NPDES TXR1517VU · Clean Water Act
TEMPLE-BELTON WASTEWATER TREATMENT PLANT EXPANSION PH II, Belton, TX: NPDES TXR1517VU discharge permit, effluent exceedances, inspections, penalties
TEMPLE-BELTON WASTEWATER TREATMENT PLANT EXPANSION PH II, Belton, Texas: General permit coverage TXR1517VU, held by Matous Construction II, LTD.; Construction stormwater; Effective; issued September 8, 2025, term to March 4, 2028; discharges to NOLAN CREEK/ SOUTH NOLAN CREEK.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 15,682 were issued before TXR1517VU. Matous Construction II, LTD. holds 5 permits in Texas.
Other permits held by Matous Construction II, LTD.
- WILD HORSE RANCH WWTP EXPANSION, Austin: TXR1511MD, issued 2023-03-15
- PECAN BRANCH WWTP, Georgetown: TXR1528WO, issued 2025-11-24
- SAN GABRIEL WWTP REHABILITATION, Georgetown: TXR1593NK, issued 2023-06-30
- GATESVILLE WWTP, Gatesville: TXR1595QS, issued 2024-05-01
Coverages issued nearest TXR1517VU
- 2025-09-08: WILLARD CROSSING INFRASTRUCTURE, Celina: TXR1512VU, held by Hba Design Build, LLC
- 2025-09-08: CEDAR CREEK SECTION 2 PIPELINE REPLACEMENT PHASE 1B, Mansfield: TXR1513VU, held by Mckee Utility Contractors, Llc
- 2025-09-08: SONORA DESERT HOMES, Willow Park: TXR1514VU, held by Sonora Desert Homes, LLC
- 2025-09-08: NOTTINGHAM COUNTRY WATER PLANT 3, Katy: TXR1515VU, held by Macyas Construction And Utilities
- 2025-09-08: RIVERBEND WEST 2, Austin: TXR1516VU, held by Chasco Constructors, Ltd., L.L.P.
- 2025-09-08: GABRIELS HORN DEVELOPMENT, Leander: TXR1518VU, held by Bm22 LLC
- 2025-09-08: RABBS BAYOU DETENTION POND FOR CITY OF ROSENBERG, Rosenberg: TXR1519VU, held by SERCO Construction Group, Ltd.
- 2025-09-08: 150 RESIDENCE HALL - NORTH CENTRAL TEXAS COLLEGE, Gainesville: TXR1520VU, held by Key Construction Texas, LLC
- 2025-09-08: WILSON CREEK PARK, Celina: TXR1524VU, held by Dean Electric, Inc.
- 2025-09-08: FIRST BAPTIST CHURCH OF BELTON, Belton: TXR1525VU, held by R.T. Schneider Construction Co. Ii, Ltd.
TEMPLE-BELTON WASTEWATER TREATMENT PLANT EXPANSION PH II among its neighbors
17 discharge permits are in the Nolan Creek subwatershed (HUC 120702011104); TXR1517VU is one. Its county: 350, 6 major; TXR1517VU is minor permit.
Other permits in the Nolan Creek subwatershed (HUC 120702011104)
- 1210 - 1236 RICHARDS RANCH RD, Belton: TXR1594UN, minor, term to 2028-03-04
- 1211 - 1241 RICHARDS RANCH RD, Belton: TXR1595UN, minor, term to 2028-03-04
- BELL COUNTY MS4, Belton: TXRMW0230
- BELTON AVE DRAINAGE IMPROVEMENTS, Belton: TXR1506XV, minor, term to 2028-03-04
- BELTON CBP, Belton: TXG113027, minor, term to 2026-11-06
- CITY OF BELTON MS4, Belton: TXR040351, minor, term to 2024-01-23
- FIRST BAPTIST CHURCH OF BELTON, Belton: TXR1525VU, minor, term to 2028-03-04
- MCDONALDS 042-3677, Belton: TXR1551ZC, minor, term to 2028-03-04
- ROCKWOOL WATER & WASTEWATER IMPROVEMENTS, Belton: TXR1526WW, minor, term to 2028-03-04
- SADDLE CREEK ADDITION, Belton: TXR1585UW, minor, term to 2028-03-04
What stands out
- Its term runs 2 years and 178 days, September 8, 2025 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | TEMPLE-BELTON WASTEWATER TREATMENT PLANT EXPANSION PH II |
|---|---|
| Permittee | Matous Construction II, LTD. |
| NPDES ID | TXR1517VU |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 8, 2025 |
| Expires | March 4, 2028 |
| Address | Belton, TX 76513 |
| Receiving water | NOLAN CREEK/ SOUTH NOLAN CREEK |
| Subwatershed | Nolan Creek (HUC 120702011104) |
NPDES TXR1517VU: effluent limits and exceedances
TEMPLE-BELTON WASTEWATER TREATMENT PLANT EXPANSION PH II (NPDES TXR1517VU): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1517VU: no pollutant row on file.
NPDES TXR1517VU: inspections, violations and enforcement
NPDES TXR1517VU (TEMPLE-BELTON WASTEWATER TREATMENT PLANT EXPANSION PH II): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1517VU
NPDES TXR1517VU: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1517VU
NPDES TXR1517VU: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.