NPDES AZR10I0V3 · Clean Water Act
NA-17-W26 GALLUP FAILED SEPTIC - SOUTHWARD, Red Rock, NM: NPDES AZR10I0V3 discharge permit, effluent exceedances, inspections, penalties
NA-17-W26 GALLUP FAILED SEPTIC - SOUTHWARD, Red Rock, New Mexico: General permit coverage AZR10I0V3, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY; Construction stormwater; Effective; issued July 29, 2022, term to February 16, 2027, by U.S. EPA.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 873 were issued before AZR10I0V3. NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY holds 131 permits in New Mexico.
Other permits held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- NA-13-Z89/Z90 NAVAJO GALLUP WATER SUPPLY PROJECT REACH 14.1 AND 14.2, Churchrock: AZR10I01Y, issued 2017-05-17
- NA-17-F58 FFO HOUSING SCATTERED XI, Nageezi: AZR10I0A3, issued 2018-07-02
- NA-17-W20 SHIPROCK NORTH LIFT STATION REPLACEMENT, Shiprock: AZR10I0KC, issued 2020-04-08
- NA-18-U67 RAMAH WHITEROCK UNIT ONE CISTERNS, Mountain View: AZR10I0LE, issued 2020-08-25
- NA-18-W59 WHITEROCK SOUTH WATERLINE EXTENSION, Whiterock: AZR10I0LF, issued 2020-08-25
- NA-17-U21/X09: BURNHAM HUNTER WASH WATERLINE EXTENSION, Burnham: AZR10I0M5, issued 2020-10-29
- NA-19-F96 FFO HOUSING SCATTERED XIII, Nageezi: AZR10I0O9, issued 2021-04-28
- C014524 PROJECT # N11 (1A) 1,2&4 MARIANO LAKE, NEW MEXICO: NECA 1416, Mariano Lake: AZR10I0OA, issued 2021-04-28
- THOREAU WELL CONNECTION PROJECT: NECA 1413, Thoreau: AZR10I0OM, issued 2021-05-26
- NA-19-F94 SHIPROCK EAST SCATTERED XVII, Shiprock: AZR10I0OR, issued 2021-06-01
Coverages issued nearest AZR10I0V3
- 2022-07-27: KILGORE AVENUE PH IV PAVEMENT RECONSTRUCTION, Portales: NMR1004XU, held by Constructors Inc
- 2022-07-28: GALLUP FAILED SEPTIC - SOUTHWARD (W26), Gallup: AZR10I0V2, held by Navajo Area Indian Health Service
- 2022-07-28: CHAMPION XPRESS CAR WASH RIO RANCHO, Rio Rancho: NMR1004XY, held by 7B Building & Development
- 2022-07-28: MULTIPLE SINGLE FAMILY HOMES (17) IN RED HAWK ESTATES PHASE 1, Las Cruces: NMR1004XZ, held by Veloz Homes
- 2022-07-28: KILGORE AVENUE PH IV PAVEMENT REHAB, Portales: NMR1004Y0, held by City of Portales
- 2022-07-29: ARROYOS AT SETTLERS PASS SUBDIVISION - PHASE I, Las Cruces: NMR1004Y1, held by Renegade Construction, LLC
- 2022-07-29: DIAL RESIDENCE, Santa Fe: NMR1004Y2, held by PARKS CONSTRUCTION MANAGEMENT SERVICES, LLC
- 2022-07-29: RAINBOW SUBDIVISION, Rio Rancho: NMR1004Y8, held by PULTE HOMES OF NEW MEXICO
- 2022-08-02: 2101, 2105, 2109, 2113, 2117 EUCALYPTUS RD. RESIDENTIAL DEVELOPMENT, Rio Rancho: NMR1004YJ, held by Kreativ Acquisitions, LLC
- 2022-08-02: JICARILLA BATTERY ENERGY STORAGE SYSTEM (BESS), Dulce: NMR10I079, held by SunGrid Solutions Corp
NA-17-W26 GALLUP FAILED SEPTIC - SOUTHWARD among its neighbors
23 discharge permits are in the Church Rock-South Fork Puerco River subwatershed (HUC 150200060105); AZR10I0V3 is one.
Other permits in the Church Rock-South Fork Puerco River subwatershed (HUC 150200060105)
- CHURCH ROCK COAL MINE SCATTERED (U48/XS2), Church Rock: AZR10I0QZ, minor, term to 2022-02-15
- CHURCH ROCK SCATTERED HOUSING 2019, Church Rock: AZR10I0QY, minor, term to 2022-02-15
- CHURCHROCK GLOVE FACTORY PHASE II: PROJECT 3019, Churchrock: AZR10I127, minor, term to 2027-02-16
- CN 6101151, Rehoboth: NMR1007NT, minor, term to 2027-02-16
- CN6101151 MCKINLEY COUNTY, Rehoboth: NMR1007NM, minor, term to 2027-02-16
- CN6101291 MCKINLEY CTY NM118, Rehoboth: AZR10I1AG, minor, term to 2027-02-16
- CN6101291 NM 118 MP 25.811 TO 29.827, Rehoboth: AZR10I1AX, minor, term to 2027-02-16
- FIRE ROCK NAVAJO CASINO, Church Rock: NNF001002
- GALLUP EAST SCATTERED HOUSING 2022, Church Rock: AZR10I1GH, minor, term to 2027-02-16
- GALLUP FAILED SEPTICS-CENTRAL (XM3), Church Rock: NMR10I00S, minor, term to 2022-02-15
Identity
| Facility | NA-17-W26 GALLUP FAILED SEPTIC - SOUTHWARD |
|---|---|
| Permittee | NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY |
| NPDES ID | AZR10I0V3 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 29, 2022 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Red Rock, NM 87301 |
| Subwatershed | Church Rock-South Fork Puerco River (HUC 150200060105) |
NPDES AZR10I0V3: effluent limits and exceedances
NA-17-W26 GALLUP FAILED SEPTIC - SOUTHWARD (NPDES AZR10I0V3): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZR10I0V3: no pollutant row on file.
NPDES AZR10I0V3: inspections, violations and enforcement
NPDES AZR10I0V3 (NA-17-W26 GALLUP FAILED SEPTIC - SOUTHWARD): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZR10I0V3
NPDES AZR10I0V3: one email when its EPA record changes — $99/month.
Permits near NPDES AZR10I0V3
NPDES AZR10I0V3: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.