Velarion Records

EPA · Oregon · discharge permits by parameter

Duration in Oregon

A parameter is the substance or the property EPA writes a numeric limit for, and this page counts the Oregon permits that carry one for Duration: 5 permits, of which 0 have a recorded exceedance. Nationwide the same parameter appears in 429 permits. Each row below is one permit, and it opens the agency’s own record for that permit.

Permits

Permit holderNPDES IDCityProgramDischargerReceiving water
FOREST GROVE STPOR0020168FOREST GROVEPublicly owned treatment worksMajorTUALATIN RIVER (RM 56.7)
ROCK CREEK STPOR0029777HILLSBOROPublicly owned treatment worksMajorTUALATIN RIVER (RM 38)

Other pollutants in Oregon

Duration nationwide

What this page shows

This page covers Clean Water Act discharge permits in OR with limits on the pollutant parameter Duration. It lists 5 permits in OR with a limit on this parameter and 2 permits in OR with a recorded violation of this parameter.