NPDES SDR10B501 · Clean Water Act
TIMBERLINE ESTATES DETENTION BASIN, Sioux Falls, SD: NPDES SDR10B501 discharge permit, effluent exceedances, inspections, penalties
TIMBERLINE ESTATES DETENTION BASIN, Sioux Falls, South Dakota: General permit coverage SDR10B501, held by Timberline Estates Detention Basin; Construction stormwater; Administratively continued; issued June 28, 2004, term to March 31, 2023, by State; Industrial Building Construction.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 2 were issued before SDR10B501.
Coverages issued nearest SDR10B501
- 2003-12-01: COUNTRYSIDE SUBDIVISION, Spearfish: SDR10B224, held by Countryside Subdivision
- 2004-03-16: SOUTH MAIN ADDITION TO CITY OF HARTFORD, Sioux Falls: SDR10B309, held by South Main Addition to City of Hartford
- 2004-08-16: CRESTVIEW ESTATES HOUSING DEVELOPMENT, Yankton: SDR10B577, held by Crestview Estates Housing Development
- 2007-02-22: WESTERN MEADOWS ADDITION HARTFORD, Hartford: SDR10C962, held by Western Meadows Addition Hartford
- 2008-05-28: SCHAMBER PIT, Rapid City: SDR10D783, held by Schamber Pit
- 2008-09-16: FIRST RATE PIT, Sioux Falls: SDR10D991, held by First Rate Pit
- 2008-10-20: RIVER VALLEY ADDITION - 2008 - PHASE 1, Sioux Falls: SDR10E059, held by River Valley Addition - 2008 - Phase 1
TIMBERLINE ESTATES DETENTION BASIN among its neighbors
97 discharge permits are in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705); SDR10B501 is one.
Other permits in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705)
- 2025 CINDER AND LIME SLURRY PONDS CLOSURE BY REMOVAL, Sioux Falls: SDR10P5PU, minor, term to 2028-10-31
- ALIBI BAR, Sioux Falls: SDR10K703, minor, term to 2023-03-31
- ARROWHEAD PARKWAY PHASE 2B @ VETERANS PARKWAY, Sioux Falls: SDR10P5ET, minor, term to 2028-10-31
- ASPEN HARBOR ADDITION, Brandon: SDR10I075, minor, term to 2023-03-31
- BIG SIOUX RECREATION OUTLET IMPROVEMENT, Brandon: SDR10P5A4, minor, term to 2028-10-31
- BRANDON CORE AREA RECONSTRUCTION, PHASE 2B, Brandon: SDR10P5A2, minor, term to 2028-10-31
- BRANDON WTP EXPANSION, Brandon: SDR10K836, minor, term to 2023-03-31
- BRANDON, CITY OF (WTP), Brandon: SDG860074, minor, term to 2021-09-30
- BURNSFIELD ADDITION, Sioux Falls: SDR10K395, minor, term to 2023-03-31
- BURWELL SITE, Sioux Falls: SDR10K864, minor, term to 2023-03-31
What stands out
- Its term runs 18 years and 276 days, June 28, 2004 to March 31, 2023; the term ended 1,293 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | TIMBERLINE ESTATES DETENTION BASIN |
|---|---|
| Permittee | Timberline Estates Detention Basin |
| NPDES ID | SDR10B501 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 28, 2004 |
| Expires | March 31, 2023 |
| Agency | State |
| Address | Sioux Falls, SD 57104 |
| Subwatershed | Cactus Hills-Big Sioux River (HUC 101702031705) |
| NAICS | 236210 – Industrial Building Construction |
| SIC | 1629 – Heavy Construction |
NPDES SDR10B501: effluent limits and exceedances
TIMBERLINE ESTATES DETENTION BASIN (NPDES SDR10B501): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10B501: no pollutant row on file.
NPDES SDR10B501: inspections, violations and enforcement
NPDES SDR10B501 (TIMBERLINE ESTATES DETENTION BASIN): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10B501
NPDES SDR10B501: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10B501
NPDES SDR10B501: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.