NPDES UTRC01782 · Clean Water Act
UTANG WATERLINE PROJECT, Salt Lake City, UT: NPDES UTRC01782 discharge permit, effluent exceedances, inspections, penalties
UTANG WATERLINE PROJECT, Salt Lake City, Utah: General permit coverage UTRC01782, held by Sequoia Construction; Construction stormwater; Effective; issued December 16, 2020, term to December 15, 2021, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 1,262 were issued before UTRC01782.
Coverages issued nearest UTRC01782
- 2020-12-11: C&S KELLY RESIDENCE, Kaysville: UTRH01876, held by UpDwell Homes
- 2020-12-14: ANTHEM WEST, Springville: UTR398363, held by Arive Homes
- 2020-12-15: HCA LONE PEAK HOSPITAL, Draper: UTRC01770, held by Layton Construction
- 2020-12-15: MEADOWS ON 7TH, Midvale: UTRC01780, held by Brad Reynolds Construction
- 2020-12-15: 2021 SHULER RESIDENCE, Park City: UTRH01889, held by JD Construction & Development, Inc
- 2020-12-16: KEVIN, Herriman: UTRC01784, held by Gary Baker
- 2020-12-16: CRIMSON HOLLOW, St. George: UTRH01894, held by Jim Park
- 2020-12-17: BRIDLEWALK PHASE 3, Lake Point: UTRC01785, held by Lakepoint Vista LC
- 2020-12-17: GRAYSON RIDGE WEST PHASE 1, Syracuse: UTRC01788, held by Service Mortgage Corporation
- 2020-12-17: FENSTER FARMS LOT 20, Warren: UTRC01789, held by Steve Johnson
UTANG WATERLINE PROJECT among its neighbors
465 discharge permits are in the Outlet Jordan River-Frontal Great Salt Lake subwatershed (HUC 160202040405); UTRC01782 is one.
Other permits in the Outlet Jordan River-Frontal Great Salt Lake subwatershed (HUC 160202040405)
- 1100 WEST WATER LINE: 2100 SOUTH TO 2600 SOUTH, Woods Cross: UTRL00668
- 1800 N SEWER REALIGNMENT PHASE 1, Salt Lake City: UTRC04958, minor, term to 2023-05-01
- 1800 N SEWER REALIGNMENT PHASE 2, Salt Lake City: UTRC07580, minor, term to 2024-09-13
- 1800 N SEWER REALIGNMENT PHASE 3, Salt Lake City: UTRC11635, minor, term to 2026-09-21
- 1800 NORTH, Salt Lake City: UTRC05182, minor, term to 2023-06-01
- 1800 NORTH SEWER LINE REHAB PROJECT (SLRP), Salt Lake City: UT0026271, minor, term to 2028-10-31
- 200 NORTH APARTMENTS, Salt Lake City: UTRC04821, minor, term to 2024-04-13
- 200 SOUTH RECONSTRUCTION, PHASE 2, Salt Lake City: UTRC06478, minor, term to 2024-02-29
- 2025 STREET REBUILD PROJECTS, North Salt Lake: UTRL00624
- 2026 STREET REBUILD PROJECTS, North Salt Lake: UTRC12896, minor, term to 2027-05-26
Identity
| Facility | UTANG WATERLINE PROJECT |
|---|---|
| Permittee | Sequoia Construction |
| NPDES ID | UTRC01782 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 16, 2020 |
| Expires | December 15, 2021 |
| Agency | UTDEQ |
| Address | Salt Lake City, UT 84116 |
| Subwatershed | Outlet Jordan River-Frontal Great Salt Lake (HUC 160202040405) |
NPDES UTRC01782: effluent limits and exceedances
UTANG WATERLINE PROJECT (NPDES UTRC01782): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC01782: no pollutant row on file.
NPDES UTRC01782: inspections, violations and enforcement
NPDES UTRC01782 (UTANG WATERLINE PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC01782
NPDES UTRC01782: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC01782
NPDES UTRC01782: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.