NPDES AZR10I16T · Clean Water Act
NA-21-LJ1: MEXICAN SPRINGS, TODILTO PARK CISTERNS, Navajo, NM: NPDES AZR10I16T discharge permit, effluent exceedances, inspections, penalties
NA-21-LJ1: MEXICAN SPRINGS, TODILTO PARK CISTERNS, Navajo, New Mexico: General permit coverage AZR10I16T, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY; Construction stormwater; Effective; issued July 31, 2024, term to February 16, 2027, by U.S. EPA.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 1,965 were issued before AZR10I16T. NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY holds 131 permits in New Mexico.
Other permits held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- NA-13-Z89/Z90 NAVAJO GALLUP WATER SUPPLY PROJECT REACH 14.1 AND 14.2, Churchrock: AZR10I01Y, issued 2017-05-17
- NA-17-F58 FFO HOUSING SCATTERED XI, Nageezi: AZR10I0A3, issued 2018-07-02
- NA-17-W20 SHIPROCK NORTH LIFT STATION REPLACEMENT, Shiprock: AZR10I0KC, issued 2020-04-08
- NA-18-U67 RAMAH WHITEROCK UNIT ONE CISTERNS, Mountain View: AZR10I0LE, issued 2020-08-25
- NA-18-W59 WHITEROCK SOUTH WATERLINE EXTENSION, Whiterock: AZR10I0LF, issued 2020-08-25
- NA-17-U21/X09: BURNHAM HUNTER WASH WATERLINE EXTENSION, Burnham: AZR10I0M5, issued 2020-10-29
- NA-19-F96 FFO HOUSING SCATTERED XIII, Nageezi: AZR10I0O9, issued 2021-04-28
- C014524 PROJECT # N11 (1A) 1,2&4 MARIANO LAKE, NEW MEXICO: NECA 1416, Mariano Lake: AZR10I0OA, issued 2021-04-28
- THOREAU WELL CONNECTION PROJECT: NECA 1413, Thoreau: AZR10I0OM, issued 2021-05-26
- NA-19-F94 SHIPROCK EAST SCATTERED XVII, Shiprock: AZR10I0OR, issued 2021-06-01
Coverages issued nearest AZR10I16T
- 2024-07-30: KIRTLAND FEDERAL CREDIT UNION, Albuquerque: NMR1006KP, held by KIRTLAND CREDIT UNION
- 2024-07-30: ST. PIUS X ALUMNI PLAZA, Albuquerque: NMR1006KR, held by St. Pius Real Estate Corp.
- 2024-07-30: TA-15 PROTOSTAR PHASE III, Los Alamos: NMR1006KT, held by Triad National Security, LLC
- 2024-07-30: TA-48 INSTITUTIONAL LAYDOWN AREA, Los Alamos: NMR1006KU, held by Triad National Security, LLC
- 2024-07-30: SWIFT STOP CONVENIENCE STORE, Hobbs: NMR1006KV, held by Scott Collier Construction, LLC
- 2024-07-31: THE VILLAGE AT LAS CAMPANAS, Santa Fe: NMR1006KY, held by Blueline Construction, Inc.
- 2024-07-31: NOR-LEA HOSPITAL DISTRICT PPC ADDITION, Lovington: NMR1006L0, held by Robins & Morton
- 2024-08-01: PNM SOIL EX SITE, Water Flow Nm: NMR1006L4, held by IronHourse Trucking LLc
- 2024-08-01: CITY OF ALAMOGORDO GRIGGS AND PUBLIC WORKS DRAINAGE BASINS SEDIMENT REMOVAL, Alamogordo: NMR1006L6, held by Crosstown Construction
- 2024-08-02: LPG-12 AND LPG-14 & 15, Encino: NMR1006L7, held by Sparling Construction
NA-21-LJ1: MEXICAN SPRINGS, TODILTO PARK CISTERNS among its neighbors
37 discharge permits are in the Dye Brush Wash subwatershed (HUC 140801061002); AZR10I16T is one.
Other permits in the Dye Brush Wash subwatershed (HUC 140801061002)
- COYOTE CANYON WEST SCATTERED HOMES: NA-22-LL6, Coyote Canyon: AZR10I1FA, minor, term to 2027-02-16
- GALLUP NORTH SCATTERED: NA-21-G27, Twin Lakes: AZR10I1GB, minor, term to 2027-02-16
- GALLUP SCATTERED NORTH 2020: NA-20-G16, Twin Lakes: AZR10I14B, minor, term to 2027-02-16
- GALLUP SOUTH SCATTERED HOUSING 2022: NA-22-G31, Bread Springs: AZR10I163, minor, term to 2027-02-16
- NA-16-T93 TWIN LAKES ROUTE 9 SCATTERED, Twin Lakes: AZR10I1F3, minor, term to 2027-02-16
- NA-18-F83 HAYSTACK-IYANBITO-THOREAU-BACA SCATTERED HOUSING 2018, Thoreau: AZR10I12R, minor, term to 2027-02-16
- NA-18-F85, GALLUP DISTRICT-WIDE SCATTERED HOUSING 2018, Gallup: AZR10I0MH, minor, term to 2022-02-15
- NA-18-U42/XR5 TWIN LAKES-MEXICAN SPRINGS-TOHATCHI SCATTERED, Tohatchi: AZR10I0U9, minor, term to 2027-02-16
- NA-19-F98 BACA-BREADSPRINGS-IYANBITO-THOREAU SCATTERED HOUSING 2019, Churchrock: AZR10I12Q, minor, term to 2027-02-16
- NA-19-U77 - TWIN LAKES BLK CRK & RTE 30 SCATTERED, Gallup: AZR10I0Z3, minor, term to 2027-02-16
What stands out
- Its term runs 2 years and 200 days, July 31, 2024 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NA-21-LJ1: MEXICAN SPRINGS, TODILTO PARK CISTERNS |
|---|---|
| Permittee | NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY |
| NPDES ID | AZR10I16T |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 31, 2024 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Navajo, NM 87238 |
| Subwatershed | Dye Brush Wash (HUC 140801061002) |
NPDES AZR10I16T: effluent limits and exceedances
NA-21-LJ1: MEXICAN SPRINGS, TODILTO PARK CISTERNS (NPDES AZR10I16T): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZR10I16T: no pollutant row on file.
NPDES AZR10I16T: inspections, violations and enforcement
NPDES AZR10I16T (NA-21-LJ1: MEXICAN SPRINGS, TODILTO PARK CISTERNS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZR10I16T
NPDES AZR10I16T: one email when its EPA record changes — $99/month.
Permits near NPDES AZR10I16T
NPDES AZR10I16T: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.