NPDES IDR10I023 · Clean Water Act
CHERRYLANE BRIDGE REPLACEMENT, Lenore, ID: NPDES IDR10I023 discharge permit, effluent exceedances, inspections, penalties
CHERRYLANE BRIDGE REPLACEMENT, Lenore, Idaho: General permit coverage IDR10I023, held by Cascade Bridge, LLC; Construction stormwater; Administratively continued; issued April 1, 2021, term to February 15, 2022, by U.S. EPA.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 262 were issued before IDR10I023.
Coverages issued nearest IDR10I023
- 2021-03-30: SAGEWOOD WEST SUBDIVISION, Meridian: IDR10031G, held by Conger Management Gruop
- 2021-03-30: WHITEHURST SUBDIVISION NO. 1, Eagle: IDR10031I, held by Conger Management Group
- 2021-03-30: EAST RIDGE SUBDIVISION NO. 2 & 3, Meridian: IDR10031J, held by Conger Management Group
- 2021-03-30: CHERRYLANE BRIDGE REPLACEMENT, Lenore: IDR10I022, held by Nez Perce County
- 2021-04-01: MALASPINA RANCH SUBDIVISION, Kuna: IDR10031T, held by Conger Management Group
- 2021-04-02: PINE 43 - PAD 'E' RETAIL SHOPS, Meridian: IDR10031X, held by DRB Investments LLC
- 2021-04-02: MODERN CRAFTSMAN AT BLACK CAT, Meridian: IDR10031Z, held by Engineered Structures, Inc.
- 2021-04-02: SPRING HOLLOW RANCH SUBDIVISION NO. 2, Nampa: IDR100323, held by Challenger Development, Inc.
- 2021-04-02: BOULDER HEIGHTS ESTATES LOTS, Boise: IDR100325, held by Biltmore Company
- 2021-04-12: US-95, LITTLE SALMON RV BR, New Meadows: IDR10032H, held by Idaho Transportation Department
CHERRYLANE BRIDGE REPLACEMENT among its neighbors
5 discharge permits are in the Rattlesnake Canyon-Clearwater River subwatershed (HUC 170603061305); IDR10I023 is one.
Other permits in the Rattlesnake Canyon-Clearwater River subwatershed (HUC 170603061305)
- CHERRYLANE BRIDGE REPLACEMENT, Lenore: IDR10I022, minor, term to 2022-02-15
- CHERRYLANE BRIDGE REPLACEMENT, Lenore: IDR10I025, minor, term to 2022-02-15
- NEZ PERCE TRIBAL HATCHERY, Juliaetta: IDG133005, minor, term to 2024-11-30
- NEZ PERCE TRIBAL HATCHERY, Lenore: IDR10I03B, minor, term to 2027-02-16
What stands out
- Its term runs 320 days, April 1, 2021 to February 15, 2022; the term ended 1,702 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | CHERRYLANE BRIDGE REPLACEMENT |
|---|---|
| Permittee | Cascade Bridge, LLC |
| NPDES ID | IDR10I023 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 1, 2021 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Lenore, ID 83541 |
| Subwatershed | Rattlesnake Canyon-Clearwater River (HUC 170603061305) |
NPDES IDR10I023: effluent limits and exceedances
CHERRYLANE BRIDGE REPLACEMENT (NPDES IDR10I023): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10I023: no pollutant row on file.
NPDES IDR10I023: inspections, violations and enforcement
NPDES IDR10I023 (CHERRYLANE BRIDGE REPLACEMENT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10I023
NPDES IDR10I023: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10I023
NPDES IDR10I023: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.