Velarion Records

EPA · Missouri · discharge permits by parameter

Stream flow, estimated in Missouri

A parameter is the substance or the property EPA writes a numeric limit for, and this page counts the Missouri permits that carry one for Stream flow, estimated: 4 permits, of which 0 have a recorded exceedance. Nationwide the same parameter appears in 69 permits. Each row below is one permit, and it opens the agency’s own record for that permit.

Permits

Permit holderNPDES IDCityProgramDischargerReceiving water
AMEREN MISSOURI - MERAMEC ENERGY CENTERMO0000361ST. LOUISIndustrial stormwaterMajorMississippi River
AMEREN - SIOUX (WEST ALTON ENERGY CTR)MO0000353WEST ALTONIndustrial stormwaterMajorTributary to Brick House Slough
AMOCO,CHARITON RIVER OIL SPILL SITEMO0112526ETHELIndustrial stormwaterMinorLittle Turkey Creek

Other pollutants in Missouri

Stream flow, estimated nationwide

What this page shows

This page covers Clean Water Act discharge permits in MO with limits on the pollutant parameter Stream flow, estimated. There are 4 permits in MO with a limit on this parameter and 3 permits in MO with a recorded violation of this parameter.