NPDES SDR10K782 · Clean Water Act
THE SANCTUARY DEVELOPMENT, Sioux Falls, SD: NPDES SDR10K782 discharge permit, effluent exceedances, inspections, penalties
THE SANCTUARY DEVELOPMENT, Sioux Falls, South Dakota: General permit coverage SDR10K782, held by The Sanctuary Development; Construction stormwater; Administratively continued; issued July 21, 2022, term to March 31, 2023, by State; discharges to unnamed tributary to Big Sioux River.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 381 were issued before SDR10K782.
Coverages issued nearest SDR10K782
- 2022-07-20: 2019 STORM REPAIRS 38, Pine Ridge: SDR10I02C, held by Oglala Sioux Tribe Department of Transportation
- 2022-07-20: 2019 STORM REPAIRS 61, Loneman: SDR10I02D, held by Oglala Sioux Tribe Department of Transportation
- 2022-07-20: 2019 STORM REPAIRS 2-7, Rockyford: SDR10I02E, held by Oglala Sioux Tribe Department of Transportation
- 2022-07-20: 2019 STORM REPAIRS 19-1, Kyle: SDR10I02F, held by Oglala Sioux Tribe Department of Transportation
- 2022-07-20: 2019 STORM REPAIRS 20-1, Allen: SDR10I02G, held by Oglala Sioux Tribe Department of Transportation
- 2022-07-21: HIGH SCHOOL TRACK & FIELD IMPROVEMENTS, Watertown: SDR10K783, held by High School Track & Field Improvements
- 2022-07-22: SIOUX POINT ROAD REALIGNMENT, North Sioux City: SDR10P278, held by City of North Sioux City
- 2022-07-25: UTILITY IMPROVEMENTS PHASE II, Elkton: SDR10K772, held by Utility Improvements Phase II
- 2022-07-25: ADDITION TO VERMILLION MIDDLE SCHOOL, Vermillion: SDR10K786, held by Addition to Vermillion Middle School
- 2022-07-25: CLAY-UNION ELECTRIC CORPORATION, Vermillion: SDR10K789, held by Clay-Union Electric Corporation
THE SANCTUARY DEVELOPMENT among its neighbors
97 discharge permits are in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705); SDR10K782 is one.
Other permits in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705)
- 2025 CINDER AND LIME SLURRY PONDS CLOSURE BY REMOVAL, Sioux Falls: SDR10P5PU, minor, term to 2028-10-31
- ALIBI BAR, Sioux Falls: SDR10K703, minor, term to 2023-03-31
- ARROWHEAD PARKWAY PHASE 2B @ VETERANS PARKWAY, Sioux Falls: SDR10P5ET, minor, term to 2028-10-31
- ASPEN HARBOR ADDITION, Brandon: SDR10I075, minor, term to 2023-03-31
- BIG SIOUX RECREATION OUTLET IMPROVEMENT, Brandon: SDR10P5A4, minor, term to 2028-10-31
- BRANDON CORE AREA RECONSTRUCTION, PHASE 2B, Brandon: SDR10P5A2, minor, term to 2028-10-31
- BRANDON WTP EXPANSION, Brandon: SDR10K836, minor, term to 2023-03-31
- BRANDON, CITY OF (WTP), Brandon: SDG860074, minor, term to 2021-09-30
- BURNSFIELD ADDITION, Sioux Falls: SDR10K395, minor, term to 2023-03-31
- BURWELL SITE, Sioux Falls: SDR10K864, minor, term to 2023-03-31
What stands out
- Its term runs 253 days, July 21, 2022 to March 31, 2023; the term ended 1,264 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | THE SANCTUARY DEVELOPMENT |
|---|---|
| Permittee | The Sanctuary Development |
| NPDES ID | SDR10K782 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 21, 2022 |
| Expires | March 31, 2023 |
| Agency | State |
| Address | Sioux Falls, SD 99999 |
| Receiving water | unnamed tributary to Big Sioux River |
| Subwatershed | Cactus Hills-Big Sioux River (HUC 101702031705) |
NPDES SDR10K782: effluent limits and exceedances
THE SANCTUARY DEVELOPMENT (NPDES SDR10K782): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10K782: no pollutant row on file.
NPDES SDR10K782: inspections, violations and enforcement
NPDES SDR10K782 (THE SANCTUARY DEVELOPMENT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10K782
NPDES SDR10K782: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10K782
NPDES SDR10K782: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.