NPDES SDR10P5A2 · Clean Water Act
BRANDON CORE AREA RECONSTRUCTION, PHASE 2B, Brandon, SD: NPDES SDR10P5A2 discharge permit, effluent exceedances, inspections, penalties
BRANDON CORE AREA RECONSTRUCTION, PHASE 2B, Brandon, South Dakota: General permit coverage SDR10P5A2, held by City of Brandon; Construction stormwater; Effective; issued August 13, 2024, term to October 31, 2028, by SDDANR.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 629 were issued before SDR10P5A2. City of Brandon holds 4 permits in South Dakota.
Other permits held by City of Brandon
- BRANDON WTP EXPANSION, Brandon: SDR10K836, issued 2022-09-12
- RUSHMORE AREA RECONSTRUCTION - PHASE 2, Brandon: SDR10K957
- SD 11/I-90 EXIT 406 WATER MAIN AND SANITARY SEWER, Brandon: SDR10P5A3, issued 2024-08-13
Coverages issued nearest SDR10P5A2
- 2024-08-06: FAIRBURN WATER SOURCE PROJECT, Oral: SDR10P56F, held by Fall River Water Users District
- 2024-08-06: SIOUX FALLS SD 32ND & ELLIS, Sioux Falls: SDR10P56G, held by Holiday Stationstores, LLC, a Minnesota limited liability company
- 2024-08-06: WASTEWATER TREATMENT FACILITY IMPROVEMENTS, Watertown: SDR10P5AK, held by Rice Lake
- 2024-08-07: B-21 FUELS SYSTEM MAINTENANCE DOCK, Ellsworth Afb: SDR10P5AS, held by Conti Federal
- 2024-08-13: EAST SIDE SANITARY SEWER EXTENSION, Brandon: SDR10P5A1, held by City of Brandon, SD
- 2024-08-13: SD 11/I-90 EXIT 406 WATER MAIN AND SANITARY SEWER, Brandon: SDR10P5A3, held by City of Brandon
- 2024-08-13: BIG SIOUX RECREATION OUTLET IMPROVEMENT, Brandon: SDR10P5A4, held by LT Companies Inc dba Parkway Construction
- 2024-08-13: BASIN 15 SANITARY SEWER, PHASE 2A & PHASE 2B EXTENSION, Sioux Falls: SDR10P5B1, held by City of Sioux Falls
- 2024-08-13: TRIPP COUNTY WATER DISTRICT SYSTEM IMPROVEMENTS, Wood: SDR10P5B7, held by Northern Plains, LLC
- 2024-08-15: RICE COMPANIES BUILDING 2024, Sioux Falls: SDR10P5B3, held by Rice Companies
BRANDON CORE AREA RECONSTRUCTION, PHASE 2B among its neighbors
97 discharge permits are in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705); SDR10P5A2 is one.
Other permits in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705)
- 2025 CINDER AND LIME SLURRY PONDS CLOSURE BY REMOVAL, Sioux Falls: SDR10P5PU, minor, term to 2028-10-31
- ALIBI BAR, Sioux Falls: SDR10K703, minor, term to 2023-03-31
- ARROWHEAD PARKWAY PHASE 2B @ VETERANS PARKWAY, Sioux Falls: SDR10P5ET, minor, term to 2028-10-31
- ASPEN HARBOR ADDITION, Brandon: SDR10I075, minor, term to 2023-03-31
- BIG SIOUX RECREATION OUTLET IMPROVEMENT, Brandon: SDR10P5A4, minor, term to 2028-10-31
- BRANDON WTP EXPANSION, Brandon: SDR10K836, minor, term to 2023-03-31
- BRANDON, CITY OF (WTP), Brandon: SDG860074, minor, term to 2021-09-30
- BURNSFIELD ADDITION, Sioux Falls: SDR10K395, minor, term to 2023-03-31
- BURWELL SITE, Sioux Falls: SDR10K864, minor, term to 2023-03-31
- BYRE APARTMENTS, Sioux Falls: SDR10K078, minor, term to 2023-03-31
What stands out
- Its term runs 4 years and 79 days, August 13, 2024 to October 31, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | BRANDON CORE AREA RECONSTRUCTION, PHASE 2B |
|---|---|
| Permittee | City of Brandon |
| NPDES ID | SDR10P5A2 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 13, 2024 |
| Expires | October 31, 2028 |
| Agency | SDDANR |
| Address | Brandon, SD 57005 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Cactus Hills-Big Sioux River (HUC 101702031705) |
NPDES SDR10P5A2: effluent limits and exceedances
BRANDON CORE AREA RECONSTRUCTION, PHASE 2B (NPDES SDR10P5A2): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10P5A2: no pollutant row on file.
NPDES SDR10P5A2: inspections, violations and enforcement
NPDES SDR10P5A2 (BRANDON CORE AREA RECONSTRUCTION, PHASE 2B): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10P5A2
NPDES SDR10P5A2: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10P5A2
NPDES SDR10P5A2: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.