NPDES TXR1581WV · Clean Water Act
THE RIDGE AT HIGH BRANCH PH 1, San Marcos, TX: NPDES TXR1581WV discharge permit, effluent exceedances, inspections, penalties
THE RIDGE AT HIGH BRANCH PH 1, San Marcos, Texas: General permit coverage TXR1581WV, held by Jl Gray Construction, LLC; Construction stormwater; Effective; issued December 29, 2025, term to March 4, 2028; discharges to COTTONWOOD CREEK.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 17,835 were issued before TXR1581WV. Jl Gray Construction, LLC holds 56 permits in Texas.
Other permits held by Jl Gray Construction, LLC
- THE PFARM, Pflugerville: TXR1501XU, issued 2026-03-30
- THE BARRACKS PHASE 1, San Marcos: TXR1502YP, issued 2026-06-17
- THE PRESERVE AT MASON CREEK, Leander: TXR1503YP, issued 2026-06-17
- EASTON PARK SECTION 4B EAST PHASE 2 & 3, Austin: TXR1504XS, issued 2026-03-23
- THE RANCH CENTER LIFT STATION, Liberty Hill: TXR1504YP, issued 2026-06-17
- MELINA - PHASE 1 - LD, Georgetown: TXR1513WR, issued 2025-12-08
- MELINA PHASE 1, Georgetown: TXR1515WX, issued 2026-01-06
- KALI KATE, Buda: TXR1518XJ, issued 2026-02-18
- JUNIPER SPRINGS PHASE 8, Lockhart: TXR1520YU, issued 2026-07-08
- ELDORADO PHASES 7 AND 8, Liberty Hill: TXR1522XR, issued 2026-03-18
Coverages issued nearest TXR1581WV
- 2025-12-29: SADDLE RIDGE PH 1, Manor: TXR1571WV, held by Jl Gray Construction, LLC
- 2025-12-29: TRIADA SUBDIVISION PHASE 1, Elgin: TXR1572WV, held by Jl Gray Construction, LLC
- 2025-12-29: CARMEL EAST OFFSITE TRAILS, Pflugervill: TXR1575WV, held by Jl Gray Construction, LLC
- 2025-12-29: WILDHORSE RANCH TRAIL EXTENSION, Austin: TXR1577WV, held by Jl Gray Construction, LLC
- 2025-12-29: SCHWETMAN - PHASE II, Austin: TXR1579WV, held by Jl Gray Construction, LLC
- 2025-12-29: NE WWTP DRIVEWAY REALIGNMENT, Manor: TXR1582WV, held by Jl Gray Construction, LLC
- 2025-12-30: JARO NORTH - UNIT 3, New Braunfels: TXR1501WW, held by PIERCE SITEWORK, LLC
- 2025-12-30: LINCOLN RIDGE BUSINESS PARK, Mckinney: TXR1502WW, held by Legacy Land And Cattle, LLC
- 2025-12-30: MIDTOWN RESERVE PHS 114, College Station: TXR1584WV, held by Atmos Energy Corporation
- 2025-12-30: MIDTOWN RESERVE PHS 114, College Station: TXR1585WV, held by Ccb Construction And Associates, Inc.
THE RIDGE AT HIGH BRANCH PH 1 among its neighbors
41 discharge permits are in the Redwood Cemetery-Cottonwood Creek subwatershed (HUC 121002030305); TXR1581WV is one. Its county: 410, 3 major; TXR1581WV is minor permit.
Other permits in the Redwood Cemetery-Cottonwood Creek subwatershed (HUC 121002030305)
- AMAZONCOM SERVICES SAT2, San Marcos: TXR05FD08, minor, term to 2026-08-13
- ARMED FORCES RESERVE CENTER AT SAN MARCOS TX, San Marcos: TXRNEBT43, minor, term to 2026-08-13
- CENTERPOINT RETAIL OUTLET, San Marcos: TXR1526XR, minor, term to 2028-03-04
- CORVAC COMPOSITES, San Marcos: TXR1593VF, minor, term to 2028-03-04
- CORVAC COMPOSITES, San Marcos: TXRNECD22, minor, term to 2026-08-13
- COTTONWOOD CREEK - PHASE 4 UNIT 1, San Marcos: TXR1551OE, minor, term to 2028-03-04
- COTTONWOOD CREEK SUBDIVISION, San Marcos: TXR1565TA, minor, term to 2028-03-04
- FM 1978 WATER RECLAMATION FACILITY 2, City Of San Marcos: TX0147842, minor, term to 2031-06-29
- H-E-B SAN MARCOS 03, San Marcos: TXR1596VT, minor, term to 2028-03-04
- HEB SAN MARCOS, San Marcos: TXR1587YB, minor, term to 2028-03-04
What stands out
- Its term runs 2 years and 66 days, December 29, 2025 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | THE RIDGE AT HIGH BRANCH PH 1 |
|---|---|
| Permittee | Jl Gray Construction, LLC |
| NPDES ID | TXR1581WV |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 29, 2025 |
| Expires | March 4, 2028 |
| Address | San Marcos, TX 78666 |
| Receiving water | COTTONWOOD CREEK |
| Subwatershed | Redwood Cemetery-Cottonwood Creek (HUC 121002030305) |
NPDES TXR1581WV: effluent limits and exceedances
THE RIDGE AT HIGH BRANCH PH 1 (NPDES TXR1581WV): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1581WV: no pollutant row on file.
NPDES TXR1581WV: inspections, violations and enforcement
NPDES TXR1581WV (THE RIDGE AT HIGH BRANCH PH 1): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1581WV
NPDES TXR1581WV: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1581WV
NPDES TXR1581WV: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.