Velarion Records
Free: one email when NPDES UTRC01785 changes. Unsubscribe any time.

NPDES UTRC01785 · Clean Water Act

BRIDLEWALK PHASE 3, Lake Point, UT: NPDES UTRC01785 discharge permit, effluent exceedances, inspections, penalties

BRIDLEWALK PHASE 3, Lake Point, Utah: General permit coverage UTRC01785, held by Lakepoint Vista LC; Construction stormwater; Administratively continued; issued December 17, 2020, term to December 16, 2021, by UTDEQ.

Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 1,265 were issued before UTRC01785. Lakepoint Vista LC holds 2 permits in Utah.

Other permits held by Lakepoint Vista LC

Coverages issued nearest UTRC01785

BRIDLEWALK PHASE 3 among its neighbors

13 discharge permits are in the Adobe Rock-Frontal Great Salt Lake subwatershed (HUC 160203040405); UTRC01785 is one.

Other permits in the Adobe Rock-Frontal Great Salt Lake subwatershed (HUC 160203040405)

Identity

FacilityBRIDLEWALK PHASE 3
PermitteeLakepoint Vista LC
NPDES IDUTRC01785
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedDecember 17, 2020
ExpiresDecember 16, 2021
AgencyUTDEQ
AddressLake Point, UT 84074
SubwatershedAdobe Rock-Frontal Great Salt Lake (HUC 160203040405)

NPDES UTRC01785: effluent limits and exceedances

BRIDLEWALK PHASE 3 (NPDES UTRC01785): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES UTRC01785: no pollutant row on file.

NPDES UTRC01785: inspections, violations and enforcement

NPDES UTRC01785 (BRIDLEWALK PHASE 3): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES UTRC01785

NPDES UTRC01785: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES UTRC01785

NPDES UTRC01785: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.