NPDES SDR10P596 · Clean Water Act
EAST ARROWHEAD PARKWAY, Sioux Falls, SD: NPDES SDR10P596 discharge permit, effluent exceedances, inspections, penalties
EAST ARROWHEAD PARKWAY, Sioux Falls, South Dakota: General permit coverage SDR10P596, held by KEBA Development, LLC; Construction stormwater; Effective; issued July 15, 2024, term to October 31, 2028, by SDDANR.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 611 were issued before SDR10P596.
Coverages issued nearest SDR10P596
- 2024-06-28: LOT 1R BLOCK 4 SEGER CROSSING, Box Elder: SDR10P593, held by Green Knight LTD
- 2024-06-28: TRACT 1 AND 2 OF CHEYENNE PASS APARTMENTS, Box Elder: SDR10P59E, held by Zeisler Construction
- 2024-06-28: CITY OF PIEDMONT, SOUTH DAKOTA WATER SUPPLY AND DISTRIBUTION SYSTEM 2ND STREET, Piedmont: SDR10P59S, held by Woelber Excavating LLC
- 2024-07-15: SOUTH PLANT IMPROVEMENTS CONSTRUCTION PACKAGE 2, Rapid City: SDR10P58K, held by PKG Contracting, Inc.
- 2024-07-15: AMERICAN ESTATES, Belle Fourche: SDR10P58U, held by AusCar X, LLC
- 2024-07-15: WHITE WATER AND SANITARY SEWER UTILITY REPLACEMENT - 2024, White: SDR10P59D, held by City of White
- 2024-07-15: HEBRON BRICK SALES OFFICE, Rapid City: SDR10P59M, held by EagleRidge Partners, LLC
- 2024-07-24: OUTDOOR CAMPUS EAST, ARCHERY EXPANSION PHASES 1 & 2, Sioux Falls: SDR10P59P, held by South Dakota Game, Fish and Parks
- 2024-07-24: RIDGE VIEW ESTATES, Belle Fourche: SDR10P5AA, held by Mountain View Development Group, LLC
- 2024-08-02: LINCOLN HALL CONSTRUCTION, Aberdeen: SDR10P58I, held by Office of the State Engineer
EAST ARROWHEAD PARKWAY among its neighbors
97 discharge permits are in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705); SDR10P596 is one.
Other permits in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705)
- 2025 CINDER AND LIME SLURRY PONDS CLOSURE BY REMOVAL, Sioux Falls: SDR10P5PU, minor, term to 2028-10-31
- ALIBI BAR, Sioux Falls: SDR10K703, minor, term to 2023-03-31
- ARROWHEAD PARKWAY PHASE 2B @ VETERANS PARKWAY, Sioux Falls: SDR10P5ET, minor, term to 2028-10-31
- ASPEN HARBOR ADDITION, Brandon: SDR10I075, minor, term to 2023-03-31
- BIG SIOUX RECREATION OUTLET IMPROVEMENT, Brandon: SDR10P5A4, minor, term to 2028-10-31
- BRANDON CORE AREA RECONSTRUCTION, PHASE 2B, Brandon: SDR10P5A2, minor, term to 2028-10-31
- BRANDON WTP EXPANSION, Brandon: SDR10K836, minor, term to 2023-03-31
- BRANDON, CITY OF (WTP), Brandon: SDG860074, minor, term to 2021-09-30
- BURNSFIELD ADDITION, Sioux Falls: SDR10K395, minor, term to 2023-03-31
- BURWELL SITE, Sioux Falls: SDR10K864, minor, term to 2023-03-31
Identity
| Facility | EAST ARROWHEAD PARKWAY |
|---|---|
| Permittee | KEBA Development, LLC |
| NPDES ID | SDR10P596 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 15, 2024 |
| Expires | October 31, 2028 |
| Agency | SDDANR |
| Address | Sioux Falls, SD 57110 |
| Subwatershed | Cactus Hills-Big Sioux River (HUC 101702031705) |
NPDES SDR10P596: effluent limits and exceedances
EAST ARROWHEAD PARKWAY (NPDES SDR10P596): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10P596: no pollutant row on file.
NPDES SDR10P596: inspections, violations and enforcement
NPDES SDR10P596 (EAST ARROWHEAD PARKWAY): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10P596
NPDES SDR10P596: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10P596
NPDES SDR10P596: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.