NPDES SDR10K638 · Clean Water Act
HOLLY POND SAND MINE, Brandon, SD: NPDES SDR10K638 discharge permit, effluent exceedances, inspections, penalties
HOLLY POND SAND MINE, Brandon, South Dakota: General permit coverage SDR10K638, held by Holly Pond Sand Mine; Construction stormwater; Administratively continued; issued June 30, 2021, term to March 31, 2023, by State; discharges to natural drainage to Big Sioux River; Industrial Building Construction.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 216 were issued before SDR10K638. Holly Pond Sand Mine holds 2 permits in South Dakota.
Other permits held by Holly Pond Sand Mine
- HOLLY POND SAND MINE, Brandon: SDR10K409, issued 2021-06-16
Coverages issued nearest SDR10K638
- 2021-06-22: HAY CREEK RANCH, Belle Fourche: SDR10K281, held by Hay Creek Ranch
- 2021-06-24: EAST DRY FERTILIZER WAREHOUSE, Yankton: SDR10K287, held by East Dry Fertilizer Warehouse
- 2021-06-24: WATER RECLAMATION FACILITY IMPROVEMENTS, Sioux Falls: SDR10P125, held by Water Reclamation Facility Improvements
- 2021-06-25: CALL STORAGE UNITS, Sioux Falls: SDR10K290, held by Call Storage Units
- 2021-06-25: EMPIRE APARTMENTS AT MARION ROAD, Sioux Falls: SDR10K316, held by Empire Apartments at Marion Road
- 2021-07-01: OUTDOOR STORAGE, Sioux Falls: SDR10K304, held by Outdoor Storage
- 2021-07-01: GARY WIEMAN ADDITION PHASE 1, Marion: SDR10K353, held by Gary Wieman Addition Phase 1
- 2021-07-02: MILLER RANCH PHASE 1, Spearfish: SDR10K301, held by Miller Ranch Phase 1
- 2021-07-06: DONNELLY ADDITION, Vermillion: SDR10K306, held by Donnelly Addition
- 2021-07-07: LONE COYOTE SUBDIVISION, Hermosa: SDR10K307, held by Lone Coyote Subdivision
HOLLY POND SAND MINE among its neighbors
97 discharge permits are in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705); SDR10K638 is one.
Other permits in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705)
- 2025 CINDER AND LIME SLURRY PONDS CLOSURE BY REMOVAL, Sioux Falls: SDR10P5PU, minor, term to 2028-10-31
- ALIBI BAR, Sioux Falls: SDR10K703, minor, term to 2023-03-31
- ARROWHEAD PARKWAY PHASE 2B @ VETERANS PARKWAY, Sioux Falls: SDR10P5ET, minor, term to 2028-10-31
- ASPEN HARBOR ADDITION, Brandon: SDR10I075, minor, term to 2023-03-31
- BIG SIOUX RECREATION OUTLET IMPROVEMENT, Brandon: SDR10P5A4, minor, term to 2028-10-31
- BRANDON CORE AREA RECONSTRUCTION, PHASE 2B, Brandon: SDR10P5A2, minor, term to 2028-10-31
- BRANDON WTP EXPANSION, Brandon: SDR10K836, minor, term to 2023-03-31
- BRANDON, CITY OF (WTP), Brandon: SDG860074, minor, term to 2021-09-30
- BURNSFIELD ADDITION, Sioux Falls: SDR10K395, minor, term to 2023-03-31
- BURWELL SITE, Sioux Falls: SDR10K864, minor, term to 2023-03-31
What stands out
- Its term runs 1 year and 274 days, June 30, 2021 to March 31, 2023; the term ended 1,293 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | HOLLY POND SAND MINE |
|---|---|
| Permittee | Holly Pond Sand Mine |
| NPDES ID | SDR10K638 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 30, 2021 |
| Expires | March 31, 2023 |
| Agency | State |
| Address | Brandon, SD 57005 |
| Receiving water | natural drainage to Big Sioux River |
| Subwatershed | Cactus Hills-Big Sioux River (HUC 101702031705) |
| NAICS | 236210 – Industrial Building Construction |
| SIC | 1629 – Heavy Construction |
NPDES SDR10K638: effluent limits and exceedances
HOLLY POND SAND MINE (NPDES SDR10K638): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10K638: no pollutant row on file.
NPDES SDR10K638: inspections, violations and enforcement
NPDES SDR10K638 (HOLLY POND SAND MINE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10K638
NPDES SDR10K638: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10K638
NPDES SDR10K638: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.