516VU: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1516VU
NPDES TXR1516VU: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.