NPDES IDR10I025 · Clean Water Act
CHERRYLANE BRIDGE REPLACEMENT, Lenore, ID: NPDES IDR10I025 discharge permit, effluent exceedances, inspections, penalties
CHERRYLANE BRIDGE REPLACEMENT, Lenore, Idaho: General permit coverage IDR10I025, held by Nez Perce County; Construction stormwater; Administratively continued; issued April 12, 2021, term to February 15, 2022, by U.S. EPA.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 268 were issued before IDR10I025. Nez Perce County holds 3 permits in Idaho.
Other permits held by Nez Perce County
- CHERRYLANE BRIDGE REPLACEMENT, Lenore: IDR10I022, issued 2021-03-30
- WEBB ROAD, PHASE 2A, Lapwai: IDR10I03R, issued 2025-02-27
Coverages issued nearest IDR10I025
- 2021-04-02: PINE 43 - PAD 'E' RETAIL SHOPS, Meridian: IDR10031X, held by DRB Investments LLC
- 2021-04-02: MODERN CRAFTSMAN AT BLACK CAT, Meridian: IDR10031Z, held by Engineered Structures, Inc.
- 2021-04-02: SPRING HOLLOW RANCH SUBDIVISION NO. 2, Nampa: IDR100323, held by Challenger Development, Inc.
- 2021-04-02: BOULDER HEIGHTS ESTATES LOTS, Boise: IDR100325, held by Biltmore Company
- 2021-04-12: US-95, LITTLE SALMON RV BR, New Meadows: IDR10032H, held by Idaho Transportation Department
- 2021-04-13: SOUTHRIDGE SUBDIVISION PHASE 5, Meridian: IDR10032K, held by DB Development, LLC
- 2021-04-14: DAPHNE SQUARE SUBDIVISION, Meridian: IDR10032M, held by Berkeley Communities, LLC
- 2021-04-16: BRODY SQUARE SUBDIVISION, Meridian: IDR10032U, held by Granite Excavation Inc.
- 2021-04-16: REPAIR TAXIWAY FOXTROT AND ARM/DISARM PAD, Mountain Home Air Force Base: IDR10032W, held by Northcon, Inc.
- 2021-04-16: UNIVERSITY PLACE, Sandpoint: IDR10032X, held by M&W Holdings LLC
CHERRYLANE BRIDGE REPLACEMENT among its neighbors
5 discharge permits are in the Rattlesnake Canyon-Clearwater River subwatershed (HUC 170603061305); IDR10I025 is one.
Other permits in the Rattlesnake Canyon-Clearwater River subwatershed (HUC 170603061305)
- CHERRYLANE BRIDGE REPLACEMENT, Lenore: IDR10I022, minor, term to 2022-02-15
- CHERRYLANE BRIDGE REPLACEMENT, Lenore: IDR10I023, minor, term to 2022-02-15
- NEZ PERCE TRIBAL HATCHERY, Juliaetta: IDG133005, minor, term to 2024-11-30
- NEZ PERCE TRIBAL HATCHERY, Lenore: IDR10I03B, minor, term to 2027-02-16
What stands out
- Its term runs 309 days, April 12, 2021 to February 15, 2022; the term ended 1,702 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | CHERRYLANE BRIDGE REPLACEMENT |
|---|---|
| Permittee | Nez Perce County |
| NPDES ID | IDR10I025 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 12, 2021 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Lenore, ID 83541 |
| Subwatershed | Rattlesnake Canyon-Clearwater River (HUC 170603061305) |
NPDES IDR10I025: effluent limits and exceedances
CHERRYLANE BRIDGE REPLACEMENT (NPDES IDR10I025): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10I025: no pollutant row on file.
NPDES IDR10I025: inspections, violations and enforcement
NPDES IDR10I025 (CHERRYLANE BRIDGE REPLACEMENT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10I025
NPDES IDR10I025: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10I025
NPDES IDR10I025: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.