NPDES SDR10P5L1 · Clean Water Act
TENCATE RIDGE, Sioux Falls, SD: NPDES SDR10P5L1 discharge permit, effluent exceedances, inspections, penalties
TENCATE RIDGE, Sioux Falls, South Dakota: General permit coverage SDR10P5L1, held by River Ridge, LLC; Construction stormwater; Effective; issued June 3, 2025, term to October 31, 2028, by SDDANR.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 848 were issued before SDR10P5L1.
Coverages issued nearest SDR10P5L1
- 2025-05-30: ARTESSA ADDITION, Harrisburg: SDR10P5LX, held by Artessa, LLC
- 2025-05-30: PCN 08W4, North Sioux City: SDR10P5MC, held by SD Department of Transportation
- 2025-05-30: PCN 08W5, Dakota Dunes: SDR10P5MD, held by SD Department of Transportation
- 2025-05-30: PCN 08NA, Colome: SDR10P5ME, held by SD Department of Transportation
- 2025-06-03: TURNER COUNTY COURTHOUSE DEMOLITION/NEW BUILDING, Parker: SDR10P5HF, held by Turner County
- 2025-06-09: FELLOWSHIP ADVENTURES - SITE IMPROVEMENTS, Presho: SDR10P5E1, held by Fellowship Adventures
- 2025-06-09: SD HIGHWAY 28 STOCKPILE SITE 1, Estelline: SDR10P5JH, held by Bowes Construction, Inc.
- 2025-06-09: SD HIGHWAY 28 BORROW PIT 1, Estelline: SDR10P5JI, held by Bowes Construction, Inc
- 2025-06-09: SD HIGHWAY 28 STOCKPILE SITE 2, Estelline: SDR10P5JJ, held by Bowes Construction, Inc.
- 2025-06-09: SD HIGHWAY 28 STOCKPILE SITE 3, Toronto: SDR10P5JK, held by Bowes Construction, Inc
TENCATE RIDGE among its neighbors
97 discharge permits are in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705); SDR10P5L1 is one.
Other permits in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705)
- 2025 CINDER AND LIME SLURRY PONDS CLOSURE BY REMOVAL, Sioux Falls: SDR10P5PU, minor, term to 2028-10-31
- ALIBI BAR, Sioux Falls: SDR10K703, minor, term to 2023-03-31
- ARROWHEAD PARKWAY PHASE 2B @ VETERANS PARKWAY, Sioux Falls: SDR10P5ET, minor, term to 2028-10-31
- ASPEN HARBOR ADDITION, Brandon: SDR10I075, minor, term to 2023-03-31
- BIG SIOUX RECREATION OUTLET IMPROVEMENT, Brandon: SDR10P5A4, minor, term to 2028-10-31
- BRANDON CORE AREA RECONSTRUCTION, PHASE 2B, Brandon: SDR10P5A2, minor, term to 2028-10-31
- BRANDON WTP EXPANSION, Brandon: SDR10K836, minor, term to 2023-03-31
- BRANDON, CITY OF (WTP), Brandon: SDG860074, minor, term to 2021-09-30
- BURNSFIELD ADDITION, Sioux Falls: SDR10K395, minor, term to 2023-03-31
- BURWELL SITE, Sioux Falls: SDR10K864, minor, term to 2023-03-31
What stands out
- Its term runs 3 years and 150 days, June 3, 2025 to October 31, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | TENCATE RIDGE |
|---|---|
| Permittee | River Ridge, LLC |
| NPDES ID | SDR10P5L1 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 3, 2025 |
| Expires | October 31, 2028 |
| Agency | SDDANR |
| Address | Sioux Falls, SD 57106 |
| Subwatershed | Cactus Hills-Big Sioux River (HUC 101702031705) |
NPDES SDR10P5L1: effluent limits and exceedances
TENCATE RIDGE (NPDES SDR10P5L1): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10P5L1: no pollutant row on file.
NPDES SDR10P5L1: inspections, violations and enforcement
NPDES SDR10P5L1 (TENCATE RIDGE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10P5L1
NPDES SDR10P5L1: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10P5L1
NPDES SDR10P5L1: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.