EPA · discharge permits by city
Discharge permits in Sutton, Alaska
- 5Current permits
Permits
Major dischargers first. Permits are placed by the address on the permit, which is the operation’s own, not the outfall’s.
| Permit holder | NPDES ID | Program | Discharger | Receiving water |
|---|---|---|---|---|
| 2012 SOUTHCENTRAL FLOOD REPAIRS 12-66-M_2 | AKR10GL97 | Construction stormwater | Minor | Matanuska River |
| 2012 SOUTHCENTRAL FLOODING REPAIRS 12-66-M | AKR10GK87 | Construction stormwater | Minor | Matanuska River |
| KINGS RIVER BRIDGE | AKR10H067 | Construction stormwater | Minor | Outlet Kings River |
| KINGS RIVER BRIDGE REPLACEMENT | AKR10H031 | Construction stormwater | Minor | Outlet Kings River |
| THORNTON PROPERTY | AKR10H13Y | Construction stormwater | Minor | Pinnacle Mountain-Matanuska River |