Clean Water Act discharge permit · NPDES IDR10I022
CHERRYLANE BRIDGE REPLACEMENT, Lenore, ID: NPDES IDR10I022 discharge permit, effluent exceedances, inspections, penalties
- Administratively continuedPermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
CHERRYLANE BRIDGE REPLACEMENT, held by Nez Perce County, holds NPDES permit IDR10I022. EPA’s file records it issued March 30, 2021 and expiring February 15, 2022. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for CHERRYLANE BRIDGE REPLACEMENT: its NPDES ID, its permit type and status, its dates, its address in Lenore, Idaho. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES IDR10I022.
What stands out
- Its term runs 322 days, March 30, 2021 to February 15, 2022; the term ended 1,702 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | CHERRYLANE BRIDGE REPLACEMENT |
|---|---|
| Permittee as filed | Nez Perce County |
| NPDES ID | IDR10I022 |
| Permit status | Administratively continued (past its expiration date and still in force until reissued) |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | March 30, 2021 |
| Expiration date | February 15, 2022 |
| Issuing agency | U.S. EPA |
| Address | Lenore, ID 83541 |
| Subwatershed | Rattlesnake Canyon-Clearwater River (HUC 170603061305) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES IDR10I022.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES IDR10I022.
Inspections
EPA’s inspection file holds no inspection for NPDES IDR10I022.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES IDR10I022.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, IDR10I022.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID IDR10I022 there.
CHERRYLANE BRIDGE REPLACEMENT, Lenore, Idaho: Coverage under a general permit IDR10I022, held by Nez Perce County; Construction stormwater; Administratively continued (past its expiration date and still in force until reissued); issued March 30, 2021, term to February 15, 2022, by U.S. EPA.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 258 were issued before IDR10I022. Nez Perce County holds 3 permits in Idaho.
Other permits held by Nez Perce County
- CHERRYLANE BRIDGE REPLACEMENT, Lenore: IDR10I025, issued 2021-04-12
- WEBB ROAD, PHASE 2A, Lapwai: IDR10I03R, issued 2025-02-27
Coverages issued nearest IDR10I022
- 2021-03-25: SUNNY ACRES SUBDIVISION NO. 2, Emmett: IDR100312, held by Granite Excavation Inc.
- 2021-03-25: APEX NORTHWEST SUBDIVISION NO. 1, Meridian: IDR100314, held by Brighton Development, Inc.
- 2021-03-30: SAGEWOOD WEST SUBDIVISION, Meridian: IDR10031G, held by Conger Management Gruop
- 2021-03-30: WHITEHURST SUBDIVISION NO. 1, Eagle: IDR10031I, held by Conger Management Group
- 2021-03-30: EAST RIDGE SUBDIVISION NO. 2 & 3, Meridian: IDR10031J, held by Conger Management Group
- 2021-04-01: MALASPINA RANCH SUBDIVISION, Kuna: IDR10031T, held by Conger Management Group
- 2021-04-01: CHERRYLANE BRIDGE REPLACEMENT, Lenore: IDR10I023, held by Cascade Bridge, LLC
- 2021-04-02: PINE 43 - PAD 'E' RETAIL SHOPS, Meridian: IDR10031X, held by DRB Investments LLC
- 2021-04-02: MODERN CRAFTSMAN AT BLACK CAT, Meridian: IDR10031Z, held by Engineered Structures, Inc.
- 2021-04-02: SPRING HOLLOW RANCH SUBDIVISION NO. 2, Nampa: IDR100323, held by Challenger Development, Inc.
CHERRYLANE BRIDGE REPLACEMENT among its neighbors
5 discharge permits are in the Rattlesnake Canyon-Clearwater River subwatershed (HUC 170603061305); IDR10I022 is one.
Other permits in the Rattlesnake Canyon-Clearwater River subwatershed (HUC 170603061305)
- CHERRYLANE BRIDGE REPLACEMENT, Lenore: IDR10I023, minor, term to 2022-02-15
- CHERRYLANE BRIDGE REPLACEMENT, Lenore: IDR10I025, minor, term to 2022-02-15
- NEZ PERCE TRIBAL HATCHERY, Juliaetta: IDG133005, minor, term to 2024-11-30
- NEZ PERCE TRIBAL HATCHERY, Lenore: IDR10I03B, minor, term to 2027-02-16
Nearby on the register
- Discharge permits in Lenore
- Every permit record in Lenore, A to Z
- Discharge permits in Idaho
- Every permit record in Idaho, A to Z
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
The CHERRYLANE BRIDGE REPLACEMENT storm water construction permit is one of 5 such permits in Lenore, Idaho, on EPA's NPDES register, and 0.0% of those 5 permits carry a violation on file. It also sits among 5 NPDES permits in the Rattlesnake Canyon-Clearwater River subwatershed, and none of the pollutants it covers has a numeric limit or an effluent exceedance recorded against it.