Every permit’s record in Eielson Afb

Each of the 24 current permits in Eielson Afb has a record page: every permit in Eielson Afb, A to Z.

Permits

Major dischargers first. Permits are placed by the address on the permit, which is the operation’s own, not the outfall’s.

Permit holderNPDES IDProgramDischargerReceiving waterStatus and term
B1171 FUEL CELL REPAIRAKR10H0QTConstruction stormwaterMinorAdministratively continued, 2025-01-29 to 2026-01-31
EIE 391 CATM RANGEAKR10GP04Construction stormwaterMinorFrench Creek; WetlandsEffective, 2022-01-18 to 2026-01-31
EIE391 CATM RANGEAKR10GP20Construction stormwaterMinorEffective, 2023-01-05 to 2026-01-31
EIE429 REPAIR MOOSE LAKE UTILITIES, PHASE DAKR10GP60Construction stormwaterMinorWetlandsEffective, 2022-03-23 to 2026-01-31
EIE429 REPAIR MOOSE LAKE UTILITIES, PHASE D_2AKR10GQ41Construction stormwaterMinorEffective, 2023-09-07 to 2026-01-31
EIE430 REPAIR FIRE PROTECTIONS SYSTEMS IN HANGAR (B1348)AKR10H0QHConstruction stormwaterMinorEffective, 2026-02-02 to 2031-01-31
EIE430 REPAIR FIRE PROTECTIONS SYSTEMS IN HANGAR (B1348)AKR10H0QEConstruction stormwaterMinorAdministratively continued, 2025-02-12 to 2026-01-31
EIE431 CONVENTIONAL MUNITIONS FACILITYAKR10GE35Construction stormwaterMinorTanana RiverEffective, 2021-03-25 to 2026-01-31
EIE431 CONVENTIONAL MUNITIONS FACILITY_2AKR10GE31Construction stormwaterMinorTanana River; Yukon RiverEffective, 2021-03-26 to 2026-01-31
EIE436 AME STORAGE FACILITYAKG002232MinorEffective, 2021-12-27 to 2026-12-27
EIE436 F35 AME STORAGE FACILITYAKR10GO85Construction stormwaterMinorEffective, 2022-08-19 to 2026-01-31
EIE436 F35 AME STORAGE FACILITY_2AKR10GP61Construction stormwaterMinorEffective, 2023-12-18 to 2026-01-31
EIE443 TURBINE GENERATOR REPLACEMENTAKR10GP49Construction stormwaterMinorEffective, 2022-11-04 to 2026-01-31
EIE443 TURBINE GENERATOR REPLACEMENT_2AKR10GQ08Construction stormwaterMinorEffective, 2023-06-23 to 2026-01-31
EIELSON AFBAKG870031MinorEffective, 2026-05-20 to 2027-07-31
EIELSON AFB CENTRAL HEAT AND POWER PLANTAK0001341MinorEffective, 2018-05-15 to 2023-06-30
EIELSON AFB DRINKING WATER TREATMENT PLANT -AIR FORCE BASE-AKG380017MinorAdministratively continued, 2020-06-29 to 2024-07-31
EIELSON AFB LF003 CONTAINMENT CELLS 1 & 2, HOUSING WATERAKG002308MinorAdministratively continued, 2023-09-29 to 2024-09-30
EIELSON AIR FORCE BASEAKR10H0T8Construction stormwaterMinorAdministratively continued, 2025-04-24 to 2026-01-31
EIELSON AIR FORCE BASEAKR06AD14Industrial stormwaterMinorEffective, 2020-11-09 to 2025-03-31
EIELSON AIR FORCE BASEAKR10H02BConstruction stormwaterMinorEffective, 2023-11-16 to 2026-01-31
EIELSON AIR FORCE BASEAKR10H0T9Construction stormwaterMinorAdministratively continued, 2025-04-24 to 2026-01-31
F35 EIELSON SOIL STOCKPILESAKR10GN93Construction stormwaterMinorEffective, 2021-08-10 to 2026-01-31
F35 EIELSON SOIL STOCKPILES _2AKR10GO40Construction stormwaterMinorGarrison SloughEffective, 2021-09-13 to 2026-01-31

Other cities in Alaska

What this page shows

This page covers Clean Water Act discharge permits in the EPA NPDES register for EIELSON AFB. It lists 24 permits.