NPDES SDR10H062 · Clean Water Act
COPPER CREEK HEIGHTS, Sioux Falls, SD: NPDES SDR10H062 discharge permit, effluent exceedances, inspections, penalties
COPPER CREEK HEIGHTS, Sioux Falls, South Dakota: General permit coverage SDR10H062, held by Copper Creek Heights; Construction stormwater; Administratively continued; issued April 1, 2015, term to March 31, 2023, by State; Highway, Street, and Bridge Construction.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 23 were issued before SDR10H062.
Coverages issued nearest SDR10H062
- 2014-06-02: DAKOTA PLAINS DAIRY, LLC, Centerville: SDR10G645, held by Dakota Plains Dairy, LLC
- 2014-06-03: SHARPE RENTAL'S, Pierre: SDR10G688, held by Sharpe Rental's
- 2014-06-24: TRAILWOOD VILLAGE SUBDIVISION PHASE 15, Rapid City: SDR10G680, held by Trailwood Village Subdivision Phase 15
- 2014-12-29: BELLE FOURCHE WIND FARM, Belle Fourche: SDR10G923, held by Belle Fourche Wind Farm
- 2015-04-01: COPPER CREEK ESTATES, Sioux Falls: SDR10H061, held by Copper Creek Estates
- 2015-04-07: SUMMIT NORTH INDUSTRIAL EXPANSION, Summit: SDR10H073, held by Summit North Industrial Expansion
- 2015-04-16: CHEYENNE PASS PHASE 5, Box Elder: SDR10H091, held by Cheyenne Pass Phase 5
- 2015-07-02: AMDAHL CATTLE BARN, Summit: SDR10H214, held by Amdahl Cattle Barn
- 2015-07-17: SHANNON COLONY DAIRY, Winfred: SDR10H234, held by Shannon Colony Dairy
- 2015-07-22: AKERSON PROPERTIES LLC, Sioux Falls: SDR10H241, held by Dakota Hardscapes Grading
COPPER CREEK HEIGHTS among its neighbors
97 discharge permits are in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705); SDR10H062 is one.
Other permits in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705)
- 2025 CINDER AND LIME SLURRY PONDS CLOSURE BY REMOVAL, Sioux Falls: SDR10P5PU, minor, term to 2028-10-31
- ALIBI BAR, Sioux Falls: SDR10K703, minor, term to 2023-03-31
- ARROWHEAD PARKWAY PHASE 2B @ VETERANS PARKWAY, Sioux Falls: SDR10P5ET, minor, term to 2028-10-31
- ASPEN HARBOR ADDITION, Brandon: SDR10I075, minor, term to 2023-03-31
- BIG SIOUX RECREATION OUTLET IMPROVEMENT, Brandon: SDR10P5A4, minor, term to 2028-10-31
- BRANDON CORE AREA RECONSTRUCTION, PHASE 2B, Brandon: SDR10P5A2, minor, term to 2028-10-31
- BRANDON WTP EXPANSION, Brandon: SDR10K836, minor, term to 2023-03-31
- BRANDON, CITY OF (WTP), Brandon: SDG860074, minor, term to 2021-09-30
- BURNSFIELD ADDITION, Sioux Falls: SDR10K395, minor, term to 2023-03-31
- BURWELL SITE, Sioux Falls: SDR10K864, minor, term to 2023-03-31
Identity
| Facility | COPPER CREEK HEIGHTS |
|---|---|
| Permittee | Copper Creek Heights |
| NPDES ID | SDR10H062 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 1, 2015 |
| Expires | March 31, 2023 |
| Agency | State |
| Address | Sioux Falls, SD 57110 |
| Subwatershed | Cactus Hills-Big Sioux River (HUC 101702031705) |
| NAICS | 237310 – Highway, Street, and Bridge Construction |
| SIC | 1629 – Heavy Construction |
NPDES SDR10H062: effluent limits and exceedances
COPPER CREEK HEIGHTS (NPDES SDR10H062): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10H062: no pollutant row on file.
NPDES SDR10H062: inspections, violations and enforcement
NPDES SDR10H062 (COPPER CREEK HEIGHTS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10H062
NPDES SDR10H062: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10H062
NPDES SDR10H062: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.