NPDES NMR1001QW · Clean Water Act
ANAPRA STORMWATER PUMP STATION IMPROVEMENTS PHASE 1, Sunland Park, NM: NPDES NMR1001QW discharge permit, effluent exceedances, inspections, penalties
ANAPRA STORMWATER PUMP STATION IMPROVEMENTS PHASE 1, Sunland Park, New Mexico: General permit coverage NMR1001QW, held by Smithco Construction, Inc.; Construction stormwater; Not needed.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file. Smithco Construction, Inc. holds 15 permits in New Mexico.
Other permits held by Smithco Construction, Inc.
- SOUTHEAST COLLECTION PROJECT PHASE II DA MDWCA, Las Cruces: NMR1001MG
- CUCHILLO NEGRO ARROYO BANK STABILIZATION, Truth Or Consequences: NMR1002SG
- CHAMBERINO MDWC & SA WATER SYSTEM IMPROVEMENTS, Chamberino: NMR10034T, issued 2020-07-27
- LIFT STATION 16 WASTEWATER SYSTEM IMPROVEMENTS - PROJECT 2 SMITHCO, Mesilla Park: NMR1004N8, issued 2022-04-14
- MESQUITE-BRAZITO WASTEWATER SYSTEM: LIFT 12 IMPROVEMENTS, Mesilla Park: NMR1004RE, issued 2022-05-25
- BONITO LAKE INFRASTRUCTURE IMPROVEMENTS, Nogal: NMR1004US, issued 2022-06-21
- MESQUITE-BRAZITO WASTEWATER SYSTEM: LIFT 11 IMPROVEMENTS CONTRACTOR, Mesquite: NMR1004WT, issued 2022-07-14
- CASA ADOBES MDWCA USDA/RD 2020 WATER SYSTEM IMPROVEMENTS, Mimbres: NMR1005WQ, issued 2023-10-05
- CHAPARRAL WASTEWATER COLLECTION IMPROVEMENTS PHASE 2C, Chaparral: NMR1006Y2, issued 2025-01-23
- WILLIAMSBURG WATEWATER SYSTEM IMPROVEMENTS, Williamsburg: NMR10071I
ANAPRA STORMWATER PUMP STATION IMPROVEMENTS PHASE 1 among its neighbors
25 discharge permits are in the Coronado Hills-Rio Grande subwatershed (HUC 130301020906); NMR1001QW is one.
Other permits in the Coronado Hills-Rio Grande subwatershed (HUC 130301020906)
- 600 AGAVE CANYON COURT, El Paso: TXR1533YZ, minor, term to 2028-03-04
- ANAPRA PHASE II ROADWAY, Sunland Park: NMR1005BZ, minor, term to 2027-02-16
- ASARCO EL PASO, El Paso: TXR05FF17, minor, term to 2026-08-13
- CALLE MORROCO INFRASTRUCTURE IMPROVEMENTS, Sunland Park: NMR1006QK, minor, term to 2027-02-16
- CAMINO REAL LANDFILL, Sunland Park: NMR05GB87
- CAMINO REAL REGIONAL UTILITY AUTHORITY, Sunland Park: NML029483, minor, term to 2025-12-31
- CITY OF EL PASO - NORTHWEST CORRAL 5, El Paso: TXR05FE21, minor, term to 2026-08-13
- CITY OF SUNLAND PARK (NMR04E003), Sunland Park: NMR04E003
- COLLECTORS AND ABOVE STREET RESURFACING, El Paso: TXR1564PK, minor, term to 2028-03-04
- EL PASO WATER UTILITIES NORTHWEST WWTP, El Paso: TXR1515TN, minor, term to 2028-03-04
Identity
| Facility | ANAPRA STORMWATER PUMP STATION IMPROVEMENTS PHASE 1 |
|---|---|
| Permittee | Smithco Construction, Inc. |
| NPDES ID | NMR1001QW |
| Status | Not needed |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Address | Sunland Park, NM 88063 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Coronado Hills-Rio Grande (HUC 130301020906) |
NPDES NMR1001QW: effluent limits and exceedances
ANAPRA STORMWATER PUMP STATION IMPROVEMENTS PHASE 1 (NPDES NMR1001QW): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES NMR1001QW: no pollutant row on file.
NPDES NMR1001QW: inspections, violations and enforcement
NPDES NMR1001QW (ANAPRA STORMWATER PUMP STATION IMPROVEMENTS PHASE 1): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES NMR1001QW
NPDES NMR1001QW: one email when its EPA record changes — $99/month.
Permits near NPDES NMR1001QW
NPDES NMR1001QW: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.