NPDES TXR1541YY · Clean Water Act
TRINITY RANCH PHASE 2 SECTION 4, Elgin, TX: NPDES TXR1541YY discharge permit, effluent exceedances, inspections, penalties
TRINITY RANCH PHASE 2 SECTION 4, Elgin, Texas: General permit coverage TXR1541YY, held by Jl Gray Construction, LLC; Construction stormwater; Effective; issued July 24, 2026, term to March 4, 2028; discharges to LITTLE SANDY CREEK.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 22,793 were issued before TXR1541YY. Jl Gray Construction, LLC holds 56 permits in Texas.
Other permits held by Jl Gray Construction, LLC
- THE PFARM, Pflugerville: TXR1501XU, issued 2026-03-30
- THE BARRACKS PHASE 1, San Marcos: TXR1502YP, issued 2026-06-17
- THE PRESERVE AT MASON CREEK, Leander: TXR1503YP, issued 2026-06-17
- EASTON PARK SECTION 4B EAST PHASE 2 & 3, Austin: TXR1504XS, issued 2026-03-23
- THE RANCH CENTER LIFT STATION, Liberty Hill: TXR1504YP, issued 2026-06-17
- MELINA - PHASE 1 - LD, Georgetown: TXR1513WR, issued 2025-12-08
- MELINA PHASE 1, Georgetown: TXR1515WX, issued 2026-01-06
- KALI KATE, Buda: TXR1518XJ, issued 2026-02-18
- JUNIPER SPRINGS PHASE 8, Lockhart: TXR1520YU, issued 2026-07-08
- ELDORADO PHASES 7 AND 8, Liberty Hill: TXR1522XR, issued 2026-03-18
Coverages issued nearest TXR1541YY
- 2026-07-24: RESERVE AT MALLARD LAKES, Orange: TXR1536YY, held by Jeremy R Breaux
- 2026-07-24: EAGLE POINT, Orange: TXR1537YY, held by LLC Eagle Point Land
- 2026-07-24: SONOMA VERDE NORTH 4A, Mclendonchisholm: TXR1538YY, held by Atmos Energy Corporation
- 2026-07-24: SONOMA VERDE NORTH 4A, Mclendonchisholm: TXR1539YY, held by Pci Utilities, LLC
- 2026-07-24: HALCYON ONSITE PHS 1A, Hutto: TXR1540YY, held by Atmos Energy Corporation
- 2026-07-24: SAT TDP-CURBSIDE ROADWAYS & SHARED SERVICES PARKING FACILITY, San Antonio: TXR1542YY, held by Hensel Phelps Construction Co., General Partnership
- 2026-07-24: NORTHLAKE 35 LOGISTICS PARK BUILDING 5 AND 6, Northlake: TXR1543YY, held by Raymond Construction Co., Inc.
- 2026-07-24: WAKE WIND REPOWER, Floydada: TXR1544YY, held by M. A. Mortenson Company
- 2026-07-24: GRANBURY PATIO HOMES, Granbury: TXR1545YY, held by D C G Construction LLC
- 2026-07-24: VALOR PHS 2, Alvarado: TXR1546YY, held by D C G Construction LLC
TRINITY RANCH PHASE 2 SECTION 4 among its neighbors
22 discharge permits are in the Little Sandy Creek subwatershed (HUC 120903010203); TXR1541YY is one. Its county: 222, 5 major; TXR1541YY is minor permit.
Other permits in the Little Sandy Creek subwatershed (HUC 120903010203)
- CEDAR HILL TO SWIFTEX T367 TRANSMISSION LINE OVERHAUL, Elgin: TXR1556WP, minor, term to 2028-03-04
- CEDAR HILL TO SWIFTEX T367 TRANSMISSION LINE OVERHAUL, Elgin: TXR1590WS, minor, term to 2028-03-04
- CEDAR HILL TO SWIFTEX TL OVERHAUL, Elgin: TXR1599WR, minor, term to 2028-03-04
- CENTRAL WWTP, Pflugerville: TX0094927, major, term to 2019-09-01
- ELGIN MIDDLE SCHOOL 2, Elgin: TXR1571VM, minor, term to 2028-03-04
- ELGIN WWTP, Elgin: TX0073946, major, term to 2024-10-29
- HIDDEN OAKS SECTION 3, Elgin: TXR1568UU, minor, term to 2028-03-04
- PRADO VISTA SUBDIVISION, Elgin: TXR1553YX, minor, term to 2028-03-04
- SACRED HEART ELGIN, Elgin: TXR1565RW, minor, term to 2028-03-04
- SOUTH ELGIN TRANSMISSION MAIN REPAIR, Elgin: TXR1573PM, minor, term to 2028-03-04
What stands out
- Its term runs 1 year and 224 days, July 24, 2026 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | TRINITY RANCH PHASE 2 SECTION 4 |
|---|---|
| Permittee | Jl Gray Construction, LLC |
| NPDES ID | TXR1541YY |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 24, 2026 |
| Expires | March 4, 2028 |
| Address | Elgin, TX 78621 |
| Receiving water | LITTLE SANDY CREEK |
| Subwatershed | Little Sandy Creek (HUC 120903010203) |
NPDES TXR1541YY: effluent limits and exceedances
TRINITY RANCH PHASE 2 SECTION 4 (NPDES TXR1541YY): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1541YY: no pollutant row on file.
NPDES TXR1541YY: inspections, violations and enforcement
NPDES TXR1541YY (TRINITY RANCH PHASE 2 SECTION 4): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1541YY
NPDES TXR1541YY: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1541YY
NPDES TXR1541YY: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.