NPDES NMR1001MG · Clean Water Act
SOUTHEAST COLLECTION PROJECT PHASE II DA MDWCA, Las Cruces, NM: NPDES NMR1001MG discharge permit, effluent exceedances, inspections, penalties
SOUTHEAST COLLECTION PROJECT PHASE II DA MDWCA, Las Cruces, New Mexico: General permit coverage NMR1001MG, held by Smithco Construction, Inc.; Construction stormwater; Not needed.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file. Smithco Construction, Inc. holds 15 permits in New Mexico.
Other permits held by Smithco Construction, Inc.
- ANAPRA STORMWATER PUMP STATION IMPROVEMENTS PHASE 1, Sunland Park: NMR1001QW
- CUCHILLO NEGRO ARROYO BANK STABILIZATION, Truth Or Consequences: NMR1002SG
- CHAMBERINO MDWC & SA WATER SYSTEM IMPROVEMENTS, Chamberino: NMR10034T, issued 2020-07-27
- LIFT STATION 16 WASTEWATER SYSTEM IMPROVEMENTS - PROJECT 2 SMITHCO, Mesilla Park: NMR1004N8, issued 2022-04-14
- MESQUITE-BRAZITO WASTEWATER SYSTEM: LIFT 12 IMPROVEMENTS, Mesilla Park: NMR1004RE, issued 2022-05-25
- BONITO LAKE INFRASTRUCTURE IMPROVEMENTS, Nogal: NMR1004US, issued 2022-06-21
- MESQUITE-BRAZITO WASTEWATER SYSTEM: LIFT 11 IMPROVEMENTS CONTRACTOR, Mesquite: NMR1004WT, issued 2022-07-14
- CASA ADOBES MDWCA USDA/RD 2020 WATER SYSTEM IMPROVEMENTS, Mimbres: NMR1005WQ, issued 2023-10-05
- CHAPARRAL WASTEWATER COLLECTION IMPROVEMENTS PHASE 2C, Chaparral: NMR1006Y2, issued 2025-01-23
- WILLIAMSBURG WATEWATER SYSTEM IMPROVEMENTS, Williamsburg: NMR10071I
SOUTHEAST COLLECTION PROJECT PHASE II DA MDWCA among its neighbors
150 discharge permits are in the Alameda Arroyo-Rio Grande subwatershed (HUC 130301020608); NMR1001MG is one.
Other permits in the Alameda Arroyo-Rio Grande subwatershed (HUC 130301020608)
- 10 SINGLE FAMILY HOMES - LENOX NORTH SUBDIVISION, Las Cruces: NMR1004HN, minor, term to 2022-02-15
- 1314 CASSATT PLACE, Las Cruces: NMR1006Y0, minor, term to 2027-02-16
- 1325 ESTANCIA REAL SFH, Las Cruces: NMR1005F4, minor, term to 2027-02-16
- 1383 LENOX - SINGLE FAMILY RESIDENCE, Las Cruces: NMR1004HD
- 2021-2022 PAVEMENT REPLACEMENT - PHASE 1, Las Cruces: NMR1004HT, minor, term to 2022-02-15
- 2021-2022 PAVEMENT REPLACEMENT-PHASE 1, Las Cruces: NMR1004HP, minor, term to 2022-02-15
- 2830 CALLE DE POMPEII, Las Cruces: NMR10059M, minor, term to 2027-02-16
- 3 BLDG ADDITION TO MIRANDA APARTMENTS, Las Cruces: NMR1006LR, minor, term to 2027-02-16
- 4 LOW PRESSURE GAS LINE, Las Cruces: NMR1000Z0
- 4045 W PICACHO, Las Cruces: NMR1004KJ, minor, term to 2027-02-16
Identity
| Facility | SOUTHEAST COLLECTION PROJECT PHASE II DA MDWCA |
|---|---|
| Permittee | Smithco Construction, Inc. |
| NPDES ID | NMR1001MG |
| Status | Not needed |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Address | Las Cruces, NM 88007 |
| Subwatershed | Alameda Arroyo-Rio Grande (HUC 130301020608) |
NPDES NMR1001MG: effluent limits and exceedances
SOUTHEAST COLLECTION PROJECT PHASE II DA MDWCA (NPDES NMR1001MG): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES NMR1001MG: no pollutant row on file.
NPDES NMR1001MG: inspections, violations and enforcement
NPDES NMR1001MG (SOUTHEAST COLLECTION PROJECT PHASE II DA MDWCA): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES NMR1001MG
NPDES NMR1001MG: one email when its EPA record changes — $99/month.
Permits near NPDES NMR1001MG
NPDES NMR1001MG: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.