BRANDON CORE AREA RECONSTRUCTION, PHASE 2B, Brandon, SD: NPDES SDR10P5A2 discharge permit, effluent exceedances, inspections, penalties

BRANDON CORE AREA RECONSTRUCTION, PHASE 2B, Brandon, South Dakota: General permit coverage SDR10P5A2, held by City of Brandon; Construction stormwater; Effective; issued August 13, 2024, term to October 31, 2028, by SDDANR.

South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 629 were issued before SDR10P5A2. City of Brandon holds 4 permits in South Dakota.

Other permits held by City of Brandon

Coverages issued nearest SDR10P5A2

BRANDON CORE AREA RECONSTRUCTION, PHASE 2B among its neighbors

97 discharge permits are in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705); SDR10P5A2 is one.

Other permits in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705)

What stands out

  • Its term runs 4 years and 79 days, August 13, 2024 to October 31, 2028.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityBRANDON CORE AREA RECONSTRUCTION, PHASE 2B
PermitteeCity of Brandon
NPDES IDSDR10P5A2
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedAugust 13, 2024
ExpiresOctober 31, 2028
AgencySDDANR
AddressBrandon, SD 57005
Receiving water impaired303(D) Listed
SubwatershedCactus Hills-Big Sioux River (HUC 101702031705)

NPDES SDR10P5A2: effluent limits and exceedances

BRANDON CORE AREA RECONSTRUCTION, PHASE 2B (NPDES SDR10P5A2): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES SDR10P5A2: no pollutant row on file.

NPDES SDR10P5A2: inspections, violations and enforcement

NPDES SDR10P5A2 (BRANDON CORE AREA RECONSTRUCTION, PHASE 2B): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES SDR10P5A2

NPDES SDR10P5A2: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES SDR10P5A2

NPDES SDR10P5A2: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.