Velarion Records

The 340B register and hospital finances — joined, watched daily, delivered.

EPA · discharge permits by city

Discharge permits in Lenore, Idaho

Permits

Major dischargers first. Permits are placed by the address on the permit, which is the operation’s own, not the outfall’s.

Permit holderNPDES IDProgramDischargerReceiving water
CHERRYLANE BRIDGE REPLACEMENTIDR10I022Construction stormwaterMinorRattlesnake Canyon-Clearwater River
CHERRYLANE BRIDGE REPLACEMENTIDR10I023Construction stormwaterMinorRattlesnake Canyon-Clearwater River
CHERRYLANE BRIDGE REPLACEMENTIDR10I025Construction stormwaterMinorRattlesnake Canyon-Clearwater River
NEZ PERCE TRIBAL HATCHERYIDR10I03BConstruction stormwaterMinorRattlesnake Canyon-Clearwater River
SUNNYSIDE BENCH SUBDIVISIONIDR10I034Construction stormwaterMinorWheeler Canyon-Clearwater River