NPDES NMR1002SG · Clean Water Act
CUCHILLO NEGRO ARROYO BANK STABILIZATION, Truth Or Consequences, NM: NPDES NMR1002SG discharge permit, effluent exceedances, inspections, penalties
CUCHILLO NEGRO ARROYO BANK STABILIZATION, Truth Or Consequences, New Mexico: General permit coverage NMR1002SG, held by Smithco Construction, Inc.; Construction stormwater; Not needed.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file. Smithco Construction, Inc. holds 15 permits in New Mexico.
Other permits held by Smithco Construction, Inc.
- SOUTHEAST COLLECTION PROJECT PHASE II DA MDWCA, Las Cruces: NMR1001MG
- ANAPRA STORMWATER PUMP STATION IMPROVEMENTS PHASE 1, Sunland Park: NMR1001QW
- CHAMBERINO MDWC & SA WATER SYSTEM IMPROVEMENTS, Chamberino: NMR10034T, issued 2020-07-27
- LIFT STATION 16 WASTEWATER SYSTEM IMPROVEMENTS - PROJECT 2 SMITHCO, Mesilla Park: NMR1004N8, issued 2022-04-14
- MESQUITE-BRAZITO WASTEWATER SYSTEM: LIFT 12 IMPROVEMENTS, Mesilla Park: NMR1004RE, issued 2022-05-25
- BONITO LAKE INFRASTRUCTURE IMPROVEMENTS, Nogal: NMR1004US, issued 2022-06-21
- MESQUITE-BRAZITO WASTEWATER SYSTEM: LIFT 11 IMPROVEMENTS CONTRACTOR, Mesquite: NMR1004WT, issued 2022-07-14
- CASA ADOBES MDWCA USDA/RD 2020 WATER SYSTEM IMPROVEMENTS, Mimbres: NMR1005WQ, issued 2023-10-05
- CHAPARRAL WASTEWATER COLLECTION IMPROVEMENTS PHASE 2C, Chaparral: NMR1006Y2, issued 2025-01-23
- WILLIAMSBURG WATEWATER SYSTEM IMPROVEMENTS, Williamsburg: NMR10071I
CUCHILLO NEGRO ARROYO BANK STABILIZATION among its neighbors
1 discharge permits are in the Yaple Canyon-Cuchillo Negro Creek subwatershed (HUC 130301010110); NMR1002SG is one.
What stands out
- No dated event in the 365 days to September 15, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater.
Identity
| Facility | CUCHILLO NEGRO ARROYO BANK STABILIZATION |
|---|---|
| Permittee | Smithco Construction, Inc. |
| NPDES ID | NMR1002SG |
| Status | Not needed |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Address | Truth Or Consequences, NM 87901 |
| Subwatershed | Yaple Canyon-Cuchillo Negro Creek (HUC 130301010110) |
NPDES NMR1002SG: effluent limits and exceedances
CUCHILLO NEGRO ARROYO BANK STABILIZATION (NPDES NMR1002SG): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES NMR1002SG: no pollutant row on file.
NPDES NMR1002SG: inspections, violations and enforcement
NPDES NMR1002SG (CUCHILLO NEGRO ARROYO BANK STABILIZATION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES NMR1002SG
NPDES NMR1002SG: one email when its EPA record changes — $99/month.
Permits near NPDES NMR1002SG
NPDES NMR1002SG: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.