EPA · discharge permits by city
Discharge permits in Lighthouse Point, Florida
- 5Current permits
Permits
Major dischargers first. Permits are placed by the address on the permit, which is the operation’s own, not the outfall’s.
| Permit holder | NPDES ID | Program | Discharger | Receiving water |
|---|---|---|---|---|
| LIGHTHOUSE POINT, CITY OF | FLS266345 | Large municipal storm sewer systems | Major | Boca Raton Inlet-Port Everglades |
| BCWWS N.E. 25TH STREET | FLG073417 | Minor | Boca Raton Inlet-Port Everglades | |
| BROWARD HEALTH LIGHTHOUSE POINT FSED AND MOB | FLR20HV54 | Construction stormwater | Minor | Boca Raton Inlet-Port Everglades |
| LIGHTHOUSE POINT CITY HALL | FLR20IH60 | Construction stormwater | Minor | Boca Raton Inlet-Port Everglades |
| NE 22ND AVENUE FORCE MAIN REPLACEMENT | FLR10VC64 | Construction stormwater | Minor | Boca Raton Inlet-Port Everglades |