NPDES NMR10075H · Clean Water Act
WELL 3 SITE IMPROVEMENTS AND SANTIAGO WAY PRV REPLACEMENT, Rio Rancho, NM: NPDES NMR10075H discharge permit, effluent exceedances, inspections, penalties
WELL 3 SITE IMPROVEMENTS AND SANTIAGO WAY PRV REPLACEMENT, Rio Rancho, New Mexico: General permit coverage NMR10075H, held by Smithco Construction, Inc.; Construction stormwater; Not needed.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file. Smithco Construction, Inc. holds 15 permits in New Mexico.
Other permits held by Smithco Construction, Inc.
- SOUTHEAST COLLECTION PROJECT PHASE II DA MDWCA, Las Cruces: NMR1001MG
- ANAPRA STORMWATER PUMP STATION IMPROVEMENTS PHASE 1, Sunland Park: NMR1001QW
- CUCHILLO NEGRO ARROYO BANK STABILIZATION, Truth Or Consequences: NMR1002SG
- CHAMBERINO MDWC & SA WATER SYSTEM IMPROVEMENTS, Chamberino: NMR10034T, issued 2020-07-27
- LIFT STATION 16 WASTEWATER SYSTEM IMPROVEMENTS - PROJECT 2 SMITHCO, Mesilla Park: NMR1004N8, issued 2022-04-14
- MESQUITE-BRAZITO WASTEWATER SYSTEM: LIFT 12 IMPROVEMENTS, Mesilla Park: NMR1004RE, issued 2022-05-25
- BONITO LAKE INFRASTRUCTURE IMPROVEMENTS, Nogal: NMR1004US, issued 2022-06-21
- MESQUITE-BRAZITO WASTEWATER SYSTEM: LIFT 11 IMPROVEMENTS CONTRACTOR, Mesquite: NMR1004WT, issued 2022-07-14
- CASA ADOBES MDWCA USDA/RD 2020 WATER SYSTEM IMPROVEMENTS, Mimbres: NMR1005WQ, issued 2023-10-05
- CHAPARRAL WASTEWATER COLLECTION IMPROVEMENTS PHASE 2C, Chaparral: NMR1006Y2, issued 2025-01-23
WELL 3 SITE IMPROVEMENTS AND SANTIAGO WAY PRV REPLACEMENT among its neighbors
79 discharge permits are in the Arroyo Venado-Rio Grande subwatershed (HUC 130202030101); NMR10075H is one.
Other permits in the Arroyo Venado-Rio Grande subwatershed (HUC 130202030101)
- 03731-1001 - BERNALILLO, NM - FUEL CENTER, Bernalillo: NMR10073W, minor, term to 2027-02-16
- 35 NORTH SUBDIVISION, Rio Rancho: NMR1001TI
- 455 AVENIDA C DE BACA, Bernalillo: NMR10030G
- 487 PLAZA VINEDOS, Bernalillo: NMR1003IS
- 550 PASEO OFFSITE, Rio Rancho: NMR100574, minor, term to 2027-02-16
- 933 CAMINO VISTA RIO, Bernalillo: NMR1007WQ, minor, term to 2027-02-16
- BERNALILLO COMMERICAL, Bernalillo: NMR15F117
- BERNALILLO MIDDLE SCHOOL AND ELEMEMNTARY SCHOOL RENOVATIONS, Bernalillo: NMR1004OB, minor, term to 2027-02-16
- BOSQUE BREWERY NORTH DRAINAGE BASIN, Bernalillo: NMR100613
- BOSQUE ENCANTADO SUBDIVISION, LOT 31, Bernalillo: NMU001576
What stands out
- No dated event in the 365 days to October 14, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater.
Identity
| Facility | WELL 3 SITE IMPROVEMENTS AND SANTIAGO WAY PRV REPLACEMENT |
|---|---|
| Permittee | Smithco Construction, Inc. |
| NPDES ID | NMR10075H |
| Status | Not needed |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Address | Rio Rancho, NM 87144 |
| Subwatershed | Arroyo Venado-Rio Grande (HUC 130202030101) |
NPDES NMR10075H: effluent limits and exceedances
WELL 3 SITE IMPROVEMENTS AND SANTIAGO WAY PRV REPLACEMENT (NPDES NMR10075H): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES NMR10075H: no pollutant row on file.
NPDES NMR10075H: inspections, violations and enforcement
NPDES NMR10075H (WELL 3 SITE IMPROVEMENTS AND SANTIAGO WAY PRV REPLACEMENT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES NMR10075H
NPDES NMR10075H: one email when its EPA record changes — $99/month.
Permits near NPDES NMR10075H
NPDES NMR10075H: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.