NPDES SDR10J486 · Clean Water Act
TWIN RIVERS CROSSING PHASE 1, Brandon, SD: NPDES SDR10J486 discharge permit, effluent exceedances, inspections, penalties
TWIN RIVERS CROSSING PHASE 1, Brandon, South Dakota: General permit coverage SDR10J486, held by Twin Rivers Crossing LLC; Construction stormwater; Administratively continued; issued July 1, 2019, term to March 31, 2023, by State; Commercial and Institutional Building Construction.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 92 were issued before SDR10J486.
Coverages issued nearest SDR10J486
- 2019-05-03: THE LANDING AT CITY CENTER, Box Elder: SDR10J433, held by Lhotak Properties LLC
- 2019-05-03: DONAHOE FARMS ADDITION, Sioux Falls: SDR10J448, held by Springdale LLC
- 2019-05-09: CROWNED RIDGE TRANSMISSION LINE, South Shore: SDR10J446, held by NextEra Energy
- 2019-06-12: WHISPER RIDGE EAST ADDITION, Sioux Falls: SDR10J491, held by Developing the Dakotas LLC
- 2019-06-14: STONY POINT, Watertown: SDR10J495, held by Stony Point Investments LLP
- 2019-07-02: LEOLA WATER SYSTEM IMPROVEMENTS, Leola: SDR10J521, held by City of Leola
- 2019-07-09: PRESENTATION PLACE - ABERDEEN, Aberdeen: SDR10J526, held by Avera Saint Luke's
- 2019-07-15: WQCV PROJECT, Watertown: SDR10J536, held by HCE Inc
- 2019-08-02: BRYANT AREA COMMERCIAL DEVELOPMENT - PHASE 1, Bryant: SDR10J555, held by City of Bryant
- 2019-08-06: CROWNED RIDGE II TRANSMISSION LINE, South Shore: SDR10J564, held by NextEra Energy
TWIN RIVERS CROSSING PHASE 1 among its neighbors
97 discharge permits are in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705); SDR10J486 is one.
Other permits in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705)
- 2025 CINDER AND LIME SLURRY PONDS CLOSURE BY REMOVAL, Sioux Falls: SDR10P5PU, minor, term to 2028-10-31
- ALIBI BAR, Sioux Falls: SDR10K703, minor, term to 2023-03-31
- ARROWHEAD PARKWAY PHASE 2B @ VETERANS PARKWAY, Sioux Falls: SDR10P5ET, minor, term to 2028-10-31
- ASPEN HARBOR ADDITION, Brandon: SDR10I075, minor, term to 2023-03-31
- BIG SIOUX RECREATION OUTLET IMPROVEMENT, Brandon: SDR10P5A4, minor, term to 2028-10-31
- BRANDON CORE AREA RECONSTRUCTION, PHASE 2B, Brandon: SDR10P5A2, minor, term to 2028-10-31
- BRANDON WTP EXPANSION, Brandon: SDR10K836, minor, term to 2023-03-31
- BRANDON, CITY OF (WTP), Brandon: SDG860074, minor, term to 2021-09-30
- BURNSFIELD ADDITION, Sioux Falls: SDR10K395, minor, term to 2023-03-31
- BURWELL SITE, Sioux Falls: SDR10K864, minor, term to 2023-03-31
What stands out
- Its term runs 3 years and 273 days, July 1, 2019 to March 31, 2023; the term ended 1,293 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | TWIN RIVERS CROSSING PHASE 1 |
|---|---|
| Permittee | Twin Rivers Crossing LLC |
| NPDES ID | SDR10J486 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 1, 2019 |
| Expires | March 31, 2023 |
| Agency | State |
| Address | Brandon, SD 57005 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Cactus Hills-Big Sioux River (HUC 101702031705) |
| NAICS | 236220 – Commercial and Institutional Building Construction |
| SIC | 1542 – Nonresidential Construction |
NPDES SDR10J486: effluent limits and exceedances
TWIN RIVERS CROSSING PHASE 1 (NPDES SDR10J486): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10J486: no pollutant row on file.
NPDES SDR10J486: inspections, violations and enforcement
NPDES SDR10J486 (TWIN RIVERS CROSSING PHASE 1): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10J486
NPDES SDR10J486: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10J486
NPDES SDR10J486: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.