NPDES UTRH01894 · Clean Water Act
CRIMSON HOLLOW, St. George, UT: NPDES UTRH01894 discharge permit, effluent exceedances, inspections, penalties
CRIMSON HOLLOW, St. George, Utah: General permit coverage UTRH01894, held by Jim Park; Construction stormwater; Effective; issued December 16, 2020, term to December 15, 2021, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 1,262 were issued before UTRH01894.
Coverages issued nearest UTRH01894
- 2020-12-15: HCA LONE PEAK HOSPITAL, Draper: UTRC01770, held by Layton Construction
- 2020-12-15: MEADOWS ON 7TH, Midvale: UTRC01780, held by Brad Reynolds Construction
- 2020-12-15: 2021 SHULER RESIDENCE, Park City: UTRH01889, held by JD Construction & Development, Inc
- 2020-12-16: UTANG WATERLINE PROJECT, Salt Lake City: UTRC01782, held by Sequoia Construction
- 2020-12-16: KEVIN, Herriman: UTRC01784, held by Gary Baker
- 2020-12-17: BRIDLEWALK PHASE 3, Lake Point: UTRC01785, held by Lakepoint Vista LC
- 2020-12-17: GRAYSON RIDGE WEST PHASE 1, Syracuse: UTRC01788, held by Service Mortgage Corporation
- 2020-12-17: FENSTER FARMS LOT 20, Warren: UTRC01789, held by Steve Johnson
- 2020-12-17: COLONY PARK 13, St. George: UTRC01793, held by Ashton General Contractors, Inc.
- 2020-12-18: THE VILLAGES AT ARROWHEAD PARK PHASE 5 & 6 LOOP ROAD, Payson: UTRC01796, held by TNT GENERAL CONTRACTORS, LLC
CRIMSON HOLLOW among its neighbors
636 discharge permits are in the Middleton Wash-Virgin River subwatershed (HUC 150100080910); UTRH01894 is one.
Other permits in the Middleton Wash-Virgin River subwatershed (HUC 150100080910)
- 1103 ST GEORGE (SG-5-3-10-1103), St. George: UTRH06625, minor, term to 2024-05-17
- 123 CRIMSON VISTA, St. George: UTRH03262, minor, term to 2022-06-17
- 1236 S SIERRA VISTA CIRCLE, St. George: UTRL00265
- 1358 E PONY TRAIL WAY WASHINGTON, UTAH 84780, Washington: UTRH10276, minor, term to 2026-09-04
- 1450 EAST ROADWAY EXTENSION, St. George: UTRC03020, minor, term to 2022-06-20
- 1450 EAST ROADWAY EXTENSION, St. George: UTRC03088, minor, term to 2022-07-05
- 29 BOULDERS, St. George: UTRH03475, minor, term to 2022-07-26
- 30 GRAND HEIGHTS, St. George: UTRH03266, minor, term to 2022-06-17
- 34 WESTGATE HILLS, Washington: UTRH05029, minor, term to 2023-04-10
- 3430 E/EZRA LN IMPROVMENTS, St. George: UTRL00727
What stands out
- Its term runs 364 days, December 16, 2020 to December 15, 2021; the term ended 1,735 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | CRIMSON HOLLOW |
|---|---|
| Permittee | Jim Park |
| NPDES ID | UTRH01894 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 16, 2020 |
| Expires | December 15, 2021 |
| Agency | UTDEQ |
| Address | St. George, UT 84770 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Middleton Wash-Virgin River (HUC 150100080910) |
NPDES UTRH01894: effluent limits and exceedances
CRIMSON HOLLOW (NPDES UTRH01894): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRH01894: no pollutant row on file.
NPDES UTRH01894: inspections, violations and enforcement
NPDES UTRH01894 (CRIMSON HOLLOW): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRH01894
NPDES UTRH01894: one email when its EPA record changes — $99/month.
Permits near NPDES UTRH01894
NPDES UTRH01894: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.